IC3

From Wikipedia, the free encyclopedia
DSB Class MF

DSB Class MF at Frederikshavn station, August 2007

Interior of a DSB Class MF
In service 1991-
Manufacturer ABB Scandia
Constructed 1989–1998
Number built 202
Formation MFA-FF-MFB
Operator DSB
RENFE
Israel Railways
Specifications
Train length 58.80 m (192 ft 11 in)
Width 3.10 m (10 ft 2 in)
Height 3.85 m (12 ft 8 in)
Maximum speed 180 km/h (112 mph)
Weight 97 t (95.5 long tons; 106.9 short tons)
Power output 1,193 kW (1,600 hp)
Transmission Mechanical
Braking system(s) Pneumatic brake
Electromagnetic track brake
Multiple working IC2
IR4
Track gauge 1,435 mm (4 ft 8 12 in)
Bombardier IC3 train set

The IC3 (or class MF) is a Danish-built high-comfort medium/long distance diesel multiple-unit train. The sets were built by ABB Scandia (later purchased by Adtranz, which itself was subsequently acquired by Bombardier Transportation). This train model has been operating in Denmark and Sweden since 1989. The name indicates simply that it is a three-carriage InterCity trainset.

An electrically powered four-carriage version, the IR4 was introduced between 1995 and 1998.[1]

General Overview

The IC3 is a wide, articulated train (with Jacobs bogie - bogies shared between carriages) made of light alloy. There are two 298 kW (400 hp) engines in each end of the front and rear carriages, central car has none, giving a total of 1,192 kW (1,598 bhp).

Two IC3 trains coupled together, the front door swung aside. Notice the large pins (retracted) which are responsible for keeping the door shut when the cab is used
Rubber diaphragms sealing the trains together

The efficient mechanical transmissions with multiple gear ratios and high power for the 97 t tare weight give the IC3 good acceleration capabilities. The short distances between stations on inter-city routes in Denmark makes acceleration more important than high top speed, and so the IC3 units are geared for a top service speed of only 180 km/h (112 mph).

The front- and cab-design is the most significant feature of the IC3 (and its cousins). When viewed from the outside, the viewer will notice the large rubber diaphragm surrounding a flat cab. The cab is separate department in the train, but the table with the controls are mounted on a huge door, to which the seat is also mounted. When two or more units are coupled together in a single train, the entire front door folds away to give a wide passage, and the rubber diaphragms at the ends form a flush aerodynamic seal. The IC3 can also couple and run in tandem with the electrical version, the IR4. Up to five trainsets can be coupled together. In case of shuttle reason the IC3 can also be coupled mechanically with its Flexliner little sister IC2 but not the cousin ET-FT-ET.

Danske Statsbaner, the Danish State Railways, runs 96 IC3 sets and 44 IR4 sets. Their IC3 units are to undergo refurbishment, including engine and transmission upgrades to prepare them for regional service, when the inter-city services are taken over by their successor, the IC4.

Some IC3 run in Sweden, mainly Kalmar-Linköping. They are designated Y2 in Sweden. Before 2007 they also ran Malmö-Karlskrona, but that railway has been electrified.

Israel Railways IC3 heading for Jerusalem
RENFE Class 594 at Puerto-Escandon, April 2005

Another large operator of the IC3 trains is Israel Railways, who operate about 50 IC3 sets. Some of those sets were assembled in Israel by RAMTA, a division of IAI, and some are modified IC3 trainsets which were originally delivered to Sweden.

Similarly in Spain, the national rail operator RENFE operates some IC3 derivatives classified as RENFE Class 594 on the Valladolid - Zamora - Puebla de Sanabria, Coruña - Ferrol, Coruña - Lugo - Monforte de Lemos and Madrid - Soria routes since 1997 as a medium-range regional service (Media Distancia) The Class 594 trains were built by CAF under a technology license agreement from ABB Scandia.

In 1997, an Israel Railways IC3 was tested in North America under the name ‘Flexliner’. Amtrak used it on the Hiawatha, San Diegan, and between Eugene and Portland, Oregon; Via Rail Canada tested it for services on the Windsor–Quebec corridor.

The total number of ABB Scandia/Adtranz-built IC3 and IC3-based trainsets is 202.

History

Development of the IC3 started in 1984, production started in 1986, and they entered service in 1991. However, its roots can be traced back further. In 1972, DSB celebrated its 125th anniversary, and at the same time made some large changes. First of all, two years later, in 1974, a completely new timetable system, the K74, was introduced. Secondly, the concept of lyntog were removed as the foundation of the long-distance traffic, and instead a new InterCity concept took over that role. After a few years, a new concept emerged, the so-called APOs, which were work-groups tasked with specific areas. There were groups for electrical locomotives, diesel-powered locomotives, and others, including the "long distance train" APO group.

