Sumed pipeline

Sumed pipeline
Location
Country Egypt
General direction South–north
From Ain Sukhna terminal
To Sidi Kerir
Runs alongside Suez Canal
General information
Type Oil
Partners EGPC, Saudi Aramco, IPIC, three Kuwaiti companies, QGPC
Operator Arab Petroleum Pipeline Company (Sumed Company)
Commissioned 1977
Technical information
Length 320 km (200 mi)
Maximum discharge 2.5 million barrels per day (400×10^3 m3/d)

The Sumed pipeline (also known as Suez-Mediterranean pipeline) is an oil pipeline in Egypt, running from the Ain Sukhna terminal on the Gulf of Suez to offshore Sidi Kerir, Alexandria[1] on the Mediterranean Sea. It provides an alternative to the Suez Canal for transporting oil from the Persian Gulf region to the Mediterranean.

Contents

History

The project for an oil pipeline from the Red Sea to the Mediterranean commenced after the extended closure of the Suez Canal in June 1967.[2] Establishment of the pipeline company was agreed in 1973 between five Arab governments.[3] The Sumed pipeline was opened in 1977.[4][5]

Technical description

The Sumed pipeline is 320 kilometres (200 mi) long. It consists of two parallel lines of 42 inches (1,070 mm) diameter. Its capacity is 2.5 million barrels per day (400×10^3 m3/d).[5] In 2009 it carried 1.1 million barrels per day (170×10^3 m3/d).[6]

Operator

The pipeline is owned by the Arab Petroleum Pipeline Company/Sumed Company, a joint venture of EGPC (50%, Egypt), Saudi Aramco (15%, Saudi Arabia), IPIC (15%, the United Arab Emirates), three Kuwaiti companies (each of 5%), and QGPC (5%, Qatar).

Proposed extension

An extension of the Sumed is being considered. The proposed extension would traverse the Red Sea from Ain Sukhna to the Saudi coast near Sharm al Sheikh, and from there to the terminal of Saudi Arabia's main east-west pipeline in Yanbu.

References

External links