Lübeck Hauptbahnhof
Lübeck Hauptbahnhof | |
---|---|
Front entrance of the station building (2011) | |
Operations | |
Category | 2 [1] |
Type | Hbf |
Daily entry/exit | 31,000 |
DS100 code | AL |
Station code | 3807 |
Construction and location | |
Opened | 1 May 1908 |
Architect | Fritz Klingholz |
Location | Lübeck |
State | Schleswig-Holstein |
Country | Germany |
Home page | www.bahnhof.de |
53°52′02″N 10°40′09″E / 53.86722°N 10.66917°ECoordinates: 53°52′02″N 10°40′09″E / 53.86722°N 10.66917°E | |
Route information | |
| |
List of railway stations in Schleswig-Holstein |
Lübeck Hauptbahnhof (German for Lübeck main station) is the main railway station serving the Hanseatic city of Lübeck, in the German state of Schleswig-Holstein. It is a through station at the western edge of the city centre. With approximately 31,000 travelers and visitors each day, Lübeck Hbf is the busiest of all the railway stations in Schleswig-Holstein. It is classified by the Deutsche Bahn as a Category 3 station.
The present station building was built in 1908 by the Lübeck-Büchener Eisenbahn (LBE). At that time, the LBE operated most of the railway connections around Lübeck, including the express trains. The station building was designed by Fritz Klingholz, and replaced the previous, outdated building.
Lübeck Hbf is a Reiterbahnhof, or station with a reception building laid out as a bridge "riding" over the tracks. Its reception building spans a total of 10 tracks with four platforms. A special feature is its wide wooden steps leading down to the platforms. The station was recently modernised and completely electrified, and is now fully connected with Germany's electric railway network.
History
The old Hauptbahnhof
The forerunner of today's Hauptbahnhof was built by the LBE in 1851, on the wall peninsula near the Holstentor. Initially, it had only one platform, but due to later expansion work ended up with four platforms. With increasing traffic, operations became problematic, as the trains crossed a main road directly after leaving the station, and the tracks needed to pass over several small streams. Upon the commissioning of the new Hauptbahnhof in 1908, the old station building finally lost its function.
After being put to various other uses (including the housing of the Harbour Railway administration), the old station building was demolished in 1934, as part of the transformation of the Holstentorplatz.
The origins of today's Hauptbahnhof
As it was evident by the turn of the twentieth century that the old station building was too small, a new location was sought.
The problematic layout of the Lübeck inner city, which is situated on an island, had already caused great difficulties for the construction and operation of the original station. Thus, the new station site needed to be just outside the inner city to be able to solve these problems.
A suitable location was finally found in the Rethteich Meadows, a few hundred metres east of the inner city, near the St. Lawrence Church. The new station, built to a design by Fritz Klingholz, was finally opened in 1908, and the tracks slewed to the new location.
During World War II, the main building and the train shed remained largely intact. However, in the bombing of 29 March 1942 there were some hits to the passenger bridge, which partially burned out, and the station wing, which was rebuilt in simplified form.
The Bundesbahn era
From 1945 to 1990, Lübeck Hbf was a border station adjacent to what was, initially, the Soviet occupation zone, and later the German Democratic Republic. The Bundesgrenzschutz had its own border inspection facilities on the easternmost platform, and this had to be passed by passengers departing from Lübeck. The Interzonal trains operated about once or twice daily to Rostock. They came usually from Hamburg or Cologne.
From 14 May 1963 onwards, Lübeck Hbf's most significant attribute was that it had become an important station on the Vogelfluglinie from Hamburg to Scandinavia. Numerous Express trains with long itineraries served the station. Among them were the Italia Express and the Alpen Express, which operated between Rome and Copenhagen, and the TEE Merkur, which ran from Stuttgart to Copenhagen.
The branch line to Segeberg, which had its platform next to the train hall, had its passenger traffic withdrawn on 26 September 1964, and was closed on 31 December 1967.
In 1967, on the occasion of the visit of Shah Reza Pahlavi to the city of Lübeck, the station was restored. The modifications then carried out corresponded with the spirit of the times but were later perceived as being of dubious aesthetic value. They were removed during the 2003 renovations. Amongst other things, the passage to the station wing was closed, windows bricked up and the interior of the train hall strengthened. Also installed during the Bundesbahn era was the metal luggage bridge, which obstructed the view of the station from the railway bridge.
Developments after the Wende
After the opening of the combined road/rail Great Belt Bridge in Denmark in the late 1990s, Lübeck Hbf became a less important station for international traffic, as the new bridge made the longer route via Flensburg more attractive. At the same time, there was an increasingly substantial decline of the station due to the reluctance of Deutsche Bahn to invest in Lübeck. Thus, the Lübeck Hbf of the late 1990s was still equipped with hand operated semaphore signals, lack of care for the station building had become apparent, and Lübeck had become the largest German city not served by an electrified railway line. Additionally, the station wing looked down at heel, after its restaurant had had to close. By 2000, the entire building was completely outdated and no longer met the requirements of modern rail operations.
