Double acting ship
Double acting ship (DAS) is a type of icebreaking ship designed to run ahead in open water and thin ice, but turn around and proceed astern (backwards) in heavy ice conditions. Such ships can operate independently in severe ice conditions without icebreaker assistance but retain better open water performance than traditional icebreaking vessels.[1]
Double acting ships carrying liquid cargo are generally referred as double acting tankers (DAT). In the early 1990s Kværner Masa-Yards Arctic Technology Centre (MARC) developed the concept for oil transportation between the Russian Arctic and Europe and the first double acting tanker, Finnish crude oil tanker Tempera, was delivered in 2002.[1][2] The double acting ship concept was patented by MARC[3] and today the abbreviation "DAS" is a registered trademark of Aker Arctic Technology Inc.
History
In the early 1990s, studies conducted by Kvaerner Masa-Yards showed that the ship's open water efficiency is as important factor as its ability to operate in difficult ice conditions in oil transportation from the Russian Arctic to Europe. This was due to the fact that on a direct route 90% of the time would be spent in open water. Direct independent transportation with a vessel capable of navigating in both ice and open water was also found out to be a more economical alternative in comparison with transshipment, i.e. the use of different vessels for different parts of the journey, or normal ships relying on icebreaker assistance.[1]
Although icebreaking cargo ships had been built in the past, their hull forms were always compromises between open water performance and icebreaking capability. A good icebreaking bow, designed to break the ice by bending it under the ship's weight, has very poor open water characteristics and is subjected to slamming in heavy weather. However, a hydrodynamically efficient bulbous bow greatly increases the ice resistance, making it unsuitable for icebreakers.[4][5] As a result, the total efficiency of icebreaking ships is 20–40% less than that of good open water vessels of similar size mainly due to the bow form.[1]
In the late 1800s, captains operating ships in icebound waters discovered that sometimes it was easier to break through ice by running their vessels astern.[4] Although not known at the time, this was because the forward-facing propellers generated a lubricating water flow that lowered the ice resistance by reducing friction between the ship's hull and ice.[6] However, as the steering ability of a ship is greatly reduced when running astern, it could not be considered a main operating mode. These findings resulted in the adoption of bow propellers in older icebreakers operating in the Great Lakes and the Baltic Sea, but in the more severe Arctic ice conditions they could not be used because the risk of the bow propellers being damaged by multi-year ice floes was too great. Furthermore, forward-facing propellers have a very low propulsion efficiency and they considerably increase the ship's open water resistance, making them unsuitable for merchant ships.[1][4]
Development
Because of the limitations of traditional propulsion systems, the double acting ship concept wasn't seriously considered until the development of electric podded propulsion units which combine the advantages of the diesel-electric powertrain, already widely used in icebreakers, with the excellent manoeuvrability of azimuth thrusters.[1] Initially developed as a co-operation between the multinational electrical equipment corporation ABB Group and the Finnish shipbuilder Masa-Yards in the late 1980s, the new propulsion unit became known as Azipod (a portmanteau of "azimuth thruster" and "podded propulsion unit") which is today a trademark of ABB Group.[7]
The superiority of electric podded propulsion in icebreaking ships, especially when running astern, was proved when the first propulsion pod was installed on fairway maintenance vessel Seili, owned by the Finnish Maritime Administration, in 1990. Before the conversion the ship could not break ice astern at all, but after the propeller and rudder were replaced with an 1.5 MW Azipod unit she could run astern in level ice as thick as 0.6 metres (2 ft). The vessel could also easily be steered when running astern in ice. When product tankers Uikku and Lunni were converted to Azipod propulsion in 1993 and 1994, respectively, the result was similar increase in manoeuvrability and icebreaking capability. Even though the ships were originally designed with icebreaking capability in mind, after the conversion ice resistance in level ice when running astern was 40% of that when breaking ice ahead despite the ships being equipped with an icebreaking bow and not designed to break ice astern.[1][4]
Model tests conducted by MARC in 1994 showed that a double acting ship equipped with an Azipod propulsion unit could break through ice ridges in continuous motion instead of ramming like conventional icebreakers. It also required less power for running in level ice than traditional designs, resulting in 40–50% reduction in ice resistance due to lubricating effect of propeller-induced water flow, more open stern design and the propellers being allowed to mill (crush) the ice.[4] The icebreaking capability of an Azipod-equipped icebreaker operating astern in level ice was also found out to be superior to traditional icebreakers regardless of propulsion arrangement.[1]
