Nanchang Metro
Nanchang Rail Transit | |
---|---|
Background | |
Locale | Nanchang, Jiangxi, China |
Transit type | Rail transit |
Number of lines |
2 (under construction) |
Operation | |
Began operation | 2015 (Line 1)[1] |
Operator(s) | Nanchang Rail Transit Group Co., Ltd. |
Technical | |
System length | 162 kilometres (101 mi)(initial plan) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Nanchang Rail Transit | |||||||||||
Simplified Chinese | 南昌轨道交通 | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 南昌軌道交通 | ||||||||||
| |||||||||||
Nanchang Metro | |||||||||||
Simplified Chinese | 南昌地铁 | ||||||||||
Traditional Chinese | 南昌地鐵 | ||||||||||
|
Nanchang Metro (also known as Nanchang Rail Transit in official documents) is a metro system in Nanchang, Jiangxi, China.[1] 5 lines are currently planned with a total length of 163 km[2] (excluding the extension of Line 1 & Line 2 planned in the Phase 2).
The network is expected to exceed 122.2 km in length in 2020 after Phase 2 was finished.[3] Additional complementary lines are also being considered.[4]
History
Origins
The construction of a rail transit system in Nanchang was first proposed in the beginning of the 2000s:[5] In August 2005, Jiangxi Provincial Development & Reform Commission and Nanchang City Government replied to the proposal of building a metro system, and the City Government considered listing the proposal in the Eleventh Five-year plan.[6] In November, a plan of 4 metro and 1 light rail was drafted.[7][8] In 2006, the City officially started the research of building a rail transit system.[9] In the second half of 2007, the prophase research of the construction of the system was initiated. [5] On 30 July 2008, the construction of Nanchang Metro was formally included in the priority agenda.[10]
Plans
Initial Plan
In 2008, Nanchang was approved to build a rail transit system by the State Council,[11] and Nanchang Rail Transit Group Co., Ltd. was incorporated in 16 October 2008 to construct and operate Nanchang Metro.[12] On 15 September, the planned 5 routes were notified to the public,[13][14][15][16] which was approved by the State Council in July 2009.[17][18] On 29 July 2009, the construction of Nanchang City Rapid Rail Transit officially began,[19][20] and also on the same day the detailed route and construction plan of the five lines was proclaimed at the press conference.[21]
In April 2013, the Government planned to acquire approval for all 5 lines by 2014, start constructing all planned lines from 2015, and plan Line 6 to Line 10 to complement the existing network.[22][23]
Phase 2
On 31 May 2013, Nanchang Government submitted three candidate plans for the Phase 2 construction (2014-2020) to the expert panel,[24][25] which chose the compromising Plan 2.[26][27] According to the plan, Line 2 will be extended to both directions from 2014,Line 1 from 2016; the construction of Line 3 will start as soon as September 2014, and Line 4 will be constructed as soon as September 2015.[28][29]
Construction
Construction of Line 1 has started on 29 July 2009,[30] and the line is planned to be operational by Q4 2015. As of August 2013, the construction of Line 2 is also started.
