Nanticoke Generating Station

From Wikipedia, the free encyclopedia
Nanticoke Generating Station
Location of Nanticoke Generating Station
Country Canada
Location Nanticoke, Haldimand County, Ontario
Coordinates 42°48′0″N 80°3′1″W / 42.80000°N 80.05028°W / 42.80000; -80.05028Coordinates: 42°48′0″N 80°3′1″W / 42.80000°N 80.05028°W / 42.80000; -80.05028
Status Active
Commission date 1972–1978
Owner(s) Ontario Power Generation
Power station
Primary fuel Coal
Biomass/Natural Gas (prospective)
Power generation
Maximum capacity 1,880 MW[2]

The Nanticoke Generating Station was the largest coal-fired power plant in North America, delivering up to 1,880 MW[3] of power into the southern Ontario power grid from its base in Nanticoke, Ontario, Canada. Prior to unit shutdowns, its generating capacity was 3,964 MW.[4] It is owned by Ontario Power Generation. It was scheduled for decommission in early 2009 as part of the Government of Ontario's commitment to eliminate coal power, but this was repeatedly delayed. All of its eight units have been shut down. Some units may be converted to use biomass or natural gas in the future.[5] Prior to the commencement of decommissioning, Nanticoke was one of Canada's top ten single sources of greenhouse gases.[6]

History

The Nanticoke Generating Station is built on the site of the "Battle of Nanticoke", where in 1813 the Norfolk volunteer militia routed a band of American marauders who had been pillaging area farms and terrorizing the country, an exploit that inspired the British military forces and the people of Upper Canada during the War of 1812. The site was designated a National Historic Site of Canada in 1924.[7]

Ontario Hydro revealed plans to build a 4,000MW fossil-fuel generating station near Long Point, Ontario in 1967.[8] Its current site was selected in Nanticoke, Ontario, because of the nearby harbour, the proximity of United States coal supplies, and proximity to much of Ontario's population.[8] The construction of the plant cost CAN$800 million and operations started in 1972.[2] Eight pulverized coal-fired steam generators were built in phases between 1973 and 1978.[8]

By 1981, the plant was consuming 35,000 tonnes of coal per day. Over the years, another $900 million has been invested in making the plant more energy efficient, robust, and improving its emissions.[2]

Plant operations

Power generation and distribution

At full capacity (4000MW) with all eight generating units functioning, the station's annual electricity production had been as high as 24 billion kilowatt-hours (kWh), enough electricity to run nearly 2.5 million households.[2] Although the plant houses eight generating units, four of those units have since been retired.[2] (Two were retired in 2010, and two were retired in 2011.[9]) The remaining four units are purported to be retired by the end of 2014. [10]

Power generation at this plant is on a stand-by basis, only operating during peak levels of energy consumption, or when other generating facilities are unavailable. At other times the plant remains idle.[2] When demand for electricity is high, the remaining four active generating units are put into service, with the maximum potential to produce approximately 5% of Ontario's total generating capacity. (1880MW[2] out of the 34,079MW of existing power generation in the province as of January 2012.[11]) The plant is connected to the power grid by numerous 230,000 and 500,000 volt transmission lines.[12]

Cooling water for the plant is drawn from Lake Erie using two pipes that are 6.5m in diameter, stretch 550m offshore, and sit 10m below the surface.[13] The plant has two multi-flue smokestacks which are both 198 m (650 ft) tall. [14][15] A dock on the shore of the site allows ships to deliver coal to an on-site stock pile, which can hold up to 4.5 megatonnes.

At its peak, Nanticoke employed approximately 634 staff from the area, although that number has dropped to approximately 234 with the retirement of four of its eight generating units.[2][16]

Emissions

Emissions from Nanticoke from 2004 to 2009.[1]

The Nanticoke station used to be one of Canada's largest greenhouse gas emitters and polluters.[17] In 2001, it was the largest single source of greenhouse gases according to Environment Canada.[18] Due to major reductions in output since 2009, it was eventually surpassed by facilities in Alberta.[19][20]

Greenhouse Gases (2011)[1]
Greenhouse gas Sum (tonnes) Sum (tonnes CO2e*)
CO2 2,818,527.50 2,818,528
CH4 155.72 3,270
N2O 46.78 14,501
Total - 2,836,299

*Calculated figures for CO2e are rounded to the nearest tonne.

