Berkley–Dighton Bridge (1896)

From Wikipedia, the free encyclopedia
Berkley-Dighton Bridge

The 1896 bridge near the end of its useful life
Carries vehicular and pedestrian traffic
Crosses Taunton River
Locale Berkley and Dighton, Massachusetts
Design swing bridge
Width 21.3 feet (6.5 m)
Load limit 3 short tons (2.7 t)
Clearance below 7 feet (2.1 m)
Construction end 1896
Opened 1896
Preceded by Weir St. Bridge
Followed by Veterans Memorial Bridge
Closed 2010
Coordinates 41°50′05.83″N 71°06′29.28″W / 41.8349528°N 71.1081333°W / 41.8349528; -71.1081333Coordinates: 41°50′05.83″N 71°06′29.28″W / 41.8349528°N 71.1081333°W / 41.8349528; -71.1081333
Truss detail showing deterioration
West portal showing traffic light

The third Berkley–Dighton Bridge was a paved one-lane swing-span bridge connecting the towns of Berkley and Dighton, Massachusetts. Built in 1896, it was the third at that location, and was demolished in September and October 2010.

Bridges at this location are the only crossing over the Taunton River between the Veterans Memorial Bridge in Fall River and the Weir Street Bridge in Taunton.

Since August 2010, a temporary bridge has been in use while the replacement bridge is built.

History

The first bridge at the site was built in 1801. There was no bridge on the site from 1853 to 1873.

The third bridge was dedicated in 1896 with Luther Dean as the engineer, substructure built by Beattie and Wilcox of Fall River, Massachusetts, and superstructure built by R.F. Hawkins of Springfield, Massachusetts.

At one time, the bridge had two traffic lanes. However, the deterioration of the structure reduced the bridge's weight-bearing capacity, and traffic flow was restricted to one lane. Traffic over the bridge was controlled by traffic signals on each side, which alternately allowed eastbound and westbound traffic to use the single lane. The road approaching the bridge from Dighton (eastbound) is known as Center Street; approaching from Berkley (westbound) it is known as Elm Street.

The 1896 bridge was 21.3 feet (6.5 m) wide, and stood seven feet above mean high tide. It had a posted weight limit of 3 short tons (2.7 t) at the end of its useful life.[1]

Proposals to replace the bridge were discussed for many years, starting no later than 1975. The Massachusetts Highway Department (MHD) is now replacing the Berkley–Dighton Bridge because it was seriously structurally deficient, its gears often jamming in the open position, forcing travelers miles to the north or south, and the inability for the bridge to handle emergency vehicles. The MHD estimates (2001 data) that 6,200 cars crossed the bridge each day. Bridge upgrade plans met with opposition for a variety of reasons, particularly concerns about the impact on local traffic. Commercial trucks were not allowed to use this bridge. Also, the traffic lights were only triggered by cars stopping on a line in the road. This was very problematic for people not familiar with the bridge.

Opening the bridge

The towns of Dighton and Berkley paid a bridge tender to open the bridge as needed. Originally, the bridge was opened with a giant crank. The Dighton highway department installed a motor in the 1960s, though a tender was still required to grease the gears, unlock the bridge, remove some pins, and pull some switches to operate the mechanism.

New bridge

The replacement bridge will be a fixed structure, consisting of four pre-cast arch spans with closed spandrel walls of cast-in-place concrete, with approximately the same footprint as the previous bridge, using pile-supported abutments and piers. The finished bridge will be made such that it will appear to be constructed of stone masonry rather than concrete. The two end spans will be 74 feet (23 m) and the two center spans will be 92 feet (28 m) for a total bridge length of approximately 350 feet (110 m).[2][3]

It will be widened a total of approximately 12 feet (3.7 m), split between both sides of the existing bridge, for a total of 32 feet (9.8 m) defined as two traffic lanes plus a 5.5-foot (1.7 m) sidewalk on the south side of the bridge, similar to the existing bridge. A minimum of 12-foot (3.7 m) vertical clearance must be maintained from the mean high water line at the main span, requiring the roadway to be raised approximately 8.25 feet (2.51 m) higher than its current level. Other improvements include ADA-compliant sidewalks, wheelchair ramps, and driveway transitions, as well as better drainage, curbing, signage, guardrail, and pavement markings.[2]

See also

External links

References

  1. See posted limits on site
  2. 2.0 2.1 Anderson, David R. (Acting Chief Engineer) (2007-09-18). Design Public Hearing at Dighton-Rehoboth Regional High School on Tuesday, September 18, 2007 for the proposed replacement of the Elm Street/Center Street Bridge (no. B-08-001=D-08-11) over Taunton River (Berkley-Dighton Bridge) in the Towns of Berkley and Dighton (pdf). MassHighway. 
  3. MassHighway district 5. "BERKLEY-DIGHTON- BRIDGE REPLACEMENT, B-08-001=D-08-011, ELM STREET (BERKLEY) CENTER STREET (DIGHTON) OVER THE TAUNTON RIVER". Retrieved 2008-12-05. 
This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.