Beijing–Shijiazhuang High-Speed Railway

From Wikipedia, the free encyclopedia

Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway
Beijing–Shijiazhuang Section
京广深港高速铁路京石段
Overview
Type High-speed rail
Status operational
Locale China
Termini Beijing West Railway Station
Shijiazhuang Railway Station
Operation
Opening December 26, 2012
Operator(s) China Railway High-speed
Technical
Line length 281 km (175 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 50 Hz, 25,000 V

Beijing–Shijiazhuang High-Speed Railway (simplified Chinese: 京石客运专线; traditional Chinese: 京石客運專線; pinyin: Jīng-Shí Kèyùn Zhuān Xiàn) is a 281-kilometre high-speed rail line between Beijing and Shijiazhuang in China opened on 26 December 2012 after 4 years of construction.[1] The total investment is 43.87 billion yuan.[2] The design speed is 350 km/h, and the opening cut travel times between Beijing and Shijiazhuang from 2 hours to about 1 hour. This railway is the northern section of the 2100 km high-speed Jinggang line connecting Beijing and Guangzhou, but also speeds up trains between Beijing and Taiyuan, which continue on the Shitai Passenger Railway.

References

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.