Interstate 805

From Wikipedia, the free encyclopedia

Interstate 805 marker

Interstate 805
Jacob Dekema Freeway

I-805 highlighted in red
Route information
Auxiliary route of I-5
Defined by S&HC § 621
Maintained by Caltrans
Length: 28.016 mi[1] (45.087 km)
Existed: 1959[2] – present
Major junctions
South end: I-5 in San Ysidro
 
North end: I-5 near Del Mar
Location
Counties: San Diego
Highway system
I-780 I-880

Interstate 805 (I-805) is a major north–south Interstate Highway in Southern California. It is a bypass of I-5, running along the eastern areas of the Greater San Diego region from San Ysidro (part of the city of San Diego) near the Mexico–U.S. border to near Del Mar. The southern terminus of I-805 at I-5 in San Ysidro is less than a mile north of the Mexican border. I-805 then traverses through the cities of Chula Vista and National City before reentering San Diego. The freeway passes though the San Diego neighborhoods of North Park, Mission Valley, Clairemont, and University City before terminating at I-5 in the Sorrento Valley neighborhood near the Del Mar city limit.

Planning for I-805 began in 1956, and the route was officially designated in 1959 before it was renumbered in the 1964 state highway renumbering. Starting in 1967, the freeway was built in phases, with the northern part of the freeway finished before the southern part. I-805 was completed and open to traffic in 1975. Named the Jacob Dekema Freeway after the longtime head of the regional division of the California Department of Transportation (Caltrans), I-805 has been frequently cited for its complex engineering and architecture, including near I-8 on the Mission Valley Viaduct. Since then, several construction projects have taken place, including the construction of local and express lanes at the northern interchange with I-5. High-occupancy toll lanes are under construction on both the northern and southern portions of the route.

Route description

I-805 northbound at SR 905

The route begins at I-5 near the Mexican border in a far south part of San Ysidro, a neighborhood of San Diego. As it starts its journey northward, it quickly junctions with State Route 905 (SR 905) before exiting the city of San Diego and entering Chula Vista.[3] According to the San Diego Union-Tribune, within the past 20 years the freeway has delineated the apparent divide between rich and poor in the city of Chula Vista; those on the eastern side of the freeway have been more affluent and have better schools compared to those on the western side.[4] Just outside the city, I-805 meets County Route S17 (CR S17), also named Bonita Road, before coming to an interchange with SR 54. The freeway then enters National City, where it intersects Sweetwater Road and Plaza Boulevard, before leaving the city and reentering the city of San Diego.[3]

I-805 continues northward through San Diego proper, where it intersects SR 94, the Martin Luther King Jr. Freeway. As the freeway continues through downtown San Diego, it meets SR 15, the continuation of I-15. It then intersects El Cajon Boulevard before passing under the Hazard Memorial Bridge that carries Adams Avenue.[3] The bridge was named after Roscoe Hazard for his involvement in the construction of several roads and highways in Southern California. I-805 then travels on the Mission Valley Viaduct, a towering reinforced concrete viaduct built in 1972, spanning over Mission Valley and the San Diego River.[5] The viaduct is the top stack of the Jack Schrade Interchange over I-8, which runs along the south side of Mission Valley and crosses underneath the viaduct perpendicularly, and is San Diego County's only symmetrical stack interchange. The San Diego Trolley traffic also runs under the viaduct on the valley floor.[3]

The beginning of I-805 south at I-5 during the evening rush hour

After intersecting SR 163, also known as the Cabrillo Freeway, I-805 continues through suburban San Diego, where it meets SR 52 in Clairemont Mesa. North of SR 52, it closely parallels I-5 near La Jolla, heading northwest. Passing under the Eastgate Mall arch bridge and entering Sorrento Valley, it finally meets its north end at I-5.[3] During the widening project which was completed in 2007, I-5 at the I-805 merge was built to be 21 lanes wide.[6] Eastbound SR 56 and Carmel Mountain Road are accessible via a parallel carriageway for local traffic heading northbound from I-805; traffic from SR 56 westbound can merge onto I-805 from the local bypass.[3]

The route is officially known as the Jacob Dekema Freeway after Jacob Dekema, a pioneering force from California Department of Transportation (Caltrans) who helped shape the San Diego freeway system.[5] It is also part of the California Freeway and Expressway System[7] and the National Highway System,[8] a network of roads that are important to the country's economy, defense, and mobility.[9] In 2012, I-805 had an annual average daily traffic (AADT) of 47,500 at the southern terminus, and 225,000 between Imperial Avenue and Market Street, the latter of which was the highest AADT for the highway.[10]

