Sardar Sarovar Dam

Sardar Sarovar Dam

The Sardar Sarovar Dam,
partially completed in August 2008
Official name The Sardar Sarovar Dam
Location Navagam, Gujarat
Construction began 1964
Dam and spillways
Type of dam Concrete gravity dam
Height

Design Full reservoir level (FRL): 138 m (453 ft)

Maximum water level: 146.5 m (481 ft)
Length 1,210 m (3,970 ft)
Base width 100 m (330 ft)
Impounds Narmada River
Spillway capacity 84,949 m3/s (2,999,900 cu ft/s)
Reservoir
Capacity 4,700,000 acre feet (5.8 km3)
Catchment area 88,000 km2 (34,000 sq mi)
Surface area 375.33 km2 (144.92 sq mi)
Power station
Owner(s) Narmada Control Authority
Operator(s) Sardar Sarovar Narmada Nigam Limited
Commission date June, 2006
Installed capacity 1,450 MW (River bed power house-1200 MW, Canal head power house-250 MW)[1]
Maximum capacity Firm power: 439 MW
Website
Sardar Sarovar Dam

The Sardar Sarovar Dam is a dam on the Narmada River near Navagam, Gujarat, India. It is the largest dam and part of the Narmada Valley Project, a large hydraulic engineering project involving the construction of a series of large irrigation and hydroelectric multi purpose dams on the Narmada River. The project took form in 1979 as part of a development scheme to increase irrigation and produce hydroelectricity.

It is the 30th largest dams planned on river Narmada, Sardar Sarovar Dam (SSD) is the largest structure to be built. It has a proposed final height of 136.5 m (448 ft). The project will irrigate more than 18,000 km2 (6,900 sq mi), most of it in drought prone areas of Kutch and Saurashtra. Critics maintain that its negative environmental impacts outweigh its benefits. It has created discord between its government planners and the citizens group Narmada Bachao Andolan.

Contents

Controversy

Protest

The dam is one of India's most controversial dam projects and its environmental impact and net costs and benefits are widely debated. The World Bank was initially a funder of the SSD, but withdrew in 1994. The Narmada Dam has been the centre of controversy and protest since the late 1980s.[2]

One such protest takes center stage in the Spanner films documentary Drowned Out (2002), which follows one tribal family who decide to stay at home and drown rather than make way for the Narmada Dam.[3] An earlier documentary film is called A Narmada Diary (1995) by Anand Patwardhan and Simantini Dhuru. The efforts of NBA to seek social and environmental justice for those most directly affected by the Sardar Sarover Dam construction feature prominently in this award winning film (Filmfare Award for Best Documentary-1996).[4]

The figurehead of much of the protest is Medha Patkar, the leader of the "Narmada Bachao Andolan," the "Save Narmada Movement."[5] The movement was cemented in 1989, and was awarded the Right Livelihood Award in 1991.[6]

Support for the protests also came from Indian author Arundhati Roy, who wrote the extended essay "The Greater Common Good" in protest of the Narmada Dam Project;[7] the essay was reprinted in her book The Cost of Living. In that essay, Roy states:

Big Dams are to a Nation's 'Development' what Nuclear Bombs are to its Military Arsenal. They're both weapons of mass destruction. They're both weapons Governments use to control their own people. Both Twentieth Century emblems that mark a point in time when human intelligence has outstripped its own instinct for survival. They're both malignant indications of civilisation turning upon itself. They represent the severing of the link, not just the link - the understanding - between human beings and the planet they live on. They scramble the intelligence that connects eggs to hens, milk to cows, food to forests, water to rivers, air to life and the earth to human existence.

Height issues

The Supreme Court decision

Despite popular protest, the Supreme Court gave clearance for the height to be increased to 121.92 m (400 ft), but in the same judgment Mr. Justice Bharucha gave directions to Madhya Pradesh and Maharashtra (the Grievance Redressal Authorities of Gujarat) that before further construction begins, they should certify (after inspection) that all those displaced by the raise in height of 5 metres have already been satisfactorily rehabilitated, and also that suitable vacant land for rehabilitating them is already in the possession of the respective States. This process shall be repeated for every successive five metre increase in height.

Report of the Ministry of Environment and Forests (MoEF)

The Second Interim Report of the Experts' Committee set up by the Ministry of Environment and Forests (MoEF) of the Government of India to assess the planning and implementation of environmental safeguards with respect to the Sardar Sarovar (SSP) and Indira Sagar projects (ISP) on the Narmada River. It is a clear finding of the egregious failure of the government machinery on virtually all the aspects studied.

