Bugoye Power Station

From Wikipedia, the free encyclopedia
Bugoye Power Station
Map of Uganda showing the location of Bugoye Station
Country Uganda
Location Bugoye, Kasese District
Coordinates 00°18′00″N 30°06′02″E / 0.30000°N 30.10056°E / 0.30000; 30.10056Coordinates: 00°18′00″N 30°06′02″E / 0.30000°N 30.10056°E / 0.30000; 30.10056
Status Operational
Commission date 7 October 2009
Power station
Primary fuel Hydropower
Generation units 2
Power generation
Maximum capacity 13 MW

Bugoye Power Station is a 13 MW mini hydroelectric power station in Uganda.

Location

The power station is located across the Mubuku River, in Bugoye, Kasese District, in Western Uganda. This location lies in the foothills of the Rwenzori Mountains, close to the border with the Democratic Republic of the Congo. Bugoye lies approximately 19 kilometres (12 mi), by road, north of Kasese, the location of the district headquarters, and the nearest large city.[1] The coordinates of the power station are: 00 18 00N, 30 06 02E (Latitude:0.3000; Longitude:30.1005).

Overview

The Bugoye Hydropower Project, is a run of the river mini-hydropower installation, with installed capacity of 13 MW. The energy generated is fed into the national electric grid at Nkenda Substation, located 6 kilometres (3.7 mi) from Bugoye, via a 33kV transmission line.

The power station is owned and operated by TronderEnergi, a Norwegian power company. Construction began in March 2008 and the plant was commissioned 19 months later in October 2009.[2] Bugoye Power Station is the third mini-hydropower station on River Mubuku. The other two are Mubuku I Power Station, owned by Kilembe Mines Limited (KML), with installed capacity of 5 MW and Mubuku III Power Station, owned by Kasese Cobalt Company Limited (KCCL), with installed capacity of 10 MW. In the literature, Bugoye Power Station is sometimes referred to as Mubuku II Power Station.[3]

Construction costs

The estimated costs for the dam and power plant is approximately US$35 million. The funding was facilitated by a loan from the Emerging Africa Infrastructure Fund, (EAIF). This does not include the construction of a 33kV transmission power line linking the power station to the substation where the power is integrated into the national grid. The power line was funded by a grant from the Government of Norway to the Government of Uganda. By mutual consent between the two governments, Tronder Power Limited, assumed the responsibility of developing, constructing, maintaining and servicing the power line.[4] Tronder Power Limited is a Ugandan company co-owned by TronderEnergi and Norfund.[5]