Double acting ships
Icebreakers and other special vessels
The first double acting icebreaker, Azipod-equipped river icebreaker Röthelstein, was delivered in 1995. The vessel was designed to break apart ice ridges deeper than the vessel's draft when moving astern.[1] It was followed by icebreaking platform supply vessels Arcticaborg and Antarcticaborg, delivered in 1998, that were the first vessels to fully utilize the double acting ship concept by having the bow designed for operation in open water and light ice conditions, but being capable of breaking level ice up to one meter in thickness when running astern. With the help of two Azipod units, the ships can also penetrate ice ridges that in the Caspian Sea sometimes reach to the seabed.[6] In 2012, Wagenborg Offshore received two additional icebreaking support vessels for service in the Kashagan Field in the Caspian Sea. The ships, Sanaborg and Serkeborg, were the first vessels ever fitted with Icepods, Wärtsilä's brand of pulling ice-strengthened azimuth thrusters.[8]
The Norwegian Coast Guard operates a double acting offshore patrol vessel KV Svalbard, built in 2002 and equipped with two 5 MW Azipod propulsors. On 9 July 2007 the Canadian Broadcasting Corporation reported that Canadian Prime Minister Stephen Harper had announced that Canada would be building six to eight corvettes based on Svalbard. However, since the announcement, the design has progressed from an Azipod-equipped double acting ship to a more traditional shaft-driven version.[9][10]
Icebreaking supply and standby vessel SCF Sakhalin, delivered in 2005 as FESCO Sakhalin, was the first large-scale double acting icebreaker. The 99-metre (325 ft) vessel has two Azipod units with a total output of 13 MW. The ship, designed to break level ice up to 1.5 metres (5 ft) thick and 20-metre (66 ft) ice ridges with a 4-metre (13 ft) consolidated layer, has performed beyond expectation in the harsh ice conditions of the Sea of Okhotsk.[11] Two sister ships of slightly different design, Vitus Bering and Aleksey Chirikov, were ordered by Sovcomflot in 2010 and delivered in 2012 and 2013, respectively.[12]
The 3,500-ton United States Coast Guard multipurpose icebreaker and buoy tender USCGC Mackinaw, delivered in 2005, also incorporates some of the features typical for double acting icebreakers, such as podded propulsion and astern icebreaking capability.[13]
Three icebreaking platform supply vessels, Pacific Endeavour, Pacific Enterprise and Pacific Endurance, were delivered for Swire Pacific Offshore in 2006. The ships are equipped with two 7 MW Aquamaster ARC 1.0 Z-drive thrusters and are capable of breaking first year ice up to 1.5 metres (5 ft) thick and multi-year ridges with a thickness of 4 metres (13 ft).[14]
The 25 MW diesel-electric line icebreaker ordered by Rosmorport from Baltic Shipyard under the project name LK-25, Viktor Chernomyrdin, will be capable of proceeding continuously both ahead and astern in compact ice field up to 2 metres (6.6 ft) thick with a 20-centimetre (7.9 in) snow cover at 2 knots (3.7 km/h; 2.3 mph). The hybrid propulsion system of the new RMRS Icebreaker-8 ice class vessel is a further development of the traditional double acting concept and will consist of two 7.5 MW ABB Azipod units and a fixed 10 MW centerline shaft. The construction of the new polar icebreaker began in 2013 and it is expected to enter service in the Northern Sea Route in 2015.[15][16][17]
The new Chinese polar research vessel, currently in design stage and expected to enter service in 2014, will utilize the double acting concept. The PC3 ice class vessel, fitted with two azimuth thrusters, will be able to break level ice with a thickness of 1.5 metres (5 ft) and a snow cover of 20 centimetres (8 in).[18][19]
Cargo ships
Tankers
In 2001 Fortum ordered two 106,000 DWT double acting Aframax tankers from Sumitomo Heavy Industries Ltd., Japan, to replace the company's older tankers that, because of their lower ice class, had traffic restrictions during the worst part of the winter and could not deliver their cargo all the way to the refineries in Porvoo and Naantali because they were not given icebreaker assistance. When this happened, the oil had to be transported to smaller ships of higher ice class at the edge of the ice — a practice that was both uneconomical and hazardous. The new ships are equipped with one pulling-type 16 MW Azipod unit — the most powerful ice-strengthened pod ABB has ever produced[20] — and have the highest Finnish-Swedish ice class, 1A Super. They are designed to be capable of independent navigation and icebreaking in Baltic ice conditions with a possibility to operate also in the Pechora Sea. The ships follow the double acting principle with a bulbous bow for open water performance and stern designed with icebreaking performance in mind.[1] The first double acting tanker, Tempera, was delivered in 2002 and its sister ship, Mastera, in 2003.[2] The icebreaking capability of the vessels proved to be superior to other ships — in shuttle service between Primorsk, Russia, and the Finnish refineries the tankers required no icebreaker assistance and even acted as icebreakers for other merchant ships.[21] The ships can break level ice up to 1 metre (3.3 ft) thick at 3 knots (5.6 km/h; 3.5 mph) when operating astern.[22] As of 2012, Mastera and Tempera remain as the largest double acting tankers ever built.
