Mars Climate Orbiter
Artist's conception of the Mars Climate Orbiter | |
Mission type | Mars orbiter |
---|---|
Operator | NASA / JPL |
COSPAR ID | 1998-073A |
Website | mars.jpl.nasa.gov/msp98/orbiter/ |
Mission duration |
286 days Mission failure |
Spacecraft properties | |
Manufacturer | Lockheed Martin |
Launch mass | 338 kilograms (745 lb) |
Power | 500 watts |
Start of mission | |
Launch date | 11 December 1998, 18:45:51 UTC |
Rocket | Delta II 7425 |
Launch site | Cape Canaveral SLC-17A |
End of mission | |
Last contact | 23 September 1999 09:06:00 UTC |
Decay date |
23 September 1999 Unintentionally deorbited |
Orbital parameters | |
Reference system | Areocentric |
Epoch | Planned |
The Mars Climate Orbiter (formerly the Mars Surveyor '98 Orbiter) was a 338 kilogram (750 lb) robotic space probe launched by NASA on December 11, 1998 to study the Martian climate, atmosphere, surface changes and to act as the communications relay in the Mars Surveyor '98 program, for Mars Polar Lander. However, on September 23, 1999, communication with the spacecraft was lost as the spacecraft went into orbital insertion, due to ground-based computer software which produced output in non-SI units of pound-seconds (lbf×s) instead of the metric units of newton-seconds (N×s) specified in the contract between NASA and Lockheed. The spacecraft encountered Mars on a trajectory that brought it too close to the planet, causing it to pass through the upper atmosphere and disintegrate.[1][2]
Mission background
History
After the loss of Mars Observer and the onset of the rising costs associated with the future International Space Station, NASA began seeking cheaper, smaller solutions to scientific interplanetary missions. In 1994, the Panel on Small Spacecraft Technology was established to set guidelines for future miniature spacecraft. The panel determined that the new line of miniature spacecraft should be under 1000 kilograms with highly focused instrumentation.[3] In 1995, a new Mars Surveyor program began as a set of missions designed with limited objectives, low costs, and frequent launches. The first mission in the new program was Mars Global Surveyor, launched in 1996 to map Mars and provide geologic data using instruments intended for Mars Observer.[4] Following Mars Global Surveyor, Mars Climate Orbiter carried two instruments, one originally intended for Mars Observer, to study the climate and weather of Mars.
The primary science objectives of the mission included:[5]
- determine the distribution of water on Mars
- monitor the daily weather and atmospheric conditions
- record changes on the martian surface due to wind and other atmospheric effects
- determine temperature profiles of the atmosphere
- monitor the water vapor and dust content of the atmosphere
- look for evidence of past climate change.
Spacecraft design
The Mars Climate Orbiter bus measured 2.1 meters tall, 1.6 meters wide and 2 meters deep. The internal structure was largely constructed with graphite composite/aluminum honeycomb supports, a design found in many commercial airplanes. With the exception of the scientific instruments, battery and main engine, the spacecraft included dual redundancy on the most important systems.[5][6]
The spacecraft was 3-axis stabilized and included eight, hydrazine monopropellant thrusters (four 22N thrusters to perform trajectory corrections; four 0.9N thrusters to control attitude). Orientation of the spacecraft was determined by a star tracker, two Sun sensors and two inertial measurement units. Orientation was controlled by firing the thrusters or using three reaction wheels. To perform the Mars orbital insertion maneuver, the spacecraft also included a LEROS 1B main engine rocket,[7] providing 640N of thrust by burning hydrazine fuel with nitrogen tetroxide (NTO) oxidizer.[5][6]
The spacecraft included a 1.3-meter high-gain antenna to transceive data with the Deep Space Network over the x-band. The radio transponder designed for the Cassini–Huygens mission was used as a cost-saving measure. It also included a two-way UHF radio frequency system to relay communications with Mars Polar Lander upon an expected landing on December 3, 1999.[5][6][8]
The space probe was powered with a 3-panel solar array, providing an average of 500 W at Mars. Deployed, the solar array measured 5.5 meters in length. Power was stored in 12-cell, 16-amp-hour Nickel hydrogen batteries. The batteries were intended to be recharged when the solar array received sunlight and power the spacecraft as it passed into the shadow of Mars. When entering into orbit around Mars, the solar array was to be utilized in the aerobraking maneuver, to slow the spacecraft until a circular orbit was achieved. The design was largely adapted from guidelines from the Small Spacecraft Technology Initiative outlined in the book, Technology for Small Spacecraft.[5][6][9]
