Elektrėnai Power Plant

From Wikipedia, the free encyclopedia
Elektrėnai Power Plant

Elektrėnai power plant
Location of Elektrėnai Power Plant
Official name Lietuvos elektrinė
Country Lithuania
Location Elektrėnai
Coordinates 54°46′15″N 24°38′34″E / 54.77083°N 24.64278°E / 54.77083; 24.64278Coordinates: 54°46′15″N 24°38′34″E / 54.77083°N 24.64278°E / 54.77083; 24.64278
Status Operational
Construction began 1960
Commission date 1972
Owner(s) Lietuvos Energija
Operator(s) Lietuvos Elektrinė AB
Power station
Primary fuel natural gas
Secondary fuel heavy fuel oil
Tertiary fuel Orimulsion
Generation units 8
Power generation
Installed capacity 1,800 MW

The Elektrėnai Power Plant or Lithuania Power Plant (Lithuanian: Lietuvos elektrinė) is an 1,800-MW electrical generating station near Elektrėnai, Lithuania, about 50 kilometres (31 mi) west of Lithuania's capital, Vilnius. It is operated by Lietuvos Elektrinė, a subsidiary of Lietuvos Energija.[1]

The plant was built in stages between 1960 and 1972. The Strėva River was dammed to supply it with cooling water, creating the Elektrėnai Reservoir. As of 2008 the plant comprised eight units fired with natural gas, heavy fuel oil, and a bitumen-based fuel known as Orimulsion, imported from Venezuela. It was designed as a base load plant, and generated about 10 TWh per year until 1992. Its operations were then reduced to about 5% of its capacity, since it acted only as a reserve in the Lithuanian power system.

After the shutdown of the Ignalina nuclear power plant in 2009, the plant became the primary source of Lithuania's electrical power. Since the plant does not meet European Union environmental guidelines, a number of improvement projects have been proposed. A flue-gas desulfurization project was completed in September 2008.[2] In December 2007, Economy Ministry Undersecretary Arturas Dainius announced that a new 400-MW combined cycle unit would be built at the site as well. The cost of the new unit was estimated at 252 million euros; 57% of the funding will be supplied by the European Union, 33% by the plant, and the remaining 10% by the National Ignalina Decommissioning Fund.[3]

The plant also supplies district heating to the town of Elektrėnai, established in 1962 to support its workers.

An interesting feature is that two of the three chimneys of EPP serve also as electricity pylons.

Footnotes

  1. "Lietuvos Energija acquires Lietuvos Elektrine shares". The Baltic Course. 2010-10-13. Retrieved 2010-10-29. 
  2. "Environmental upgrade for Lithuanian Power Plant". European Bank for Reconstruction and Development. 2010-04-19. Retrieved 2010-10-29. 
  3. "EU grants EUR 50 mln for upgrading of Lithuanian Power Plant". Lithuania in the European Union. BNS. 2007-12-20. Retrieved 2008-04-29. 

References

  • European Bank for Reconstruction and Development - Executive Summary of Environmental Impact Assessment - Environmental and Related Technical Upgrading of Lithuanian Power Plant
This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.