Bridgwater railway station
Bridgwater | |
---|---|
Location | |
Place | Bridgwater |
Local authority | Sedgemoor, Somerset |
Coordinates | 51°07′38″N 2°59′30″W / 51.1272°N 2.9917°WCoordinates: 51°07′38″N 2°59′30″W / 51.1272°N 2.9917°W |
Grid reference | ST307369 |
Operations | |
Station code | BWT |
Managed by | First Great Western |
Number of platforms | 2 |
Live arrivals/departures and station information from National Rail Enquiries | |
Annual rail passenger usage* | |
2002/03 | 0.136 million |
2004/05 | 0.167 million |
2005/06 | 0.182 million |
2006/07 | 0.200 million |
2007/08 | 0.233 million |
2008/09 | 0.242 million |
2009/10 | 0.238 million |
2010/11 | 0.265 million |
2011/12 | 0.287 million |
History | |
Original company | Bristol and Exeter Railway |
Pre-grouping | Great Western Railway |
Post-grouping | Great Western Railway |
1841 | Opened |
National Rail – UK railway stations | |
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Bridgwater from Office of Rail Regulation statistics. Methodology may vary year on year. | |
UK Railways portal |
Bridgwater railway station serves Bridgwater in Somerset, England. It is on the Bristol to Taunton Line and is operated by First Great Western. Originally built to the designs of Isambard Kingdom Brunel, the station is now a Grade II* listed building.[1]
History
The railway arrived at Bridgwater on 14 June 1841 when the Bristol and Exeter Railway opened its line. This was the terminus of the line for a year while the Somerset Bridge was constructed over the River Parrett; the line was extended to Taunton on 1 June 1842.[2]
During the period that the station was a terminus it became a focus for horse-drawn coaches that met the trains and carried their passengers onwards. An accident happened when one of these was overturned on the level crossing that was situated at the south end of the platforms, although the only serious injury was a bystander who broke an ankle – the coach driver and passengers were largely unscathed. An hotel was built just outside the station entrance which has since been demolished, but the houses provided for the company's staff can still be seen.
The Bristol and Exeter Railway was initially operated by the Great Western Railway but from 1 May 1849 the company operated its own trains. Coke ovens, to provide fuel for the locomotives, and workshops to build and maintain the carriages and wagons, were built to the west of the line between Bridgwater station and the river – this is the nearest station to the halfway point on the line. They closed following a fire on 25 August 1947,[3] although by this time they were only repairing wagon sheets (i.e. canvas covers). Other local industries linked with the railway were John Browne's Brick and Tile Works, which were owned by a director of the railway and supplied materials to the Great Western and associated companies; and George Hennet's iron works (later Bridgwater Engineering Company) which made track, signals and wagons for several different companies including atmospheric railway pipes for the South Devon Railway Company.
The station was improved on several occasions, such as 1882 when new roofs and a footbridge were provided. An engine shed was provided outside the carriage works in 1893.
A new connection was provided to the west of the line half a mile north of the station on 16 June 1935 to allow access to the private siding of the British Cellophane Company siding. Initially shunted by little 0-4-0ST steam locomotives, from 1969 it was home to ex-British Rail Class 03 diesel locomotive D2133. The siding was in use for nearly 70 years but has now been disconnected.
Following the nationalisation of the railways in 1948 stations in many towns were renamed to avoid confusion, and this station became Bridgwater Central on 26 September 1949 for a few years to distinguish it from "Bridgwater North", the former Somerset and Dorset Joint Railway terminus.[4]
The engine shed closed in July 1960, following which shunting locomotives were brought up from Taunton as required. Goods traffic at the station was withdrawn from November 1965 and, following the closure of the docks branch and Dunball Wharf in 1967, the goods yard was rationalised. Most of the sidings that served the former carriage works at the south end of the station were taken out of use by 1969.
The station buildings have survived and are kept in reasonable repair. The booking office, although modernised, retains a rare early ticket counter.
Description
The main entrance is on the town side of the station and the platform served by trains towards Bristol. Access to the platform for trains towards Taunton is by a footbridge.
To the north of the platforms is the goods yard on the wast side of the line.[5] The only regular goods trains to call are the Direct Rail Services trains that collect nuclear waste from Hinkley Point nuclear power station. The loading facilities for these nuclear flasks are in a secure compound on the stub of the old docks branch line. Another siding serves a warehouse but this has seen little traffic in recent years.