In an effort to simplify previous implementations of computers on spacecraft, Mars Climate Orbiter featured a single computer using an IBM RAD6000 processor capable of 5MHz, 10MHz and 20MHz operations. Data storage was to be maintained on 128MB of random-access memory (RAM) and 18MB of flash memory. The flash memory was intended to be used for highly important data, including triplicate copies of the flight system software.[5]
The cost of the mission was $327.6 million total for the orbiter and lander, $193.1 million for spacecraft development, $91.7 million for launching it, and $42.8 million for mission operations.[10]
Scientific instruments
Pressure Modulated Infrared Radiometer (PMIRR) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Utilizes narrow-band radiometric channels and two pressure modulation cells to measure atmospheric and surface emissions in the thermal infrared and a visible channel to measure dust particles and condensates in the atmosphere and on the surface at varying longitudes and seasons.[12]
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mars Color Imager (MARCI) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
-see diagram |
The Mars Color Imager is a two-camera (medium-angle/wide-angle) imaging system designed to obtain pictures of the martian surface and atmosphere. Under proper conditions, resolutions up to 1 kilometer (0.6 miles) are possible.[13][14]
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Images of the spacecraft | |||||||||
---|---|---|---|---|---|---|---|---|---|
|
Mission profile
Date | Time (UTC) | Event |
---|---|---|
1998-12-11 | 18:45:51 | Spacecraft launched |
1999-09-23 | 08:41:00 | Insertion begins. Orbiter stows solar array. |
08:50:00 | Orbiter turns to correct orientation to begin main engine burn. | |
08:56:00 | Orbiter fires pyrotechnic devices which open valves to begin pressurizing the fuel and oxidizer tanks. | |
09:00:46 | Main engine burn starts; expected to fire for 16 minutes 23 seconds. | |
09:04:52 | Communication with spacecraft lost | |
09:06:00 | Orbiter expected to enter Mars occultation, out of radio contact with Earth.[n 1] | |
09:27:00 | Expected to exit Mars occultation.[n 1] | |
1999-09-25 | Mission declared a loss. No further attempts to contact. |
Launch and trajectory
The Mars Climate Orbiter probe was launched on December 11, 1998 at 18:45:51 UTC by the National Aeronautics and Space Administration from Space Launch Complex 17A at the Cape Canaveral Air Force Station in Florida, aboard a Delta II 7425 launch vehicle. The complete burn sequence lasted 42 minutes bringing the spacecraft into a Hohmann transfer orbit, with a final velocity of 5.5 km/s relative to Mars, and sending the probe into a 669 million kilometer trajectory.[5][8] At launch, Mars Climate Orbiter weighed 638 kilograms (1,418 pounds) including propellant.[15]
-
Exploded diagram of Delta II launch vehicle with Mars Climate Orbiter
-
Launch of Mars Climate Orbiter by NASA on a Delta II 7425 launch vehicle
-
Interplanetary trajectory of Mars Climate Orbiter
-
Aerobraking procedure to place Mars Climate Orbiter into orbit around Mars
Encounter with Mars
-
The only image acquired by Mars Climate Orbiter on September 7, 1999.
-
Diagram comparing the intended and actual trajectories of the Mars Climate Orbiter
Mars Climate Orbiter began the planned orbital insertion maneuver on September 23, 1999 at 09:00:46 UTC. Mars Climate Orbiter went out of radio contact when the spacecraft passed behind Mars at 09:04:52 UTC, 49 seconds earlier than expected, and communication was never reestablished. Due to complications arisen from human error, the spacecraft encountered Mars at a lower than anticipated altitude and disintegrated due to atmospheric stresses. Mars Reconnaissance Orbiter has since completed most of the intended objectives for this mission.
Cause of failure
On November 10, 1999, the Mars Climate Orbiter Mishap Investigation Board released a Phase I report, detailing the suspected issues encountered with the loss of the spacecraft. Previously, on September 8, 1999, Trajectory Correction Maneuver-4 was computed and then executed on September 15, 1999. It was intended to place the spacecraft at an optimal position for an orbital insertion maneuver that would bring the spacecraft around Mars at an altitude of 226 kilometers on September 23, 1999. However, during the week between TCM-4 and the orbital insertion maneuver, the navigation team indicated the altitude may be much lower than intended at 150 to 170 kilometers. Twenty-four hours prior to orbital insertion, calculations placed the orbiter at an altitude of 110 kilometers; 80 kilometers is the minimum altitude that Mars Climate Orbiter was thought to be capable of surviving during this maneuver. Post-failure calculations showed that the spacecraft was on a trajectory that would have taken the orbiter within 57 kilometers of the surface, where the spacecraft likely disintegrated because of atmospheric stresses.