The turnaround in the policy of the Deutsche Bahn for the Lübeck area came in 2003. In that year, all the semaphore signals were replaced with centralized Ks- Signals. At the same time, work began on a large-scale reconstruction of the station, to modernize and prepare it for future electrification. The most important modifications were completed on 20 July 2007.
Electrification of the Lübeck–Hamburg and Lübeck–Lübeck-Travemünde Strand railways, and therefore also of Lübeck Hbf, was begun in late 2006 and finished in December 2008. On 1 October 2008, the power was turned on.
The reconstruction work
In 2003, after much hesitation, the Deutsche Bahn initiated a comprehensive modernisation of Lübeck Hbf. In carrying out the modernisation, the DB was required to observe rules of heritage building preservation. The work involved the complete reconstruction of the reception building and train hall, and the basic restoration of the pedestrian bridge.
In addition to general upgrades, the construction work was as follows:
- Demolition and reconstruction of all four platforms.
- Dismantling of the train hall and subsequent reconstruction. In the process, about 70 percent of the old steel beams were reused. The train hall roof was fitted with stronger glazing, and the overall structure was stabilised by new steel double arches. At the same time, steel structural units, described as arches and depicted in the photo at right, were also installed. They are necessary for structural reasons, because there is a transit line between two of the platform tracks. At that point, the roof weights could not be forwarded directly into the ground but are diverted via the arches. This transit line is not needed at the moment and remains non electrified to this day. It is used exclusively for the stabling of railcars.
- Installation of a modern light and speaker system
- Demolition of the pedestrian bridge and subsequent renewal with the greatest possible reuse of the original steel components. In the process, the beam was raised by 60 centimetres (24 in), to facilitate the electrification of the station.
- Reglazing of windows on the hall side of the pedestrian bridge that had been bricked up in the 1960s.
- Construction of a second staircase to each platform.
- Installation of a lift on each platform for a maximum of 20 persons.
- Refurbishment of the reception building.
- Demolition of the redundant post office bridge.
- Fitting of digital destination displays to all platforms.
- Installation of a double-sided train departure board in the lobby.
- Construction of the new travel center in the north wing (carried out only in 2009).
Most work was completed by 20 July 2007. The official inauguration took place on 13 December 2008, to commemorate the station's centenary. Seven businesses moved into premises on the pedestrian bridge, including a fast food restaurant, a bookshop and a pretzel baker. The old luggage bridge was removed in April 2008. With the relocation of the travel center to the north wing of the building - establishing a passage to the main hall - construction was practically completed. In the south wing, which already had a connection with the main hall, is intended in future to host further businesses.
A further construction project, not yet completed by 2009, is the conversion of the ground floor of the north station wing, which has been empty for some years, because of the closure of the restaurant, and later the nightclub, formerly located in that wing. The basement is now occupied by the travel centre.
In the immediate vicinity of the Hauptbahnhof, adjacent to the station forecourt, is the Handelshof, an expressionistic former office building, the renovation of which was completed in 2009.
Electrification
For a long time, Lübeck was the largest German city without an electrified rail connection. From the 1970s, the city sought to be connected to the electric rail network. However, the initial response was that Lübeck was located in the zone boundary area, right on the border with East Germany, and later the Deutsche Bahn had a policy against it.
This policy stance finally ended in 2005, when a contract for electrification was officially signed. In it, the electrification of the Hamburg-Lübeck-Travemünde railway was agreed.
Apart from its assistance to passenger traffic, the integration of Lübeck into the electric rail network was particularly beneficial to the ever-increasing freight traffic between the Lübeck ports and Hamburg. The electrification contract included duplication of the section of line between Bad Schwartau Waldhalle and Lübeck-Kücknitz. As a source of electricity for the newly electrified line, a new substation was constructed in Lübeck-Genin, instead of the railway power lines that would otherwise have been required to connect the line with existing substations.
The new electrified line was energised on 1 October 2008, and officially commissioned on schedule on 14 December 2008.
Traffic
At one stage, six railway lines radiated from Lübeck Hbf. Of those six lines, only the Lübeck-Segeberger Eisenbahn (LSE), opened in 1916 to Bad Segeberg, has been closed. That closure, as far as passenger traffic is concerned, took place in 1964.
The following railways lead to Lübeck Hbf:
- Hamburg–Bad Oldesloe–Reinfeld–Lübeck (Lübeck–Hamburg railway); opened in 1865 by the Lübeck-Büchener Eisenbahn (LBE), now part of Kursbuchstrecken (KBS) 104 and 140.