History

Construction

According to Dekema, planning for I-805 began in 1956.[11] The original routing for I-805 was approved as an Interstate Highway in July 1958.[12] It was added to the state highway system and the Freeway and Expressway System in 1959 as Route 241.[2] I-805 was expected to reduce traffic on what was then US 101 between Los Angeles and San Diego, when the former was opened.[13] Route 241 was renumbered to Route 805 in the 1964 state highway renumbering, and I-5 was designated along the route from Los Angeles to San Diego.[14] Further planning was underway in 1965, with the goal to have the route built by 1972, the federal highway funding deadline.[15] This was to be the first freeway in the area with no prior road along its route that it would replace; the goal was to provide a bypass around San Diego for those traveling to Mexico, and improve access for local residents. By June, houses along the route in the North Park area were being sold, as the land was needed for the first stretch of the freeway to be constructed.[16] The next year, Dekema confirmed that the first portion of what was known as the Inland Freeway to be built would be between Home and Adams avenues.[17]

In May 1967, bidding began, after construction had been delayed by that of the I-5 and I-8 freeways, both of which had been given higher priority. This first portion would run from Wabash Boulevard to around Madison Avenue (a distance of 3.5 miles or 5.6 kilometres), and the next portion would include the I-8 interchange.[18] The R.E. Hazard and W.F. Maxwell Companies won the low bid of $11.7 million (about $135 million in 2011 dollars)[ 1] in mid-1967.[19] The groundbreaking ceremony happened on September 25 at El Cajon Boulevard and Boundary Street.[11] In August 1968, the portion of I-805 from just south of I-8 to north of Friars Road, including the interchange with I-8, was put up for bidding; at a budgeted $27.5 million (about $293 million in 2011 dollars),[ 1] it was the most expensive job that the Division of Highways had ever put up for bid.[20] The winning bid was $20.9 million (about $281 million in 2011 dollars),[ 1] and was awarded to R.E. Hazard Contracting Company and W.F. Maxwell Company.[21]

Construction had begun on the viaduct by May 1969;[22] in the meantime, National City was making plans for developing the freeway corridor with motels and restaurants, as well as a shopping center.[23] In mid-1969, bidding was to begin on 3.2 miles (5.1 km) of I-805 from north of Friars Road to north of what was then US 395,[24] which would become SR 163.[25] Construction from J Street south to near San Ysidro was underway by September, when there were concerns that an order from President Richard Nixon to reduce federal construction projects by 75 percent might affect funding for the portion north of Friars Road. However, Governor Ronald Reagan lifted the associated freeze in construction at the state level a few weeks later.[26][27] A month later, the contract for the portion between Friars Road and US 395 had been awarded for $15 million (about $149 million in 2011 dollars);[ 1] the portions between there and north of Miramar Road were in the planning phases, while construction continued south of I-8 to Wabash Boulevard.[28] The 2.4-mile (3.9 km) portion from SR 52 to Miramar Road had been contracted out to O.G. Sansome Company for $5.6 million (about $55.7 million in 2011 dollars)[ 1] by the end of 1969.[29] Meanwhile, $4 million (about $39.8 million in 2011 dollars)[ 1] of state funding was spent in 1969 to find housing for those who were to be displaced by the freeway in San Ysidro.[30]

By March 1970, the original section between Home Avenue and near I-8 was almost finished. The Mission Valley portion extending north of US 395, as well as from Otay Valley Road and J Street in Chula Vista, were still under construction.[31] The portion immediately north of US 395 was contracted to A.A. Baxter Corporation, E.C. Young, and Young and Sons, Inc. for $7.9 million[32] (about $75.4 million in 2011 dollars).[ 1] On July 6, the first section to begin construction was dedicated, and was to be opened from El Cajon Boulevard to Wabash Boulevard soon thereafter; the rest of the section would not open until the Mission Valley interchange with I-8 was finished.[33]

A second border crossing in the San Ysidro area was proposed near the Playas de Tijuana area, that would be accessible from I-805, although another alternative was considered near Brown Field.[34] A formal study on the matter was commissioned in August.[35] However, this would have added $10 million (about $95.4 million in 2011 dollars)[ 1] to the cost of the freeway, and possibly delay it by up to 10 years; furthermore, most traffic crossing the border was found to head to Tijuana and not Ensenada.[36] Following this, the city of Chula Vista asked that the state proceed with the original plans to construct the freeway, even though it would pass through a San Ysidro neighborhood.[37]

