Coordinates | 51°39′46″N 0°1′22″W / 51.66278°N 0.02278°WCoordinates: 51°39′46″N 0°1′22″W / 51.66278°N 0.02278°W |
Commission date | 1999 |
Operator(s) | E.On |
Power station | |
Primary fuel | Natural gas-fired |
Power generation | |
Installed capacity | 400 MW[1] |
grid reference TQ368978 |
Enfield Power Station is a 400 MW[1] gas-fired station, opened on part of the original Brimsdown Power Station site on Brancroft Way at Brimsdown in the North London Borough of Enfield. It is near the A1055 and Lee Valley Park.
History
Known as Enfield Power Station (originally Enfield Energy Centre) this has been operated by E.ON UK since 6 May 2005, being bought for £109 million and became E.ON's fifth gas power station in the United Kingdom. Construction was started in September 1997. It was commissioned in December 1999. It employs twenty seven people.
It was opened as the Enfield Energy Centre Ltd, being owned by Indeck Energy Services and Enfield Holdings BV, itself jointly owned by NRG Energy Services and El Paso Energy.[2]
Specification
It is a CCGT type natural gas power station. Using an Alstom GT26B2.2 gas turbine.,[1][3] to drive an electrical generator rated at 500 MVA and with a terminal voltage of 21 kV. Waste heat is recovered by a Combustion Engineering heat recovery steam generator to drive an Alstom Steam Turbine unit connected via a SSS clutch to the main powertrain. It connects to the National Grid via a transformer at 132 kV.