The Swedish shipping company Donsötank operates four small product tankers that the company refers to as double acting ships. Prospero and Bro Sincero are 18,119 DWT product tankers built in 2000 and 2002, respectively, and equipped with one Siemens Schottel azimuth thruster each. Evinco and Excello are slightly larger at 19,999 DWT. Evinco, built in 2005, is equipped with one Schottel unit and the 2008-built Excello with two smaller Azipod units.[23]
In 2007, the Russian state-owned shipping company Sovcomflot ordered three 70,000 DWT double acting Arctic shuttle tankers from Samsung Heavy Industries, South Korea, to transport oil from the Varandey oil terminal and two similarly-sized ships of slightly different design from Admiralty Shipyard in St. Petersburg, Russia, for the Prirazlomnoye field. The first ship, Vasily Dinkov, was delivered in 2007 and its two sister ships, Kapitan Gotsky and Timofey Guzhenko in 2008 and 2009, respectively.[24] Kirill Lavrov, the first double acting tanker built in a Russian shipyard, was delivered in 2009 and the last of the series, Mikhail Ulyanov, in 2010.[25][26] The tankers, equipped with two Azipod units, are capable of bow loading and independent operation in level ice up to 1.2 meters in thickness.[25]
In March 2010 Norilsk Nickel placed an order for an Arc7 ice class oil tanker derivate of its double acting arctic cargo ships at Nordic Yards in Wismar. The 18,500 DWT vessel, referred to as the "Nordic AT 19" design, has similar main dimensions, characteristics and capabilities as the company's five icebreaking container vessels. The tanker, named Enisey, was delivered in the end of September 2011.[27][28]
The double acting ship has also been selected as the main transportation concept for the Yamal LNG project. The proposed Arctic LNG carriers would be capable of independent operation in level ice up to 2.3–2.4 metres (7.5–7.9 ft) in thickness.[29]
Freighters
The next generation of double acting ships emerged when the Russian mining company Norilsk Nickel ordered a prototype of a series of 14,500 DWT arctic general cargo/container ships intended to replace its ageing fleet of SA-15 class cargo ships that were built in Finland in the 1980s. Unlike the tankers, the ARC-7 ice class ship was designed to have excellent icebreaking capability, 2 knots in level ice with a thickness of 1.5 meters, both ahead and astern. The ship, Norilskiy Nickel, was delivered from Hietalahti shipyard in 2006 and performed beyond expectations during ice trials in the Yenisei Gulf.[21] Four additional ships, with an option for fifth, were ordered in 2007 from Aker Yards's shipyards in Germany, with deliveries in the second half of 2008 (Monchegorsk, Zapolyarny and Talnakh) and early 2009 (Nadezdha).[30][31] Later an oil tanker derivative of the same design was constructed by Nordic Yards.[28]
On 22 March 2011 Gaiamare, a subsidiary of Meriaura, ordered a 115-metre (377 ft) double acting multipurpose cargo ship designed especially for demanding projects such as transporting wind turbines to offshore installations. The new vessel, Meri, was built by STX Finland Turku shipyard and delivered in June 2012. The environmentally friendly ship, designed to run on biofuel, can also be used in oil spill cleanup — the vessel can be equipped with skimmers and has 2,700 m3 of tanks for recovered oil. The diesel-electric propulsion with two Siements Schottel Z-drive thrusters and two bow thrusters allows the ship to maneuver and even move sideways at low speeds, considerably increasing the oil recovery rate.[32][32]
See also
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 Juurmaa, K et al.: The development of the new double acting ships for ice operation. Kvaerner Masa-Yards Arctic Technology, 2001 and 2002.
- ↑ 2.0 2.1 Mastera/Tempera, Neste Oil. Retrieved on 2010-06-07.
- ↑ Icebreaking ship. FreePatentsOnline.com. Retrieved on 2013-12-19.