The long-distance train - APO was originally tasked with finding a suitable train for long-distance traffic. However, it was later rumoured that the lyntog-concept might be re-introduced within a few years, and so it was decided to find a suitable design for that concept. Several requirements were made: primarily to use air-conditioning for cooling and heating of passenger areas, and be able to use either electric or diesel propulsion. The second requirement were due to the fact, that the Danish politicians had yet to decide whether or not to fund a proposed electrification of the mainlines of the Danish railroads. At the time, no such train were available, so the group designed one themselves. In order to avoid propulsion units in the train (and thus reducing variants and development costs), it were designed to use a locomotive to haul it, and equip the end wagons with driver cabins. The train were designed a set of 5 wagons, with a service wagon in the middle (containing a small kiosk, and other facilities) and 4 passenger wagons.

In 1983, the group responsible for the timetables, had made a set of requirements for the ideal future train for the InterCity traffic, and those requirements were based on the experiences from the prototype (which had now become known as IC5): it should be light-weight (preferably built of aluminium), its passenger compartments should have fixed windows and air-conditioning, it should be self-propelled, it should use standard engine and transmission components from the bus and truck industry, and it should be fast and easy to add carriages (by coupling with another trainset); along with a number of technical requirements. The new project became designated IC3.

After the IC3 project had been proposed, it was relatively quickly decided to cancel development of the IC5-prototype, as it suffered from several problems. The main problem was the weight of the train. Originally it had been estimated to weigh around 200 to 210 tonnes, but ended up weighing 270 tonnes. A train of similar size and capacity, consisting of conventional wagons, would weigh approximately the same as originally estimated. When it was first proposed to cancel the IC5 project, the trains designers tried to save it by proposing several solutions to the trains problems, but to no use: DSB's management had decided that the IC3 was the proper train for the future.

The task of developing the IC3 was assigned to a joint-group of designers and technical engineers from DSB itself and the factory Scandia (now a part of the Bombardier corporation). As a side note, it should be mentioned that neither DSB or Scandia themselves, wished that they (Scandia) got the task, as they had pretty much no experience in this kind of trains.

The first IC3 set was delivered in 1988, but unfortunately suffered from a number of teething problems, primarily due to its (at the time very advanced) computer systems. One example was that it would lock the toilet door with no apparent reason (it was programmed to lock the door when either someone was in there and requested so via a button, or when the toilet-system suffered a problem). By late 1990, the majority of these problems had been solved, and so the train entered service in 1991.

Technical overview

An IC3 set consists of (as the name implies) three carriages. These are the MFA (passenger and motor carriage), the FF (passenger center carriage) and the MFB (passenger and motor carriage). The MFA and MFB are, from a technical point-of-view, identical and only differ slightly in the interior design.

The train is powered by four diesel engines, each delivering 298 kW (400 bhp) or 405 metric hp, giving the train a total 1,193 kW (1,600 bhp) or 1622 metric hp to propel it. The engines are mounted in the MFA and MFB carriages, with two engines in each carriage. Each engine drives the axles on the bogies via an electronically-controlled automatic gearbox. The engines are mounted so that the end which would normally point forwards in a rear-wheel-drive car, instead faces the center of the MFA and MFB carriages. Due to this mounting design and nature of combustion engines and to the fact that the train runs forward in both directions, a so-called "reverse gear" had to be attached to automatic gearboxes. They are responsible for making the axles turn the right way. These gears are normally not controlled directly by the train's driver; instead, the train's on-board computers check which of the two cabs is active to determine the train's primary driving direction, setting the reverse gears accordingly.

Fleet details

Class Operator Number built Year built Cars per set Unit nos. Notes
Class MF DSB 92 1986–1992 3 5001-5092
4 5093-5096 Purchased from SJ
Class 594.0 RENFE 16 1997–2001 2 594001-594002
504004-594008
594010-594015
Class 594.1 8 594101-594108 Built with tilting capability
Class 594.2 2 594201-594202 Converted from 594.0
Built with variable gauge capability
IC3 Rakevet Yisra'el 10 1992 3 01-10
31 1994–1996 11-41
9 1990 42-50 Purchased from SJ
Entered service 2005

Danish derivatives

The IC3 has not only served as the backbone of the Danish InterCity-concept for the past 15 years; it has also served as the foundation and/or inspiration for four other trains. These are the IR4, the IC2, and the ET-FT-ET trains.

