Mercury-Atlas 4

From Wikipedia, the free encyclopedia
Mercury-Atlas 4

The launch of Mercury-Atlas 4
Mission type Test flight
Operator NASA
Harvard designation 1961 Alpha Alpha 1
SATCAT № 183
Mission duration 1 hour, 49 minutes, 20 seconds
Distance travelled 41,919 kilometers (26,047 mi)
Orbits completed 1
Spacecraft properties
Spacecraft Mercury No.8
Manufacturer McDonnell Aircraft
Launch mass 1,224.7 kilograms (2,700 lb)
Start of mission
Launch date September 13, 1961, 14:04:16 (1961-09-13UTC14:04:16Z) UTC
Rocket Atlas LV-3B
Launch site Cape Canaveral LC-14
End of mission
Landing date September 13, 1961, 15:53:36 (1961-09-13UTC15:53:37Z) UTC
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee 156 kilometers (84 nmi)
Apogee 248 kilometers (134 nmi)
Inclination 32.57 degrees
Period 88.6 minutes
Epoch September 13, 1961


Project Mercury
Mercury-Atlas series
 Mercury-Atlas 3 Mercury-Atlas 5

Mercury-Atlas 4 was an unmanned spaceflight of the Mercury program. It was launched on September 13, 1961 at 14:09 UTC from Launch Complex 14 at Cape Canaveral, Florida. A Crewman Simulator instrument package was aboard. The craft orbited the Earth once.

Simulator in spacecraft
Simulator in spacecraft

At this time, NASA was getting increasingly frustrated with the Atlas's poor launch record. Of four Mercury-Atlas flights so far, two (MA-1 and MA-3) had been total failures. One (Big Joe) had been a partial success and the otherwise completely successful MA-2 had experienced propellant slosh problems. In addition, the Atlas had not performed well in unmanned programs either as three Atlas-Able lunar probe launches in 195960 had all failed. The Air Force was also experiencing problems with military launches as a MIDAS early warning satellite and a SAMOS photoreconnaissance satellite launched with AtlasAgenas both failed to orbit during 1960. Only a few days before the flight of MA4 in September 1961, an AtlasAgena carrying a SAMOS satellite fell back on the launch pad at Vandenberg AFB, producing a spectacular explosion. Atlas ICBM tests at this time were still routinely failing as well.

These incidents produced a series of confrontations between NASA and Convair, the builders of the Atlas. The latter argued that many of the failed NASA and Air Force space launches were due to faults of the upper stages or payload rather than the Atlas itself. NASA for their part were left in a difficult situation as the Atlas was the only launch vehicle available that could put the Mercury into orbit, unless they wanted to wait 23 years for the Titan II ICBM to become operational.

There were a series of delays getting the Atlas and Mercury capsule ready in part due to extensive modifications made to the former. Vehicle 88D did not undergo its factory rollout inspection until June 30 and delivery to the Cape waited until July 15. Moreover, the flight was not going to use Mercury capsule #9 as planned, but instead capsule #8, which had been recovered from the MA3 launch and refurbished. Capsule #8 was also the last of the older models with small port windows, no landing bag, and a heavy locking mechanism on the hatch.

Further delays happened when it was discovered that the brand of transistor used in both the Atlas and Mercury were prone to forming solder balls, thus the entire last week of August was spent laboriously repairing them.[1]

In August, the Soviet Union orbited cosmonaut Gherman Titov in Vostok 2 for a daylong flight, producing stunned disbelief in the US and paranoia in some quarters as Soviet premier Nikita Khrushchev proclaimed in a speech afterwards "We have launched Gagarin and Titov into space, and we can deliver a nuclear weapon to any point on the planet!"

This flight was an orbital test of the Mercury Tracking Network and the first successful orbital flight test of the Mercury program. (All previous successful launches were suborbital) The payload consisted of a pilot simulator (to test the environmental controls), two voice tapes (to check the tracking network), a life support system, three cameras, and instrumentation to monitor levels of noise, vibration and radiation. Because it was suspected that a transient voltage caused the malfunction of MA3's programmer (and that a similar problem had been responsible for Big Joe's failure to stage), Convair equipped the autopilot to give the engines a counteracting capability. Thus, testing this was also an objective of the flight. It demonstrated the ability of the Atlas LV-3B rocket to lift the Mercury capsule into orbit, of the capsule and its systems to operate completely autonomously, and succeeded in obtaining pictures of the Earth. It completed one orbit prior to returning to Earth. The capsule was recovered 176 miles east of Bermuda. One hour and 22 minutes after splashdown the destroyer USS Decatur (DD-936) (which was 34 miles from the landing point) picked up the capsule. On the MA4 mission, all flight objectives were successfully achieved.


See also

References

 This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.