The primary cause of this discrepancy was that one piece of ground software produced results in an Imperial unit, while a second system that used those results expected them to be in metric units. Software that calculated the total impulse produced by thruster firings calculated results in pound-seconds. The trajectory calculation used these results to correct the predicted position of the spacecraft for the effects of thruster firings. This software expected its inputs to be in Newton-seconds. [16]
The discrepancy between calculated and measured position, resulting in the discrepancy between desired and actual orbit insertion altitude, had been noticed earlier by at least two navigators, whose concerns were dismissed. A meeting of trajectory software engineers, trajectory software operators (navigators), propulsion engineers, and managers, was convened to consider the possibility of executing Trajectory Correction Maneuver-5, which was in the schedule. Attendees of the meeting recall an agreement to conduct TCM-5, but it was ultimately not done.
See also
- Metrication
- Space exploration
- Unmanned space mission
- Gimli Glider, an aircraft involved in an incident after poor metrication caused it to run out of fuel
Notes
References
- ↑ Stephenson, Arthur G.; LaPiana, Lia S.; Mulville, Daniel R.; Rutledge, Peter J.; Bauer, Frank H.; Folta, David; Dukeman, Greg A.; Sackheim, Robert; Norvig, Peter (November 10, 1999). "Mars Climate Orbiter Mishap Investigation Board Phase I Report". NASA.
- ↑ "Metric mishap caused loss of NASA orbiter". CNN. September 30, 1999. Retrieved January 10, 2011.
- ↑ Panel on Small Spacecraft Technology, National Research Council (1994). Technology for Small Spacecraft. Washington D.C.: National Academy Press. ISBN 0-309-05075-8. Retrieved January 13, 2011.
- ↑ Committee on Planetary and Lunar Exploration, Commission on Physical Sciences, Mathematics, and Applications, National Research Council (1995). The Role of Small Missions in Planetary and Lunar Exploration. Washington D.C.: National Academies Press. Retrieved January 13, 2011.
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 "Mars Climate Orbiter Arrival Press Kit" (Press release). NASA / JPL. September 1999. Retrieved January 13, 2011.
- ↑ 6.0 6.1 6.2 6.3 "Mars Climate Orbiter Flight System Description". NASA / JPL. 1998. Retrieved January 13, 2011.
- ↑ LEROS 1B
- ↑ 8.0 8.1 "1998 Mars Missions Press Kit" (Press release). NASA / JPL. December 1998. Retrieved January 13, 2011.
- ↑ Panel on Small Spacecraft Technology, National Research Council (1994). Technology for Small Spacecraft. Washington D.C.: National Academy Press. pp. 121–123. ISBN 0-309-05075-8. Retrieved January 13, 2011.
- ↑ "Mars Climate Orbiter Fact Sheet". NASA-JPL. Archived from the original on October 3, 2012.
- ↑ Albee, Arden L. (1988). Workshop on Mars Sample Return Science. Lunar and Planetary Inst. pp. 25–29. Retrieved March 20, 2011.
- ↑ "Pressure Modulated Infrared Radiometer (PMIRR)". NASA / National Space Science Data Center. Retrieved February 19, 2011.
- ↑ 13.0 13.1 13.2 Malin, M.C.; Bell (III), J.F.; Calvin, W.M.; Caplinger, M.A.; Clancy, R.T.; Harberle, R.M.; James, P.B.; Lee, S.W.; Ravine, M.A.; Thomas, P.; Wolff, M.J. (2001). "Mars Color Imager (MARCI) on the Mars Climate Orbiter". Journal of Geophysical Research 106 (E8): 17,651–17,672. Bibcode:2001JGR...10617651M. doi:10.1029/1999JE001145. Retrieved January 13, 2011.
- ↑ "Mars Color Imager (MARCI)". NASA / National Space Science Data Center. Retrieved February 19, 2011.
- ↑ "1998 MARS CLIMATE ORBITER ARRIVES AT NASA'S KENNEDY SPACE CENTER FOR FINAL LAUNCH PREPARATIONS" (Press release). NASA MEDIA RELATIONS OFFICE. September 14, 1998. Retrieved January 3, 2011.
- ↑ "Mars Climate Orbiter Mishap Investigation Board Phase I Report" (Press release). NASA. November 10, 1999. Retrieved February 22, 2013.
External links
Wikimedia Commons has media related to Mars Climate Orbiter. |
- Mars Surveyor '98 launch press kit
- Mars Climate Orbiter arrival at Mars press kit
- Mars Climate Orbiter Mission Profile by NASA's Solar System Exploration
- http://nssdc.gsfc.nasa.gov/nmc/spacecraftDisplay.do?id=1998-073A
|
|