Lauingen Energy Park
From Wikipedia, the free encyclopedia
Lauingen Energy Park | |
---|---|
Lauingen Energy Park | |
| |
Country | Germany |
Location | Lauingen |
Coordinates | 48°32′13″N 10°25′27″E / 48.53694°N 10.42417°ECoordinates: 48°32′13″N 10°25′27″E / 48.53694°N 10.42417°E |
Status | Operational |
Construction began | 2008[1] |
Commission date | June 2010[2] |
Developer(s) | Gehrlicher Solar |
Solar farm | |
Type | Flat-panel PV |
Photovoltaic modules |
306084 (288132 First Solar 17952 Yingli) |
Land area | 63 ha (155.7 acres) |
Power generation | |
Installed capacity | 25.7 MW |
Annual generation | 26.98 GWh[3] |
The Lauingen Energy Park is located in Bavarian Swabia, Germany, and covers an area of 63 hectares (155.7 acres).
The first phase of the project, Helmeringen 1, as 10 MW, was commissioned in 2009, the second, Helmeringen 2, as 9.4 MW, and the third, Helmeringen 3, as 6.3 MW, was begun in 2010.
See also
References
|
|
This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.