Chongqing Railway Station

From Wikipedia, the free encyclopedia

Chongqing Station
重庆站
Chongqing Railway Station
Location
Province Chongqing
(See other stations in Chongqing)
District Yuzhong
Caiyuan Lu
Coordinates29°33′9.5″N 106°32′38.5″E / 29.552639°N 106.544028°E / 29.552639; 106.544028
History
Pinyin Code Chongqing
Year opened 1952
Station statistics
Operator(s) Chengdu Railway Bureau
Ministry of Railways of the PRC
Line(s) Chuanqian Railway
Chengyu Railway
Xiangyu Railway
No. of platforms 4
Major bus terminal(s) attached to the station

The Chongqing Railway Station(simplified Chinese: 重庆站; traditional Chinese: 重慶站; pinyin: Chóngqìng zhàn) is a railway station of Chengyu Railway, Xiangyu Railway, Chuanqian Railway, Chengyu Passenger Railway, that located in People's Republic of China.

Once the most important railway station in Chongqing, this station handled virtually all long distance services to the rest of China. Located between central city area and the Yangtze River, the extremely steep terrain of Chongqing requires the longest escalator in Asia between the station to the commercial districts and Chongqing Metro Line 1 and Line 3.

Currently it has been closed for major renovations, in line with construction of the Chengdu–Chongqing Intercity Railway. Until 2015, only the ticket hall will remain open. However it is still also the site of a major bus terminal.

It is a transportation hub of Chongqing City, a municipality of China.

Structure

Chongqing station is a first-class terminus station of the Chengdu-Chongqing Railway, Xiangfan and Sichuan-Guizhou Railway. Due to its unique size and location, the throughput of the station is less than it was 20 years ago (the site is too small, requiring frequent shunting). With the limitations of Chongqing city's unique mountain environment, the station space is very narrow and not be able to further expand the station's capacity. Chongqing station will continue to maintain the same capacity of the 60-year first-class station. Other stations in Chongqing (such as Chongqing North) have been built, upgraded or being planned to handle the increased passenger needs of the city.

Station Layout

North↑
Yard Layout
1 Track Buffer |
1 Platform Low Level
2 Platform Low Level
2 Track Buffer |
3 Track Relief Track Buffer |
4 Track Buffer |
3 Platform Low Level
4 Platform Low Level
5 Track Buffer |
6 Track Relief Track Buffer |
7 Track Buffer |
5 Platform Low Level
6 Platform Low Level
8 Track Buffer |
9 Track Buffer |
7 Platform Low Level
CRE Sales Department
South↓

History

1950 Construction started, using about 1100 engineers and 3000 "counter-revolutionary criminals" and other prisoners to participate in the construction of the Chongqing Station by reform through labor.

1952 Chongqing station opened by Marshal Liu.[1]

1992 Chengdu Railway Bureau tried to fill in the river or even build an elevated railway station to increase capacity at Chongqing station. However the existing highway and Caiyuanba interchange hub along the Yangtze River forced them to abandon the construction. This causes the expansion of Shapingba Railway Station. While in Yubei area away from the main city 17 km outside addition to the construction of the new first-class station in Chongqing North Railway Station to ease passenger pressure at Chongqing station.

2012 Reconstruction and rehabilitation works commence. Chongqing Railway Station will be the terminus for the high-speed Chengdu–Chongqing Intercity Railway with a riverside park established on the roof.

See also

References

External links

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.