Hengyang-Liuzhou Intercity Railway

From Wikipedia, the free encyclopedia

Hengyang-Liuzhou
Intercity Railway
衡阳柳州城际铁路
Overview
Status Under Construction
Locale Chongqing
Lanzhou
Termini Hengyang East
Liuzhou
Services 1
Operation
Operator(s) China Railway High-speed
Technical
Line length 497.9 km (309 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Operating speed 200Km/h
Hengyang-Liuzhou Railway
Line length:497.9 km (309 mi)
Track gauge:1,435 mm (4 ft 8 12 in)
Maximum speed:200 km/h (124 mph)

Hengyang–Liuzhou High-Speed Railway is a high-speed railway in South-Western China, connecting Hunan and Guangxi provinces. It will allow for a high-speed connection with the Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway and will link with the Guangxi capital of Nanning via the Liuzhou-Nanning Intercity Railway. It has allowed for direct high-speed services from Beijing to Guilin in only 10 hours.

History

Construction commenced in 2009 and was completed in May 2013.[1] It was opened for service on 28 December 2013.[2]

Route

The 497.9 km route has a designed maximum speed of 200Kph. It departs from the Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway at Hengyang East Railway Station, it then travels west through the major cities of Yongzhou, Guilin and arriving at Liuzhou

Notes

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.