LB&SCR I2 class

From Wikipedia, the free encyclopedia
LB&SCR I2 & I4 classes

An I4 incorporating a superheated boiler
Specifications
Power type Steam
Designer D.E. Marsh
Builder Brighton Works
Build date 1907-1908
Total produced I2: 10; I4: 5
Configuration 4-4-2T
Gauge 4 ft 8 12 in (1,435 mm)
Leading wheel
diameter
3 ft 6 in (1.067 m)
Driver diameter 5 ft 6 in (1.676 m)
Trailing wheel
diameter
4 ft 0 in (1.219 m)
Locomotive weight 68.5 long tons (69.6 t) I2,
70.25 long tons (71.38 t) I4
Fuel type Coal
Water capacity 2,238 imp gal (10,170 l; 2,688 US gal)
Boiler pressure 170 psi (1.2 MPa)
Cylinders Two, inside
Cylinder size 17.5 in × 26 in (444 mm × 660 mm)
Tractive effort I2: 17,425 lbf (77.51 kN),
I4: 17,790 lbf (79.13 kN)
Career
Retired 1933-1940

The LB&SCR I2 class was a class of 4-4-2 steam tank locomotives designed by D. E. Marsh for suburban passenger service on the London, Brighton and South Coast Railway. The I4 class were of the same design but incorporated a superheated boiler.

History

In 1907, following the failure of his I1 class, Douglas Earle Marsh sought to remedy some of the faults with a new design of 4-4-2T with a longer wheelbase, larger boiler and detailed changes to the front end. In the original order, five of the locomotives would incorporate a superheated boiler, to be supplied by the North British Locomotive Company, and the remainder traditional saturated steam boilers from Brighton Works. In the event, the superheated boilers were delayed in construction and so all ten I2 locomotives had traditional boilers. When the superheated boilers eventually arrived they were used for five further locomotives of the same design, but which were classified I4.

Unfortunately the modifications in these designs did not address the fundamental problems with the I1 class, which was a firebox that was far too small. As a result the two classes had relatively short lives working lightly loaded secondary services, and the Stroudley D1 class, and Billinton D1 class, which they had been designed to replace, continued working.

Numbering

LB&SCR numbers were 11-20 and 31-35. The Southern Railway, which acquired the locomotives in 1923, initially numbered them B11-B20, B31-35 and later 2011-2020, 2031-2035.

Withdrawal

All the I2 were withdrawn between 1933 and 1939 but two locomotives, numbers 2013 and 2019, saw further service on the Longmoor Military Railway where they survived until at least 1947. At Longmoor, they were numbered 2400 and 2401 respectively. These numbers were later changed to 72400 and 72401. None of the class has been preserved. The I4 class were withdrawn between 1936 and 1940. No examples of either class have been preserved.

Locomotive Summary

Sources

  • Bradley, D.L. (1974). Locomotives of the London Brighton and South Coast Railway: Part 3. Railway Correspondence and Travel Society. 
  • Dendy Marshall. History of the Southern Railway. Ian Allan. ISBN 0-7110-0059-X.  Unknown parameter |C. F. year= ignored (help) page 271,

External links

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.