In September 1970, bidding began for the final portion of the northern half of I-805 between Miramar Road and I-5;[38] a month later, the segments between Home Avenue and SR 94, and SR 54 to 12th Street had funding allocated.[39] By the end of the year, Hazard, Maxwell, and Matich had submitted the low bid of around $7.2 million (about $68.7 million in 2011 dollars)[ 1] for the northernmost portion.[40] The Chula Vista portion of the freeway from Main Street to L Street was completed in February 1971; by then, the estimated date for completing the entire freeway had slipped to 1975 from 1972.[41] By March, the projected completion date for the Mission Valley bridge was revised to July 1972.[42] A 102-home mobile home park was approved by the City Council a few weeks later to house those who were displaced by the freeway construction.[43]

The portion of the freeway from Otay Valley Road to Telegraph Canyon Road opened during 1972.[44] On October 22, several unconstructed portions of I-805 were partially funded, including from Chula Vista south past SR 75, north of the completed Chula Vista portion to SR 54, from SR 54 to Plaza Boulevard in National City, from there to SR 94 (including the interchange with SR 252), and from there to Home Avenue.[45] Before the end of the year, the portion from SR 94 to Home Avenue entered the bidding phase;[46] Guy F. Atkinson Company won the contract for roughly $9.96 million (about $81.6 million in 2011 dollars)[ 1] in early 1972.[47] Following a request from the El Cajon City Council,[48] March 19 was set aside as a Community Cycle Day for bicyclists to travel the newly finished freeway from El Cajon Boulevard to SR 52, just before the freeway was to be dedicated the next day;[49] the entire Mission Valley Viaduct was open to traffic that month.[44]

By the beginning of 1974, I-805 was open north of Home Avenue, and from Otay Valley Road to Telegraph Canyon Road in Chula Vista;[44] five segments remaining were under construction, and the last segment was funded.[50] The Imperial Avenue section of I-805 remained in the budget, despite revisions in response to the 1973 oil crisis.[51] In late January, I-805 between SR 15 and SR 94 was opened to traffic, though not all of the ramps at the SR 94 interchange were operational.[52] The connectors to SR 94 east were completed in March.[53] The entire portion between SR 94 and Home Avenue cost $10.5 million[44] (about $72.4 million in 2011 dollars).[ 1] Construction between SR 94 and Imperial Avenue was well under way by December, at a cost of $8.5 million[54] (about $58.6 million in 2011 dollars).[ 1]

As the scheduled completion of the freeway neared, Mayor Tom Hamilton of Chula Vista expressed concerns regarding the predicted development of the I-805 corridor, and the decisions that the City Council would need to make regarding such plans.[55] The portion south of Otay Valley Road cost $15 million (about $95.6 million in 2011 dollars)[ 1], and the portion between Telegraph Canyon Road and Sweetwater Road cost $12 million (about $76.5 million in 2011 dollars).[ 1] The portion from there to Imperial Avenue was projected to cost $10.2 million[44] (about $65 million in 2011 dollars).[ 1] The dedication of the freeway took place on July 23, 1975, even though the freeway was not entirely finished, due to the desire to hold the ceremony during the summer.[56] I-805 from Plaza Boulevard to Telegraph Canyon Road opened to traffic on July 28, leaving the freeway complete except for the portion between Plaza Boulevard and SR 94. While portions of the freeway were nearly ready for traffic, there were reports of motorists driving on the closed freeway, which the California Highway Patrol warned was illegal.[57] On September 3, Dekema announced that the entirety of the freeway would open the next day as he made a final inspection of the unopened portion; the total cost of the construction was $145 million (about $924 million in 2011 dollars).[ 1] However, Dekema announced that there was no more state funding available to construct further roads for the short-term.[58]

Recognition, artwork, and architecture

The Miramar Road overpass on I-805 northbound, with the Eastgate Mall bridge in the background

