Guntur-Macherla section

From Wikipedia, the free encyclopedia
Guntur–Macherla section
Overview
Status Operational
Locale Andhra Pradesh
Termini Guntur
Macherla
Operation
Opening 1930
Owner Indian Railway
Operator(s) South Central Railway
Technical
Track length 130 km (81 mi)
No. of tracks 1
Track gauge 1,676 mm (5 ft 6 in) Broad gauge

Route

Guntur-Macherla section
Legend
to Guntur-Repalle section
0 Guntur
5 Nallapadu
to Nallapadu-Giddalur section
13 Bandarupalle
19 Mandapadu
22 Siripuram
26 Lingamguntla
30 Peddakurapadu
36 Gudipudi
42 Sattenapalle
54 Reddigudem
60 Bellamkonda
74 Piduguralla
83 Tummalacheruvu
95 Nadikudi
to Nadikudi-Bibinagar section
105 Gurujalas
115 Rentachintala
130 Macherla

The Guntur-Macherla section is on Repalle-Bibinagar branch line. It belongs to South Central Railway of Guntur division.

History

The Guntur-Macherla section was opened in 1930.[1] It was a Metre gauge line earlier. Later it was to coverted Broad gauge. This line was used during the construction of Nagarjuna Sagar Dam.

Route

This route starts from Guntur which passes through Nallapadu,Piduguralla,Satennapalle and Nadikudi.This them Section joins Nadikudi-Bibinagar section.

References

External links

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.