Maneri Dam

Maneri Dam
Location of Maneri Dam
Country India
Location Uttarkashi
Coordinates
Status Operational
Owner(s) Uttarakhand Jal Vidyut Nigam Limited
Dam and spillways
Type of dam Gravity
Height 39 m (128 ft)
Length 127 m (417 ft)
Volume 13,700 m3 (17,919 cu yd)
Impounds Bhagirathi River
Spillway capacity 5,000 m3/s (176,573 cu ft/s)
Reservoir
Capacity 600,000 m3 (486 acre·ft)
Active capacity 510,000 m3 (413 acre·ft)
Surface area 1.8 km2 (1 sq mi)
Power station
Commission date 1984
Turbines 3 x 30 MW Francis-type
Installed capacity 90 MW

The Maneri Dam is a concrete gravity dam on the Bhagirathi River located at Maneri, 8.5 km (5 mi) east of Uttarkashi in Uttarkashi district, Uttarakhand, India. The primary purpose of the dam is to divert water into a tunnel which feeds the 90 MW run-of-the-river Tiloth Power Plant.

Contents

Background

The power station is stage one of the Maneri Bhali Hydroelectric Project which was planned in the 1960s. It was completed and commissioned in 1984. Dharasu Power Station, the second stage, was halted in 1990 due to funding issues and was not restarted until 2002.[1] It was eventually completed and commissioned by 2008.[2]

Design and operation

The Maneri Dam is a 39 m (128 ft) tall and 127 m (417 ft) wide gravity dam with a structural volume of 13,700 m3 (17,919 cu yd). It's spillway is located on its crest and is controlled by four tainter gates. In addition to discharge tunnel, the spillway has a maximum discharge capacity of 5,000 m3/s (176,573 cu ft/s). The dam's reservoir has a 600,000 m3 (486 acre·ft) capacity, of which 510,000 m3 (413 acre·ft) is active (or "useful") capacity.[3] Water supplied to the power station is first diverted from the Bhagirathi River by the dam into a 8.6 km (5 mi) long tunnel directly behind the dam. The difference in elevation between the barrage and the power station affords a design hydraulic head of 147.5 m (484 ft) and gross head of 180 m (591 ft). Near the Tiloth Power Plant at , the tunnel splits into three penstocks to power each of the three 30 MW Francis turbine-generators before being discharged back into the river. The design discharge of the power station is 71.4 m3/s (2,521 cu ft/s).[4]