Gemasolar Thermosolar Plant

From Wikipedia, the free encyclopedia
Gemasolar

Gemasolar
Location of Gemasolar
Country Spain
Location Fuentes de Andalucía, Sevilla
Coordinates 37°33′29.11″N 5°19′44.6″W / 37.5580861°N 5.329056°W / 37.5580861; -5.329056Coordinates: 37°33′29.11″N 5°19′44.6″W / 37.5580861°N 5.329056°W / 37.5580861; -5.329056
Status Operational
Commission date May 2011
Owner(s) Torresol Energy
Solar farm
Type CSP
CSP technology Solar power tower
Heliostats 2,650
Power generation
Installed capacity 19.9 MW
Annual generation 110 GW·h

Gemasolar is a concentrated solar power plant with a molten salt heat storage system.[1] It is located within the city limits of Fuentes de Andalucía in the province of Seville, Spain.[2]

Gemasolaire

The plant is a 140 m high solar power tower and uses concepts pioneered in the Solar One and Solar Two demonstration projects, using molten salt as its heat transfer fluid and energy storage medium. Originally called Solar Tres, it was renamed Gemasolar.[3]

The project, which has received a subsidy of five million Euros from the European Commission and a loan of 80 million Euros from the European Investment Bank, makes use of the Solar Two technology tested in Barstow, California, but is approximately three times the size. It makes use of several advances in technology after Solar Two was designed and built.

Gemasolar is the first commercial solar plant with central tower receiver and molten salt heat storage technology. It consists of a 185 ha solar field that has a 140-m high tower receiver, a power island and 2650 heliostats, each 120 m2 and distributed in concentric rings around the tower.[4]

The most innovative aspects of the plant, which belongs to the company Torresol Energy, are its molten salt receiver, its heliostats aiming system and its control system. In addition, its storage system allows it to produce electricity for 15 hours without sunlight (at night or on cloudy days). This storage capacity makes its solar power manageable so that it can be supplied based on demand. The plant has already been able to supply a full day[5] of uninterrupted power supply to the grid, using thermal transfer technology developed by SENER.

Gemasolar, with its 19.9 MW of power, can supply 110 GWh per year — enough to supply power to 27,500 homes. The plant has been operational since May 2011. Its official launch was held in October 2011.[6]

See also

External links

References

  1. "Torresol’s landmark Gemasolar CSP solar plant is officially commissioned". International Resource Journal. 24 May 2011. Retrieved 20 March 2012. 
  2. NREL CSP Technology Workshop: Solar Tres, SENER Ingeniería y Sistemas, S.A., 2007-03-07, accessed 2007-05-31
  3. CSP: Concentrated Solar Power
  4. "Gemasolar Thermosolar Plant". Concentrating Solar Power Projects. National Renewable Energy Laboratory (NREL), U.S. Dept. of Energy (DOE). 24 October 2011. Retrieved 20 March 2012. 
  5. Gemasolar, energía non stop Spanish 26 October 2011
  6. Gemasolar: how it works
This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.