The Mission Valley Viaduct was recognized by the American Society of Civil Engineers (ASCE) as the "Outstanding Civil Engineering Project for 1973 in the San Diego Area"; it was designed to match the close-by Mission San Diego de Alcalá with its columns that look similar to cathedral windows,[59] and arch-like shapes etched into the textured concrete. The viaduct was designed to span 3,900 feet (1,200 m), and use squared-off support columns instead of traditional cylindrical supports. Octagonal columns were to be used on the ramps and the ends of the bridge.[60] Over 600 tons of steel bars were to be used,[61] and the bridge was constructed as high as 98 feet (30 m) above I-8.[62] The Adams Avenue Bridge over I-805 was also recognized for its 439 feet (134 m) span and two tapered supports on the ends of the bridge; in 1968, a Princeton University engineering professor asked for a copy of the design from Caltrans for educational purposes.[59] The construction supervisor, in fact, compared the construction of this bridge to building a boat, and it was constructed from the middle outward rather than the conventional method of building from the ends inward. The span was designed to be 268 feet (82 m) long,[63] and 100 feet (30 m) high.[64]

Awards for the Eastgate Mall (or Old Miramar Bridge) came from the Federal Highway Administration, San Diego Highway Development Association, and Prestressed Concrete Institute Awards Program; at the time, it was one of the first arch bridges in the state, and did not use traditional concrete pillars.[59] The San Diego Union (predecessor to the Union-Tribune) published a few freelance articles in 1984 about I-805, complimenting the four-level interchange with I-8 and the arch bridge at Eastgate Mall, while mentioning that subsequent inflation after their completion would have made such structures more difficult to build if they had been constructed later. Other artwork and architecture that was mentioned included the Wateridge development in Sorrento Valley, and the "Stargazer" building by Alexander Liberman that was lit with florescent colors at night.[65][66]

However, not all forms of artwork along the highway were uncontroversial. In 1977, there were several complaints regarding new billboards that were installed at the northern terminus of the highway, since they blocked the view of the coast.[67] In 1981, an illegal mural that was determined to be incomplete was discovered at the I-8 interchange; while Caltrans discouraged the painting of such murals, they were impressed with the portion that had already been completed.[68] Art Cole, the artist, stepped forward to the department, and was allowed to finish the mural of a desert highland sunrise; following this, Caltrans made efforts to have other murals commissioned.[69]

The San Ysidro Chamber of Commerce attempted to have I-805 named as the San Ysidro Freeway in 1976.[70] However, I-805 was named after Jacob Dekema in August 1981, and ceremonies to mark the occasion occurred in February 1982.[71] The plaque honoring Dekema was installed in November at the Governor Drive interchange.[72] Because of his efforts in designing I-805, Ed Settle of Caltrans was given the Outstanding Civil Engineering Award from the ASCE; he designed several other regional freeways, including SR 163 through Balboa Park and I-5 through San Diego.[73]

Expansion

The construction of a "dual freeway" at the northern end of I-805 was discussed as early as 1989, referring to the two carriageways needed for each direction of the freeway, resulting in four total. It would require drivers to use the new local lanes to access eastbound SR 56 from I-5 or I-805. The project would allow for trucks to use the new lanes to assist in merging with traffic. However, it faced opposition from local residents, concerned about the loss of the view from their homes, as well as environmentalists concerned about nearby wetlands.[74] Further objections espoused the view that the congestion would continue to increase, regardless of what was done, and that the new road would be at capacity in a few years.[75] The San Diego Association of Governments (SANDAG) funded the construction with $110 million (about $151 million in 2011 dollars)[ 1] in mid-2000.[76]

Construction of the "dual freeway" began in early 2002, at a cost of $182 million[77] (about $238 million in 2011 dollars).[ 1] The northbound lanes were scheduled to open in February 2006.[78] The southbound lanes were completed in early 2007.[6] That year, a three-year project began to allow robot controlled vehicles, including buses and trucks, to use a special lane. The intention is to allow the vehicles to travel at shorter following distances and thereby allow more vehicles to use the lanes. The vehicles will still have drivers since they need to enter and exit the special lanes. The system was designed by Swoop Technology, based in San Diego County.[79]

Two years later, construction began on two auxiliary lanes on I-805 southbound from SR 54 to Bonita Road, to improve traffic flow at the SR 54 interchange.[80] In 2010, Caltrans proposed adding high-occupancy toll express lanes between SR 15 and East Palomar Street in Chula Vista.[81] The California Transportation Commission (CTC) awarded $100 million for the work in June 2011, which would be split into two phases at the interchange with SR 54.[82] Work is also underway to add two HOV lanes between SR 52 and Mira Mesa Boulevard; this project also received $59.5 million from the CTC in September 2011.[83] Meanwhile, SANDAG made arrangements to purchase the SR 125 toll road and reduce the tolls, which was hoped to encourage commuters to take that road instead of I-805 and reduce congestion; this would then enable Caltrans to construct two managed lanes instead of the original four.[84]