IR4 "InterRegional 4"

An IR4 train passing Hvidovre Fjern near Copenhagen

The first of the IC3's offspring, which is electrically powered. It was originally designed for the Danish regional traffic, but has later been upgraded and is currently also being used in the InterCity traffic, often together with one or more IC3-set(s) on routes which has been electrified. The IR4 consists of 4 carriages (as implied by its name), all of which are similar in design to the MFA/MFB carriages (when viewed from the outside), with a wide set of doors in one end of each carriages. A total of 44 IR4 sets were built, and 43 sets are still in use, as 1 set burned in 2010.

IC2 "InterCity 2"

The second of the IC3's offspring is often described as a "discount edition of the IC3", which is not entirely fair. It was designed in 1992–1993, when the Danish private railways began to search for a newer train. It was originally proposed to be an IC3 with the center carriage (the FF) removed, and without engines in one of the remaining carriages. This design did not entirely satisfy representatives of the private railways, so instead, after some debate, it was redesigned to its current appearance.

The IC2 consists of 2 carriages, the MF and the FS. The MF is a combined engine and passenger carriage, and has its set of doors placed towards the cab of the carriage, actually as close to the bogies as possible. The MF houses the engines, which are mounted under the floor in the middle of the carriage. It has two engines, delivering a total of 627 kW (840 hp), and drives the train in the same way as the MFA/MFB carriages drives the IC3.

One of Vestsjællands Lokalbaners IC2 trains entering Fårevejle station. Autumn 2003.

The FS is a combined cab and passenger carriage, and has a quite unique look when viewed from the outside. This is due to the "low-floor entrance" feature included in the design, where part of the floor and doors between the two bogies are "sunken" to a height of 60 cm (23.6 inches) from the top of the rails. This provides very easy access to the train, especially when bicycles, wheelchairs, and the like need to be put on the train. This easy entrance is because the 60 cm (23.6 inches) from the top of the rails, is also the general height within a few centimeters (1–2 in or 2.5–5.1 cm) of platforms on the Danish railway network.

There are some technical differences between the IC2 and the IC3. The most obvious is of course the smaller number of carriages, and other engines (the IC3 has four engines, each delivering approx. 298 kW or 400 hp; the IC2 has two engines, each delivering approx. 313 kW or 420 hp). Other differences include the way the engines are cooled (the IC3 engines are aircooled, but due to several technical issues with this system, it were decided to use watercooled engines), electric-driven AC system (another thing decided after experience with the IC3, which AC system were powered directly from the engines).

One final thing to notice is that although the IC2 shares its physical profile and physical coupling system with the IC3 and the IR4, they are incapable of actually driving as a companion with those two "relatives". This is due to the nature of the trains. The designers of the computer system which transmits the driver's commands to the engines and gearboxes have not been able to come up with a common system for all three types. Instead, in order for the different types to work together, a special interface-module is required, which must be built into each trainset (except from the IC3, from which the original command-signal comes). However, due to financial issues, and the fact that it would probably not be used, it was decided not to have this module in the trains, although it can easily be added if needed.

A total of thirteen IC2-sets were built, all of which are in service. The largest operator is Lollandsbanen, who have 10; the only other operator is Vestsjællands Lokalbaner.

Oresundtrain

An Oresundtrain passing Nordhavn station in Copenhagen.

The third and newest of the IC3's offspring is specifically designed for use in the regional traffic in areas surrounding the Oresund Bridge. The train is operated by both DSB and Veolia Transdev. Its formation is ET-FT-ET. The train is electrically powered, and can run on both Danish power (25 kV, 50 Hz) and Swedish power (15kV, 16 Hz). It is called Contessa by its manufacturer,[2] and designated Litra ET in Denmark and X31K in Sweden. Only the front and the cabin are similar to IC3. The wheels, bogies and engines are more similar to Bombardier Regina and each carriage has two bogies. It is used for the regional cross-border traffic called Øresundstog, and the train trype is also often called that, these trains are used for some other traffic also.

Train fire

On December 28, 2010, an IC3 train in Israel caught fire due to a technical failure, injuring 121 people.[3] A soldier had to shoot the windows in order to allow the crowd to escape.[4] The cause of the fire was not an electrical short as first suspected but rather a mechanical problem with the cardan joint which is located next to the fuel tank in the train.

On December 30, 2010 Israel railways decided on an immediate stoppage of all the IC3s in the fleet, pending further investigation. The ramifications of this decision are the closure of several lines and stations, including Jerusalem and Dimona and several other suburban lines.[5] Service was resumed on all routes after modifications were approved.

Notes

  1. Togsæt , section "Elektrisk togsæt, IR4-tog, fjern- og regionaltrafik" , www.dsb.dk
  2. "Inc. - Bombardier - Home". Bombardier. 2011-12-23. Retrieved 2011-12-31. 
  3. Train fire leaves 121 injured, Ynet.
  4. Train doors stuck; soldier fires at windows, Ynet.
  5. Israel Railways announcement (Hebrew)

References

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.