Services
The station and all passenger services are operated by First Great Western. The basic service pattern comprises one train in each direction each hour between Cardiff Central and Taunton. A few peak services to and from London Paddington also call. Regular CrossCountry pass through the station, but none stop.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Highbridge and Burnham | First Great Western Bristol to Taunton Line |
Taunton |
Docks branch
Bridgwater
|
| ||||||||||||
|
to Highbridge | ||||||||||||
|
River Parrett | ||||||||||||
|
ROF Bridgwater | ||||||||||||
|
|
||||||||||||
|
Dunballdown line | |||||||||||
|
Cement & Lime works | |||||||||||
|
Dunball Wharf sidings | |||||||||||
|
King's Sedgemoor Drain | |||||||||||
|
Dunballup line | |||||||||||
|
|
||||||||||||||
|
| |||||||||||||
|
||||||||||||||
|
British Cellophane | |||||||||||||
|
Bridgwater Spinx Cement Works | |||||||||||||
|
S&DJR wharf sidings | |||||||||||||
|
Bridgwater(S&DJR)
| |||||||||||||
|
Bridgwater Goods(GWR) | |||||||||||||
|
Taunton and Bridgwater Canal | |||||||||||||
|
Bridgwater(GWR) | |||||||||||||
|
Carriage works | |||||||||||||
|
to Taunton | |||||||||||||
|
| |||||||||||||
|
| |||||||||||||
1. Bridgwater Docks
|
The Bristol and Exeter Railway Act had allowed for a branch to the river at Bridgwater but this was never constructed. Instead, the Corporation of Bridgwater built a tramway from the station to wharves (later known as Clink Yard) on the north side of the River Parrett; this was opened in 1845 and worked by horses. It crossed both the busy Bristol Road and Church Street on level crossings.[2]
The railway took over the tramway in 1859 and rebuilt it for locomotive operation in 1867. In March 1871 it was extended across the river to Bridgwater Docks, which formed the entrance to the Bridgwater and Taunton Canal and was owned by the railway company. The bridge was of an unusual design that had to move to allow ships to pass upstream at high tide; first part of the bridge was rolled aside and then the remaining section was pulled clear into the space vacated by the first.
On 27 June 1954 a new connection was made from Clink Yard to the former Somerset and Dorset Joint Railway station to allow goods traffic to reach that station following the closure of that line's Bridgwater branch.
The branch was closed on 2 January 1967. The Parrett Bridge is still in position and serves as a footbridge but no longer moves. One of the last steam locomotives from the branch, ex-Cardiff Railway 0-4-0ST 1338 was taken to Bleadon and Uphill railway station for preservation but, following the closure of the museum there, has now been moved to the Didcot Railway Centre.
Somerset Bridge
On the southern edge of Bridgwater the railway had to cross the River Parrett, which was still a navigable river in those days. Isambard Kingdom Brunel designed a brick bridge with a 100 feet (30 m) span but a rise of just 12 feet (3.7 m), this was flatter than his infamous Maidenhead Railway Bridge across the River Thames.
Work started in 1838 and was completed in 1841. Brunel left the centering scaffold in place as the foundations were still settling but was forced to remove it in 1843 to reopen the river for navigation. He demolished the brick arch and had it replaced with a timber arch within six months, without interrupting the traffic on the railway. This was in turn replaced in 1904 by a steel girder bridge.[2]
References
Wikimedia Commons has media related to Bridgwater railway station. |
- ↑ "Bridgwater Railway Station". Listed Buildings Online. Retrieved 2010-02-28.(registration required)
- ↑ 2.0 2.1 2.2 MacDermot, E T (1931). History of the Great Western Railway, volume II 1863-1921. London: Great Western Railway.
- ↑ Maggs, Colin G (1991). Taunton Steam. Bath: Millstream Books. ISBN 0-948975-26-1.
- ↑ Oakley, Mike (2006). Somerset Railway Stations. Bristol: Redcliffe Press. ISBN 1-904537-54-5.
- ↑ Cooke, RA (1979). Track Layout Diagrams of the GWR and BR WR, Section 16: West Somerset. Harwell: RA Cooke.
|
|