In February 2013, construction began on the northern HOV lanes; the project is expected to cost $86 million.[85] By May, construction on the Palomar Street direct access ramps had begun, and the Carroll Canyon Road ramps were almost finished.[86] The southern express lanes project is projected to cost $1.4 billion.[87] The northern project is expected to be complete in 2015,[88] and the southern express lanes are expected to be open to traffic in 2014, with an option to expand them into two lanes in each direction.[89]

Exit list

Except where prefixed with a letter, postmiles were measured on the road as it was in 1964, and do not necessarily reflect current mileage. R reflects a realignment in the route since then.[1] The entire route is in San Diego County.

LocationPostmile
[1][10][90]
Exit
[91]
DestinationsNotes
San Diego0.49 I-5 south (San Diego Freeway)Southbound exit and northbound entrance
 Camino de la PlazaSouthbound exit and northbound entrance; last US exit
0.651ASan Ysidro Boulevard
1.811B SR 905Future I-905
2.902Palm Avenue
Chula Vista3.653Main Street, Auto Park Drive
4.424Olympic Parkway, East Orange Avenue
6.066L Street, Telegraph Canyon Road
7.167H StreetSigned as exits 7A (east) and 7B (west) southbound
 7.767C CR S17 (E Street)Northbound exit is part of exit 7
 8.858 SR 54 Spring Valley, San Diego County, San DiegoSigned as exit 9 southbound
National City9.059Sweetwater RoadSigned as exit 8 southbound
10.2810Plaza Boulevard
San Diego11.3111A43rd StreetSigned as exit 11B southbound; former SR 252
R11.3611B47th Street, Palm Avenue National CitySigned as exit 11A southbound
12.3412AImperial Avenue
12.9512BMarket Street
13.5113A SR 94 (M. L. King Jr. Freeway)Southbound access to SR 94 west is through exit 14
13.9513BHome Avenue
14.6414 SR 15 north (Escondido Freeway)Northbound exit and southbound entrance, future I-15 north
14.6414 SR 15 south (Escondido Freeway) to SR 94 westSouthbound exit and northbound entrance, future I-15 south
15.9515North Park Way, University Avenue
16.4316El Cajon BoulevardFormer US 80
16.9917AAdams Avenue, Madison AvenueSouthbound exit and northbound entrance
17.6517B I-8 – San Diego, El CentroSigned as exit 17 northbound
18.8918Murray Ridge Road, Phyllis Place
20.2320AMesa College Drive, Kearny Villa RoadNorthbound exit and southbound entrance
20.6020B SR 163 north (Cabrillo Freeway) EscondidoNorthbound exit and southbound entrance
20.6020 SR 163 south (Cabrillo Freeway) – Downtown San DiegoSouthbound exit and northbound entrance
21.6521Balboa AvenueFormer SR 274
22.5622Clairemont Mesa Boulevard
23.6523 SR 52 – San Diego, Santee
24.4424Governor Drive
25.4825ANobel DriveNorthbound exit and southbound entrance
25.9425BLa Jolla Village Drive, Miramar Road
27.0727Mira Mesa Boulevard, Vista Sorrento Parkway, Sorrento Valley RoadSigned as exits 27A (Mira Mesa Boulevard, Vista Sorrento Parkway) and 27B (Sorrento Valley Road) northbound
  SR 56 eastNorthbound exit and southbound entrance; exit is accessible via local bypass
28.50 I-5 north (San Diego Freeway) – Los AngelesNorthbound exit and southbound entrance
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Incomplete access