- Lüneburg–Büchen–Lübeck (Lübeck–Lüneburg railway); opened in 1851 by the LBE, today KBS 145.
- Bad Kleinen–Lübeck (Lübeck-Bad Kleinen railway); opened in 1870 by the Grand Duchy of Mecklenburg Friedrich-Franz Railway (MFFE), today KBS 150.
- Lübeck-Travemünde-Strand–Lübeck (Lübeck–Lübeck-Travemünde Strand railway); opened in 1882 by the LBE, today part of KBS 140.
- Puttgarden–Lübeck and Neustadt–Lübeck (Vogelfluglinie); opened in 1925 by the Deutsche Reichsbahn (DRG), today KBS 141.
- Kiel–Eutin–Bad Schwartau–Lübeck (Kiel–Lübeck railway), opened in 1873 by the Eutin-Lübecker Eisenbahn-Gesellschaft (ELE), today part of KBS 140.
Currently, there are international connections between Lübeck Hbf and Copenhagen using Intercity-Express- and Eurocity trains over the Vogelfluglinie, and to Szczecin in Poland via Bad Kleinen, Neubrandenburg und Pasewalk, operated by Regional-Express (RE) trains. Thanks to their long itineraries, these RE trains have the character of Heckeneilzug services. Additionally, Lübeck is an Intercity station. Once daily, an Intercity train to Puttgarden stops at Lübeck, and later in the day the return service to Frankfurt am Main also stops there.
Some of the long distance travellers at Lübeck Hbf take a train to Lübeck-Travemünde Skandinavienkai, to connect with one of the ferries to Sweden or Finland.
The majority of the passenger train traffic to and from Lübeck Hbf is carried by commuter trains on the line between Hamburg Hauptbahnhof and Lübeck, operated by DB Regio. During peak hours, trains on this line are timetabled at 30 minute intervals. On all other lines that operate to Lübeck Hauptbahnhof, trains generally operate at hourly intervals.
Since 9 December 2007, the Danish IC3 multiple units used to operate Eurocity trains through Lübeck Hbf have been partially replaced by diesel powered ICE TD trains, which have transformed the Lübeck Hbf of today into an ICE station.
Since the December 2008 timetable change, Lübeck has had its first ever direct ICE connection via Hannover with Munich.
Long distance traffic
Line | Train route | Schedule |
---|---|---|
ICE 25 | (Lübeck Hbf –) Hamburg Hbf – Hannover Hbf – Göttingen – Kassel-Wilhelmshöhe – Fulda – Nürnberg Hbf – Ingolstadt Hbf – München Hbf (– Garmisch-Partenkirchen) | One train pair |
ICE 75 | Berlin Ostbf – Hamburg Hbf – Lübeck Hbf – Puttgarden – Copenhagen Central | Individual trains |
EC 75 | Hamburg – Lübeck – Puttgarden – Copenhagen | Individual train pairs |
Overall, there is an EC or ICE train linking Hamburg with Copenhagen approximately every two hours, except during a gap in the morning.
Regional traffic
Line | Train route | KBS |
---|---|---|
RE RB | Kiel–Preetz–Lübeck Hauptbahnhof–Lüneburg | 145 |
RE RB | Lübeck Hauptbahnhof–Bad Oldesloe–Hamburg Hauptbahnhof | 104,140 |
RE RB | Lübeck Hauptbahnhof–Oldenburg (Holst)–Puttgarden | 140 |
RE RB | Lübeck Hauptbahnhof–Lübeck-Travemünde Strand | 104 |
RE 6 | Lübeck Hauptbahnhof–Bad Kleinen–Neubrandenburg–Szczecin | 175 |
Preceding station | Deutsche Bahn | Following station | ||
---|---|---|---|---|
Terminus | RE 6 | Lübeck-St. Jürgen toward Szczecin Główny |
Bus connections
Near the station, and accessible via a recently widened passageway through a row of houses, is Lübeck's central bus station (ZOB), with services operated by Stadtverkehr Lübeck, Autokraft and Dahmetal.
Notes
- ↑ "Stationspreisliste 2014" [Station price list 2014] (PDF) (in German). DB Station&Service. 24 October 2013. Retrieved 1 January 2014.
External links
- Deutsche Bahn AG: renovation of Lübeck Hbf (German)
- Images of the almost completed construction work as at the end of March 2008
- Images of Lübeck Hbf also showing the completed electrification works
- Hauptbahnhof 360° City Panorama
- Gössler Kinz Kreienbaum Architekten BDA, basic renovation of Lübeck Hbf, planning from 2001, conversion 2003-2007 (German)
- Track plan of Lübeck Hbf on the Deutsche Bahn website (PDF; 158,3 KB)
Wikimedia Commons has media related to Hauptbahnhof Lübeck. |