Edirne Cut-off

From Wikipedia, the free encyclopedia
Edirne Cut-off
Overview
Type Heavy rail
System TCDD, BDZ
Status Operating
Locale Western Thrace
Termini Pehlivanköy, Turkey
Svilengrad, Bulgaria
Stations 7
Operation
Opening 1971
Owner Turkish State Railways (Pehlivanköy-Kapıkule)
Bulgarian State Railways (Kapıkule-Svilengrad)
Depot(s) Edirne Yard, Kapıkule Yard
Technical
Line length 80 km (50 mi)
No. of tracks 1
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 25 kV Hz
Route map

The Edirne Cut-off is a 80 km (50 mi) long rail line from Pehlivanköy, Turkey to Svilengrad, Bulgaria. The line was built in 1971 by the Turkish State Railways in order to avoid crossing the border with Greece, on the former Oriental Railway's main line, in order to get to Edirne. The Hellenic Railways Organisation (OSE) also built a cut-off from Neo Vyssa to Marasia in the same year. These two new rail lines lead to the abandonment of the former CO main line in Edirne as well as the Karaağaç Railway Station.

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.