Metro Light Rail | |||
---|---|---|---|
Overview | |||
Type | Light rail | ||
System | Metro Light Rail | ||
Locale | Phoenix-Tempe-Mesa, Arizona, United States | ||
Termini | Christown Station (19th Ave./Montebello) Tri-City, Mesa (Sycamore/Main) |
||
Stations | 32 (28 if eastbound- and westbound-only stations are combined) | ||
Services | 1 | ||
Daily ridership | 38,700 (2Q 2011)[1] | ||
Operation | |||
Opened | December 27, 2008 | ||
Owner | Valley Metro (Phoenix) | ||
Operator(s) | Valley Metro | ||
Rolling stock | Kinki Sharyo | ||
Technical | |||
Line length | 20 mi (32 km) | ||
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) (standard gauge) | ||
Electrification | Overhead catenary 750V | ||
|
METRO System Diagram | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend
|
Metro Light Rail (styled corporately as METRO) is a 32 km (20 mi.) light rail line operating in the U.S. state of Arizona. Part of the Valley Metro public transit system, it serves the cities of Phoenix, Tempe, and Mesa. Construction began in March 2005; operation started December 27, 2008. The line has 2011 estimated daily ridership of 38,700, making it the 13th busiest light rail system in the country.[1]
Contents |
The expected construction cost for the initial 20 miles is $1.4 billion, or $70 million per mile.[2] Metro estimates the train will cost the city $184 million to operate over the next five years with fares covering $44 million of the operation costs and tax subsidies covering the remaining costs.[3]
Trains operate on city streets in a "center reservation," similar to the Red Line of the METRO light rail system in Houston, the surface sections of the Green Line in Boston, and some surface sections of the Muni Metro in San Francisco. Some parts of the line, such as the bridge over Tempe Town Lake (near State Route 202), have no contact with other traffic. The vehicles used are rated for a maximum speed of 55 mph, and have complete the 20 mile route in 65 minutes, including station stops.[4] An equivalent section of the Red Line bus route that the rail line replaced was scheduled for 80 minutes, and was subject to traffic delays during rush hour.[5] The system is powered by an overhead catenary that supplies power at 750V (page 5)
Various plans preceded the current implementation of light rail. The Phoenix Street Railway provided streetcar service from 1887 to 1948. Historic vehicles may be seen at the Arizona Street Railway Museum, with Car #116 celebrating her 80th birthday on 25 December 2008, just days before the opening of modern rail service. In 1989, the ValTrans elevated rail proposal,[6] was turned down by voters in a referendum due to cost and feasibility concerns. Other subsequent initiatives during the 1990s failed over similar reasons.
Metro was created by the Transit 2000 Regional Transportation Plan (RTP), which involved a 0.5 per cent sales tax and was approved by voters in Phoenix in 2000. Transit 2000 aimed at improving the local bus service (considered unacceptably inadequate compared to other major US cities) and the formation of bus rapid transit and light rail, among other things, which was seen as a more affordable approach. It used the route placing and color designations from the 1989 plan.
In March 2008, cracks in the system's rails were discovered. The cause of the cracks was determined to be improper use of plasma cutting torches by contractors.[7] The affected track was repaired by May at a cost of $600,000 with still no word on which parties will be held financially responsible.[8] The last of the concrete and rail for the system was installed in the end of April, with CEO declaring the system to be on time and on budget.[9]
There are 28 stations on the initial twenty-mile starter segment. The line celebrated its grand opening December 27, 2008, with official ribbon-cutting ceremonies and community celebrations spread throughout Phoenix, Tempe, and Mesa. The event was produced by Arizona's Entertainment Solutions, Inc.[10] and was attended by thousands of local residents who waited as long as an hour or more to ride the vehicles.[11][12] The stations have been designed to complement their immediate surroundings.[13] Station platform areas are approximately 16 feet (4.9 m) wide by 300 feet (91 m) long.
As of early March 2010, with ridership far exceeding first-year projections, income was close to meeting Metro's stated goal of 25% farebox recovery. With sales tax and other revenue decreasing, Metro is contemplating a variety of service changes, including shorter hours and slightly longer headways, to close the budget gap.[14]
Valley Metro had its busiest month in September 2011, with a weekday ridership of 47,818. On the 9th of September, 2011, they saw 60,437 board the light rail thanks to fans attending games to see the Arizona State University Sun Devils and the Arizona Diamondbacks.[15]
Metro Light Rail uses a proof-of-payment system. Tickets can be purchased at ticket vending machines at the entrance to all stations and must be validated before boarding the train. Effective July 1, 2009 , the fares are as follows:
Children younger than 5 years of age ride free. Weekly and monthly passes are also available in addition to the fares listed above.[16]
The Valley Metro Rail Northwest Extension is one of the first extensions planned. Engineering has already begun on this 4-mile (6.4 km) route from the current terminus at Bethany Home Road (METRO calls the station, "Montebello Avenue and 19th Avenue") north on 19th Avenue to Dunlap Road, and eventually west to Metrocenter Mall. Utility relocation, right-of-way acquisition, and construction will be from Spring 2009-2011. The project should be ready by late 2012.[17]
The Maricopa Association of Governments (MAG) and the Arizona Department of Transportation are studying suburban commuter rail as a complement to light rail.[18] The MAG Commuter Rail Strategic Plan was released in March 2008.[19][20] In April 2008, a coalition of Arizona business and political leaders, including Governor Janet Napolitano, proposed a $42 billion state transit plan which would include commuter rail.[21] Commuter rail generally uses upgraded existing freight rail lines, with stations every three to five miles (8 km). In Phoenix, as in other areas that have implemented commuter rail, track speeds would be increased, signals updated, and additional sidings and double-track added. Proposals for constructing entirely new rail rights-of-way in the middle of urban highways have largely been eliminated due to their expense and their location far beyond walking distance from downtowns and activity centers.
Contemporary discussion of commuter rail in Phoenix began with the "Hattie B." flood relief train of 1980,[22][23] and was first widely promoted in 1991 by the Arizona Rail Passenger Association.[24]
Daily rail service had existed until the 1960s between Phoenix, Glendale, and Wickenburg as well as Tempe and Mesa. A single short commuter rail line was also part of the ValTrans proposal.
|