Total emissions, 2004-2011[1]
Year Emissions (tonnes CO2e)
2004 14,715,952
2005 17,629,437
2006 16,271,466
2007 17,887,649
2008 15,427,913
2009 6,037,137
2010 8,601,215
2011 2,836,299

Decommissioning

The Government of Ontario had originally targeted to phase out all of its coal plants by 2009, but abandoned this target in 2006 to the ire of organizations representing nurses and physicians, community groups and environment groups.[21] The province could not replace Nanticoke's energy output by the deadline. The province was examining replacing this output using nuclear power by refurbishing its existing fleet, and building two additional reactors at the Darlington Nuclear Generating Station. Bruce Power, Canada's only private nuclear power company, also proposed building two reactors on former Stelco lands in Nanticoke. However, this was met with immediate opposition and dismissal from the government. "It's a speculative move on the part of a private company...It doesn't enjoy the support, encouragement [or] approval...of the Government of Ontario," stated George Smitherman, Minister of Energy and Infrastructure.[22]

Currently, a regulation under the Environmental Protection Act (EPA) stipulates that coal will not be used in Ontario to generate electricity past December 31, 2014.[23] Nanticoke is scheduled to phase out its use of coal and switch to using biomass. While this substitution will result in lower net greenhouse gas emissions, it will also result in lower electricity generation.[24] Premier Dalton McGuinty announced 2500 MW of green energy projects in April 2010. These projects will help Ontario move towards greener electricity production, and help compensate for the decreased generation at Nanticoke, keeping it on track towards the current scheduled phase-out date of 2014.[25]

Two units at Nanticoke were shut down in fall 2010.[26] Another two were shut down in 2011.[27]. The final four were shut down on December 31, 2013.[28].

See also

Notes

  1. 1.0 1.1 1.2 "Facility and GHG Information - Nanticoke Generating Station". Environment Canada. Retrieved 29 November 2013. 
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "Nanticoke Generating Station". Ontario Power Generation. Retrieved 25 January 2011. 
  3. "Naticoke Generating Station brochure". Ontario Power Generation. January 2012. Retrieved 11 January 2013. 
  4. "Weather and Ontario's Electricity System". Independent Electricity System Operator. July 2008. Retrieved 21 August 2012. 
  5. "Naticoke Generating Station". Ontario Power Generation. Retrieved 11 January 2013. 
  6. "GHG Facility Table 2009". Environment Canada. 15 March 2010. Retrieved 21 August 2012. 
  7. Nanticoke National Historic Site of Canada. Canadian Register of Historic Places.
  8. 8.0 8.1 8.2 Wiancko 1981, p. 96
  9. http://www.ieso.ca/imoweb/media/md_supply.asp
  10. http://news.ontario.ca/mei/en/2010/11/energy-news-release-november-23-2010.html
  11. http://www.ieso.ca/imoweb/media/md_supply.asp
  12. http://www.ieso.ca/imoweb/pubs/marketReports/OntTxSystem_2011nov.pdf
  13. http://www3.carleton.ca/fecpl/pdfs/Cat_Carp_MS.pdf
  14. http://skyscraperpage.com/diagrams/?buildingID=3871
  15. http://skyscraperpage.com/diagrams/?buildingID=3872
  16. http://chch.com/index.php/home/item/3737-jobs-disappearing-at-nanticoke-generating-station
  17. http://www.ctv.ca/servlet/ArticleNews/print/CTVNews/1027384052424_22793252?hub=CTVNewsAt11&subhub=PrintStory
  18. http://www.citytv.com/toronto/citynews/news/local/article/12313--nanticoke-facility-worst-single-source-of-greenhouse-gases-study-finds
  19. http://ec.gc.ca/ges-ghg/default.asp?lang=En&n=DF08C7BA-1
  20. "GHG Facility Table 2010". Environment Canada. Retrieved 21 December 2012. 
  21. Ecojustice (11 October 2006). "Ontario abandons coal phase-out, guts smog and climate change plans". Retrieved 24 April 2010. 
  22. CBC News (1 November 2008). "Ont. government signals opposition to Bruce Power nuclear reactors". CBC. Retrieved 25 April 2010. 
  23. Ministry of Energy and Infrastructure (22 January 2009). "Frequently Asked Questions". Retrieved 24 April 2010. 
  24. "Naticoke Generating Station brochure". Ontario Power Generation. February 2011. Retrieved 21 August 2012. 
  25. CBC News Now - Green Energy for Ontario (Television). CBC News. 8 April 2010. 
  26. Talaga, Tanya (3 September 2009). "Ontario shuts 4 coal-fired units". The Star (Toronto). 
  27. "Ontario's Long-Term Energy Plan". Government of Ontario. 2010. Retrieved 22 August 2012. 
  28. "OPG'S NANTICOKE STATION STOPS BURNING COAL". Ontario Power Generation. 2014. Retrieved 15 January 2014. 

References

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.