The report covers the status of compliances on catchment area treatment (CAT), flora and fauna and carrying capacity upstream, command area development (CAD), compensatory afforestation and human health aspects in project impact areas. The report is a severe indictment of the governments of Gujarat, Madhya Pradesh and Maharashtra and of the bodies set up by these governments to implement the projects for the ‘integrated development' of the Narmada Valley. The report is peppered with phrases like ‘gross violation', ‘negligence', ‘highly unsatisfactory,' ‘inadequate,' ‘serious lapse' and ‘non compliance'.

It states in strong and unequivocal terms that, with respect to virtually all of the aspects under consideration, compliance is either highly inadequate or absent altogether. A partial exception is compensatory afforestation. Construction, on the other hand, has been proceeding apace: the ISP is complete and the SSP nearing completion. The report recommends that no further reservoir-filling be done at either SSP or ISP; that no further work be done on canal construction; and that even irrigation from the existing network be stopped forthwith until failures of compliance on the various environmental parameters have been fully remedied.[9]

Projected benefits

The benefits of the dam as listed in the Judgement of Supreme Court of India in 2000 were:

"The argument in favour of the Sardar Sarovar Project is that the benefits are so large that they substantially outweigh the costs of the immediate human and environmental disruption. Without the dam, the long term costs for people would be much greater and lack of an income source for future generations would put increasing pressure on the environment. If the waters of the Narmada river continuous to flow to the sea unused there appears to be no alternative to escalating human deprivation, particularly in the dry areas of Gujarat.

The project has the potential to feed as many as 20 million people, provide domestic and industrial water for about 30 million, employ about 1 million, and provide valuable peak electric power in an area with high unmet power demand (farm pumps often get only a few hours power per day). In addition, recent research shows substantial economic multiplier effects (investment and employment triggered by development) from irrigation development. Set against the futures of about 70,000 project affected people, even without the multiplier effect, the ratio of beneficiaries to affected persons is well over 100:1."[10]

The dam will irrigate 17,920 km2 (6,920 sq mi) of land spread over 12 districts, 62 talukas and 3393 villages (75% of which is drought-prone areas) in Gujarat and 730 km2 (280 sq mi) in the arid areas of Barmer and Jalore districts of Rajasthan. The dam will also provide flood protection to riverine reaches measuring 30,000 ha (74,000 acres) covering 210 villages and Bharuch city and a population of 400,000 in Gujarat.[1]

Solar power generation

Government of Gujarat plans to generate solar power from placing solar panels over the canal making it beneficial for the villages around to get power and also helping to reduce the evaporation of precious water. The first phase consists of covering 25 km to generate 25MW of power.[11]

References

  1. ^ a b "Main Features of the Dam". supportnarmadadam.org. http://www.supportnarmadadam.org/features-narmada-canal-india.htm. Retrieved 15 April 2010. 
  2. ^ Scudder T. (2003) (SSP), Unpublished Manuscript, retrieved 7/9/2007 India’s Sardar Sarovar Project
  3. ^ http://tv.oneworld.net/2009/07/28/drowned-out-the-first-10-mintues/ The first 10 minutes of Drowned Out on OneWorldTV
  4. ^ "A Narmada Diary". http://www.frif.com/cat97/k-o/a_narmad.html. Retrieved 2008-06-13. 
  5. ^ Friends of River Narmada, retrieved 7/9/2007 The Sardar Sarovar Dam: a Brief Introduction
  6. ^ In an opinion piece in The Guardian, the campaign led by the NBA activists was accused of holding up the project's completion, even of physically attacking on local people who accepted compensation for moving.Kirk Leech (3 March 2009). "The Narmada dambusters are wrong". The Guardian. http://www.guardian.co.uk/commentisfree/2009/mar/03/india-narmada-dams. Retrieved 2009-03-04. 
  7. ^ Roy, Arundhati (April 1999). "The Greater Common Good". Friends of River Narmada. http://www.narmada.org/gcg/gcg.html. Retrieved 2009-05-29. 
  8. ^ Go-ahead for India dam project
  9. ^ "A damaging report". The Hindu (Chennai: "Kasturi & Sons Ltd). 2010-04-31. http://www.hindu.com/2010/03/31/stories/2010033153791100.htm. Retrieved 15 April 2010. 
  10. ^ Judgement of the Supreme Court of India 2000
  11. ^ Soon, solar power panels on Narmada canal: Narendra Modi