Kristiansund Mainland Connection

The Kristiansund Mainland Connection (Norwegian: Kristiansund fastlandsforbindelse or abbreviated Krifast) is a road system on the highways E39 and 70 that connects the municipality of Kristiansund to the islands of Frei, Bergsøya, and Aspøya to mainland Norway. Krifast opened in 1992 and consists of 25 kilometres (16 mi) of road and 6 kilometres (3.7 mi) of bicycle paths. The three main structures are the undersea Freifjord Tunnel, the Gjemnessund Bridge, and the Bergsøysund Bridge.[1]

A total of seven bridges are part of the Krifast system, the most famous one being the suspension bridge Gjemnessund Bridge from the island of Bergsøya to the mainland of Gjemnes, with 108-metre (354 ft) high towers and a span between them of 623 metres (2,044 ft). There is also the 933-metre (3,061 ft) long pontoon bridge called the Bergsøysund Bridge which goes from Bergsøya to Aspøya, which is the only bridge of its kind where nothing but the ends are anchored to solid rock. The bridge is supported by 7 pontoons, floating on a 320-metre (1,050 ft) deep fjord.

The 5.1-kilometre (3.2 mi) long underwater Freifjord Tunnel goes under the Freifjorden. It is 134 metres (440 ft) below sea level at its deepest, though the bottom 35 metres (115 ft) is in solid rock. A drive through the tunnel takes about 5 minutes. Because of the relatively steep climb, there are three lanes at each end, but only two at the bottom.

Krifast was authorized by the Norwegian Parliament and construction began in October 1988. The government pledged to finance 39% of the expenses, the rest were to be taken in as toll on road traffic and car ferry fares (on the ferries to be discontinued due to the new tunnel and bridges). As of July 1991, the project employed 427 people, and spent NOK 2 million daily on construction. Four years and NOK 1.1 billion later, in August 1992, Krifast was opened for regular traffic.[2]

See also

References