- ↑ 4.0 4.1 4.2 4.3 4.4 Juurmaa, K et al.: New ice breaking tanker concept for the arctic (DAT). Kvaerner Masa-Yards Arctic Technology, 1995.
- ↑ Kujala, P and Riska, K: Talvimerenkulku (TKK-AM-13). Department of Applied Mechanics, Helsinki University of Technology, 2010.
- ↑ 6.0 6.1 Aker Arctic Technology Inc.: Icebreaking Supply Vessels Arcticaborg and Antarcticaborg. Retrieved on 2010-02-08.
- ↑ Hepo-oja, Anssi; Mäki-Kuutti, Viktor (2012). Mekaanisen ja sähköisen propulsiojärjestelmän esittely. Satakunta University of Applied Sciences.
- ↑ New Icepod thruster favoured for Caspian and Alaskan operations. The Motor Ship, 1 March 2013. Retrieved on 2013-03-31.
- ↑ "Ottawa buying up to 8 Arctic patrol ships". CBC. 9 July 2007. Retrieved 2007c10.
- ↑ "Arctic patrol vessels approved by committee". CBC. 13 May 2007. Retrieved 2007-07-10.
- ↑ FESCO Sakhalin - Icebreaking supply and standby vessel. Aker Finnyards. Retrieved on 2011-05-19.
- ↑ Kahden uuden jäätämurtavan huoltoaluksen tilaus Arctech Helsinki Shipyard Oy:lle Sovcomflotilta. Meriteollisuus, 16.12.2010. Retrieved on 2011-05-19.
- ↑ Wilkman, G. New Ship Designs Under Development at Aker Yards. Powerpoint presentation. Aker Arctic, 2006. Slide 26.
- ↑ E-Class Ice Breaking Supply Vessels (IBSVs). Swire Group. Retrieved on 2011-07-29.
- ↑ ABB Wins $35 Million Order For Icebreaker in Russia's Arctic. 4-traders, 1 October 2012. Retrieved on 2012-10-01.
- ↑ ABB to Provide Propulsion Systems for Russian Next Generation Icebreaker. World Maritine News, 1 October 2012. Retrieved on 2012-10-01.
- ↑ New possibilities in Arctic offshore through new technologies. Mikko Niini, Aker Arctic, 4 February 2010. Retrieved on 2012-10-01.
- ↑ Laukia, K. and Weijia, Q.: Chinese Polar Research Vessel. Arctic Passion Seminar, 2013. Retrieved on 2013-03-31.
- ↑ Aker Arctic to Design Chinese Polar Research Icebreaker. World Maritime News, 31 July 2012. Retrieved on 2012-09-21.
- ↑ Potkurikeksintö herätti kilpailijat. Tekniikka & Talous, 9 October 2003. Retrieved on 2011-09-19.
- ↑ 21.0 21.1 Anatoly Gorshkovskij & Göran Wilkman: "Norilskiy Nickel" a Breakthrough in Cost Efficient Arctic Transports. Aker Arctic Technology Inc, 2007. Retrieved on 2010-06-07.
- ↑ Tempera – Double Acting Tanker, Ship Technology
- ↑ Fleet. Rederi AB Donsötank. Retrieved on 2011-07-29.
- ↑ Setcorp.ru: Russia's first Arctic Shuttle Tanker named "Vasily Dinkov", 2007-12-19. Retrieved on 2010-06-07.
- ↑ 25.0 25.1 Setcorp.ru: Kirill Lavrov — a new Arctic shuttle tanker — launched in St. Petersburg, 2009-12-27. Retrieved on 2010-06-07.
- ↑ Mikhail Ulyanov, Sovcomflot fleet. Retrieved on 2010-06-07.
- ↑ Trading Places. The Naval Architect, January 2011. Retrieved on 2011-10-17.
- ↑ 28.0 28.1 Tanker Nordic AT 19 leaves Wismar for test voyage. Nordic Yards. Retrieved on 2011-10-17.
- ↑ Focus on Growth - Corporate Strategy Day Presentation. Novatek, 9 December 2011. Retrieved on 2012-10-01.
- ↑ Norilsk Nickel: Publications, 2006-07-17. Retrieved on 2010-06-07.
- ↑ Norilsk Nickel: Norilsk Nickel completed creation of its own arctic fleet, 2009-02-26. Retrieved on 2010-06-07.
- ↑ 32.0 32.1 STX Finland Turun telakalle erikoisalustilaus. Meriteollisuus, 2011-03-23. Retrieved on 2011-07-02.