References

  1. 1.0 1.1 1.2 Staff. "State Truck Route List" (XLS file). California Department of Transportation. Retrieved August 21, 2012. 
  2. 2.0 2.1 California State Legislature (1959). "An act to amend...the Streets and Highways Code, relating to state highways, providing for a California Freeway and Expressway System...". State of California. 1959 chapter 1062. 
  3. 3.0 3.1 3.2 3.3 3.4 3.5 Google Inc. "I-805". Google Maps (Map). Cartography by Google, Inc. https://maps.google.com/?ll=32.775729,-117.03186&spn=0.587715,1.215363&t=m&z=10. Retrieved September 14, 2013.
  4. Moran, Chris (February 7, 2004). "A City Divided—by Interstate 805—Chula Vista, and Its Schools, Face Serious Threat of East Versus West". San Diego Union-Tribune. p. B1. OCLC 25257675. 
  5. 5.0 5.1 "2008 Named Freeways, Highways, Structures and Other Appurtenances In California". State of California Business, Transportation and Housing Agency, Department of Transportation (CalTrans). January 2008. pp. 70, 85, 172. Retrieved September 13, 2013. 
  6. 6.0 6.1 Schmidt, Steve (March 28, 2007). "Four New Southbound Lanes at I-5/805 Merge Set to Open". San Diego Union-Tribune. p. NC1. OCLC 25257675. Retrieved September 13, 2013. 
  7. California State Legislature. "Streets and Highways Code Section 250–257". California State Legislature. Retrieved April 8, 2011. 
  8. Federal Highway Administration (PDF). San Diego (Map). Scale not given. Cartography by FHWA. http://www.fhwa.dot.gov/planning/national_highway_system/nhs_maps/southern_california/sandiego_ca.pdf. Retrieved August 9, 2012.
  9. Natzke, Stefan; Neathery, Mike; Adderly, Kevin (June 26, 2013). / "What is the National Highway System?". National Highway System. Federal Highway Administration. Retrieved December 1, 2013. 
  10. 10.0 10.1 "All Traffic Volumes on CSHS". California Department of Transportation. 2012. Retrieved December 10, 2013. 
  11. 11.0 11.1 "Ceremonies Open Work on Interstate 805". The San Diego Union. September 26, 1967. p. C1. OCLC 13155544. 
  12. State Highway Routes: Selected Information. California Department of Transportation. 1995. p. 350. 
  13. "U.S. 101 Ranked Among Deadliest". The San Diego Union. October 14, 1962. p. A36. OCLC 13155544. 
  14. California State Legislature (1963). "An act...relating to routes on the state highway system". State of California. 1963 chapter 385, p. 1177. 
  15. Parry, Bill (February 21, 1965). "150 Additional Freeway Miles Scheduled for San Diego Area". The San Diego Union. p. A31. OCLC 13155544. 
  16. Parry, Bill (June 6, 1965). "Route 805 Hailed as 'Totally New'". The San Diego Union. p. A13. OCLC 13155544. 
  17. James, Paul (July 3, 1966). "Dekema Predicts Completion of Inland Freeway by 1972". The San Diego Union. p. B4. OCLC 13155544. 
  18. Ross, Charles (May 23, 1967). "State Asks Bids for Freeway In E. San Diego". The San Diego Union. p. B1. OCLC 13155544. 
  19. "S.D. Firms' Bid OKd for Freeway Job". The San Diego Union. July 23, 1967. p. C7. OCLC 13155544. 
  20. "$27.1 Million Freeway Job Set for Bids". The San Diego Union. August 27, 1968. p. B1. OCLC 13155544. 
  21. "2 Area Firms Win Interchange Job". The San Diego Union. November 8, 1968. p. B3. OCLC 13155544. 
  22. Stone, Joe (May 27, 1969). "New Mission Valley Span Beauty Cited". The San Diego Union. p. B3. OCLC 13155544. 
  23. "National City Flexes Muscles for Growth". The San Diego Union. June 14, 1969. p. B7. OCLC 13155544. 
  24. "Bids Called for Section of Interstate 805". The San Diego Union. July 5, 1969. p. C8. OCLC 13155544. 
  25. California State Legislature (1969). "An act... to take effect immediately". State of California. 1969 chapter 294. 
  26. "San Diego Freeway Work Hit by Action". The San Diego Union. September 5, 1969. p. A8. OCLC 13155544. 
  27. Clance, Homer (September 17, 1969). "Construction OKd on Interstate 805". The San Diego Union. p. A1. OCLC 13155544. 