Infrastructure
Lines
Name | No. of Sta. | Length (km) | Route | |
---|---|---|---|---|
Line 1 | 24[† 1][31] | 28.7[† 1] | Lehua—Jiaoqiao—Fenghe Bei Dadao—Fenghe 2 Lu—Shimao Lu—Zhongshan Xi Lu—Zhongshan Lu—Bayi Square—Beijing Lu—Yaohu Dadao | |
Line 2 | 21[† 1] | 23.3[† 1] | Jiulonghu—CR Nanchang West Station—Xizhan Dajie—Guoti Dadao—Fenghe Dadao—Fenghuang 1 Lu—Yangming Lu—Bayi Dadao—Luoyang Lu—CR Nanchang Station—Shunwai Lu—Shanghai Lu—Guangzhou Lu—Luojia Town | |
Line 3 | 22 | 27.2 | Yaohu North—Minfeng Lu—Danxia Lu—Qingshan Lu—Bayi Dadao—Dieshan Lu—Xiangshan Bei Lu—Xiangshan Nan Lu—Shenjinta Jie—Shizi Jie—Jingshan Bei Lu—Yingbin Dadao—Liantang | |
Line 4 | 25 | 35.2 | Wangcheng—CR Nanchang West Station—Xizhan Dajie—Chaoyangzhou South—Fusheng Lu—Hongcheng Lu—Hongdu Dadao—Nanjing Dong Lu—Shanghai Lu—Guowei Lu—Huoju Dadao | |
Line 5 | 25 | 34 | Xialuo—Changleng Dadao—Xuefu Dadao—Honggu Nan Dadao—Xuefu Dadao—Chaoyang Dadao—Jiangling Xi Lu—Gaoxin Dadao |
Rolling Stock
Nanchang Metro planned to operate with Model-B rolling stock, whose cars are 2.8 m in width, 3.8 m in height and 3.8m in length, providing the system with maximum capacity of 30 000 to 55 000 passenger per hour per direction.[32]。
Ticketing
Single ticket will be available as plastic packaged RFID coin like many other cities in China.[33] Existing pre-payment smart cards such as local Hongcheng Tong (Chinese: 洪城通) are also expected to used in Nanchang Metro.
Notes
References
Wikimedia Commons has media related to Nanchang Metro. |
- ↑ 1.0 1.1 南昌地铁1号线推迟至2015年底通车 明确11个建设节点
- ↑ 南昌地铁远景规划征询民意 将有5条地铁线路
- ↑ 黄培红 (2013-06-01). "南昌第二轮地铁建设规划94.1公里". 信息日报. Retrieved 2013-08-10.
- ↑ 袁思东 (2013-04-11). "南昌考虑再建五条地铁线 拟规划到十号线形成半小时经济圈". 信息日报. Retrieved 2013-08-10.
- ↑ 5.0 5.1 南昌地铁建设备忘录--大江专题
- ↑ “南昌建地铁”提案获答复
- ↑ 南昌初步规划4条地铁 并将建设一条轻轨线
- ↑ 南昌4条地铁布局初定
- ↑ 南昌将启动轨道交通研究 红谷隧道工程设计年内完成
- ↑ 南昌地铁建设列入政府重要议程
- ↑ 审批权下放 南昌建地铁有望加速
- ↑ 南昌轨道交通有限公司 - 社会日常生活 - 百科全书 - 价值中国网
- ↑ 南昌市城市快速轨道交通线网及建设规划公众征询意见
- ↑ 南昌地铁远景规划征询民意 将有5条地铁线路
- ↑ 南昌地铁远景规划征询民意(图)
- ↑ 南昌地铁公司挂牌 远景规划5条地铁线
- ↑ 国务院同意南昌建设地铁 1号线有望年内动工
- ↑ 南昌市城市轨道交通近期建设规划(2009-2016年)通过批准
- ↑ 南昌城市快速轨道交通工程开工奠基
- ↑ 地铁,一个城市梦想如花绽放(图)
- ↑ 南昌地铁线路站点公布 1号线2014年通车
- ↑ 南昌考虑再建五条地铁线 拟规划到十号线形成半小时经济圈
- ↑ 南昌市市长陈俊卿:2015年五条地铁全部开建
- ↑ 南昌未来7年有望建成3至4条地铁
- ↑ 专家把脉南昌地铁第二轮建设规划 三套方案备选
- ↑ 地铁3号线一期工程明年下半年或开工
- ↑ 信息日报. "南昌第二轮地铁建设规划94.1公里". 大江网. Retrieved 2013-08-10.
- ↑ 地铁3号线一期工程明年下半年或开工
- ↑ 南昌地铁三四号线拟建19.7公里高架 1号线北延至昌北机场
- ↑ 南昌城市快速轨道交通工程开工奠基
- ↑ 南昌市轨道交通1号线一期工程可行性研究报告获批准
- ↑ 南昌地铁拟采用B型车 单向每小时载乘客5.5万人次
- ↑ 南昌地铁单程票采用筹码式车票
|
|