  28. Scott-Blair, Michael (October 9, 1969). "$15 Million Pact Let for Freeways". The San Diego Union. p. B1. OCLC 13155544. 
  29. "Riverside Firm Wins Contract for Road Work". The San Diego Union. December 21, 1969. p. B1. OCLC 13155544. 
  30. "San Ysidro's Replacement Homes Studied". The San Diego Union. November 8, 1969. p. B2. OCLC 13155544. 
  31. "Highway Office Reports on Area Freeway Progress". The San Diego Union. March 15, 1970. p. B4. OCLC 13155544. 
  32. "Highway Pact Awarded". The San Diego Union. March 19, 1970. p. B1. OCLC 13155544. 
  33. "Interstate 805 Link Dedicated". The San Diego Union. July 7, 1970. p. B1. OCLC 13155544. 
  34. "Border Entry Urged Near Brown Field". The San Diego Union. May 15, 1970. p. B1. OCLC 13155544. 
  35. "City Council Airs New 805 Route". The San Diego Union. August 26, 1970. p. B1. OCLC 13155544. 
  36. "$10 Million Loss Seen in 805 Rerouting". The San Diego Union. September 1, 1970. p. B1. OCLC 13155544. 
  37. "Chula Vista Urges Early Road Work". The San Diego Union. September 10, 1970. p. B1. OCLC 13155544. 
  38. "Bids Sought for 805 Link". The San Diego Union. September 24, 1970. p. B2. OCLC 13155544. 
  39. "State Highway Commission Adopts $905 Million Budget". The San Diego Union. October 23, 1970. p. B9. OCLC 13155544. 
  40. "Bids Taken by State on 2 Highways". The San Diego Union. December 17, 1970. p. B1. OCLC 13155544. 
  41. "Dedication Set for Part of Interstate 805". The San Diego Union. February 25, 1971. p. B3. OCLC 13155544. 
  42. "Gap Closed on Mission Valley Bridge". The San Diego Union. March 16, 1971. p. B3. OCLC 13155544. 
  43. "Mobile Home Park Readied in San Ysidro". The San Diego Union. April 9, 1971. p. B1. OCLC 13155544. 
  44. 44.0 44.1 44.2 44.3 44.4 "Completion Date Fixed in August". The San Diego Union. March 19, 1975. p. B3. OCLC 13155544. 
  45. "$60 Milion Due County for Roads". The San Diego Union. October 23, 1971. pp. B1, B2. OCLC 13155544. 
  46. "State Asks Bids on Section of Interstate 805". The San Diego Union. December 15, 1971. p. D4. OCLC 13155544. 
  47. "Long Beach Firm Awarded Contract". The San Diego Union. February 26, 1972. p. B2. OCLC 13155544. 
  48. "El Cajon Council to Ask Cycling on Interstate 805". The San Diego Union. February 2, 1972. p. B1. OCLC 13155544. 
  49. "Route 805 Bicycle Day Set March 19". The San Diego Union. March 8, 1972. p. B1. OCLC 13155544. 
  50. "Public's Mood Shifts away from Freeways". The San Diego Union. January 8, 1974. p. X16. OCLC 13155544. 
  51. "County Road Share Set at $30 Million". The San Diego Union. January 12, 1974. p. B3. OCLC 13155544. 
  52. "New Highway Link to Open". The San Diego Union. January 28, 1974. p. B1. OCLC 13155544. 
  53. "805 Open to State 94". The San Diego Union. March 7, 1974. p. B1. OCLC 13155544. 
  54. "Interstate 805 Continues Southward Advance". The San Diego Union. December 13, 1974. p. B1. OCLC 13155544. 
  55. Scaglione, Cecil (January 12, 1975). "Mayor Foresees Scramble for Sites as I-805 Develops". The San Diego Union. p. B3. OCLC 13155544. 
  56. "Interstate 805 Dedicated but Opening Date Delayed". The San Diego Union. July 24, 1975. p. B3. OCLC 13155544. 
  57. "Unopened 805 Usage Prohibited". The San Diego Union. July 29, 1975. p. B3. OCLC 13155544. 
  58. "Officials Say Interstate 805 Is End of Road for Funds". The San Diego Union. September 4, 1975. p. B3. OCLC 13155544. 
  59. 59.0 59.1 59.2 "Bridges Span Design Spectrum". The San Diego Union. January 11, 1976. p. F6. OCLC 13155544. 
  60. Smith, Cliff (August 11, 1968). "Bids Due Soon for Viaduct in Mission Valley". The San Diego Union. p. B1. OCLC 13155544. 
  61. "Viaduct Takes Shape". The San Diego Union. August 7, 1969. p. A28. OCLC 13155544. 
  62. "Interstate 805 Span Shows Geometric Beauty". The San Diego Union. August 24, 1970. p. A3. OCLC 13155544. 
  63. "Boat-Like Curves Mark Overpass". The San Diego Union. August 11, 1968. p. B1. OCLC 13155544. 
  64. "Interstate 805 Bridge Grows in Beauty". The San Diego Union. July 29, 1969. p. A3. OCLC 13155544. 
  65. Lewinson, David (August 16, 1984). "Outdoor Artworks Bring New Beauty to Freeway Travel". The San Diego Union. p. E8. OCLC 13155544. 
  66. Jones, Bob (February 26, 1984). "Architecture at Its Best in S.D Freeways". The San Diego Union. p. F1. OCLC 13155544. 
  67. Ball, Neil (January 30, 1977). "Ruling Awaited on New Billboards On Interstate 805". The San Diego Union. p. B16. OCLC 13155544. 
  68. Gross, Greg (April 2, 1981). "I-805 Graffiti Artist Sought". The San Diego Union. p. B1. OCLC 13155544. 
  69. "Mural Is Given to San Diego". The San Diego Union. August 28, 1981. p. B13. OCLC 13155544. 
  70. Scaglione, Cecil (July 16, 1976). "Border Community Wants I-805 Named San Ysidro". The San Diego Union. p. B3. OCLC 13155544. 
  71. "Father Of S.D. Freeways Now Has One of His Own". The San Diego Union. February 20, 1982. p. B3. OCLC 13155544. 
  72. Romero, Bill (November 23, 1982). "Dekema Honored". The San Diego Union. p. B3. OCLC 13155544. 
  73. Williams, Jack (April 3, 2005). "Ed Settle: Designer Created Scenic Freeway in Balboa Park". San Diego Union-Tribune. p. J5. OCLC 25257675. 
  74. Weisberg, Lori (April 30, 1989). "Bottleneck at I-5/805 Is Dilemma". The San Diego Union. p. B1. OCLC 13155544. 
  75. Kubik, Agnes (June 2, 1989). "Residents Express Anguish at Plans to Expand I-5 Junction". Evening Tribune (San Diego). p. B8. OCLC 37687666. 
  76. Arner, Mark (July 22, 2000). "Highways Receive Bulk of Money in SANDAG Transportation Plan". San Diego Union-Tribune. p. B3. OCLC 25257675. 
  77. LaRue, Steve (March 1, 2002). "I-5/805 Merge Widening Under Way". San Diego Union-Tribune. p. B2. OCLC 25257675. 
  78. "Showers Push Back Opening of Bypass". The San Diego Union-Tribune. February 19, 2006. p. B3. OCLC 25257675. 
  79. "Robot Buses Pull In to San Diego's Fastest Lane". Wired. July 24, 2007. OCLC 24479723. Retrieved August 19, 2007. 
  80. Schmidt, Steve (October 13, 2009). "Short Takes". San Diego Union-Tribune. p. B2. OCLC 25257675. 
  81. Fry, Wendy (September 21, 2010). "Public Hearings Set on I-805 Expansion". San Diego Union-Tribune. p. B2. OCLC 25257675. 
  82. Hawkins, Robert (June 30, 2011). "I-805 HOV-Lane Project Gets $100M from State". San Diego Union-Tribune. p. B2. OCLC 25257675. 
  83. Hawkins, Robert (September 19, 2011). "State Sending Region $82.6M for Road Work". San Diego Union-Tribune. p. B2. OCLC 25257675. 
  84. Hawkins, Robert (December 17, 2011). "SANDAG Agrees to Purchase South County Toll Road". San Diego Union-Tribune. p. A1. OCLC 25257675. 
  85. Nichols, Chris (February 26, 2013). "Express Lanes Project to Commence on I-805". U-T San Diego. p. B2. OCLC 25257675. 
  86. Nichols, Chris (May 1, 2013). "Ramps to Speed Access to I-15". U-T San Diego. p. NC1. OCLC 25257675. 
  87. Nichols, Chris (March 7, 2013). "Forum Set on Upcoming South Express Lanes". U-T San Diego. p. NI2. OCLC 25257675. 
  88. District 11 (June 2013). "Interstate 805 Express Lanes North Project Fact Sheet". California Department of Transportation. Retrieved October 8, 2013. 
  89. "Interstate 805 South Project Fact Sheeet". District 11. California Department of Transportation. February 2013. Retrieved October 8, 2013. 
  90. "Log of Bridges on State Highways". California Department of Transportation. July 2007. Retrieved February 10, 2008. 
  91. Warring, KS. "I-805 Northbound Freeway Interchanges". California Numbered Exit Uniform System. California Department of Transportation. Retrieved February 5, 2009. 
    Warring, KS. "I-805 Southbound Freeway Interchanges". California Numbered Exit Uniform System. California Department of Transportation. Retrieved February 5, 2009. 

External links

Route map: Google / Bing
This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.