Interstate 781

Interstate 781
Route information
Maintained by NYSDOT
Length: 4.9 mi[2] (7.9 km)
History: Under construction; projected to be completed in mid-2012[1]
Major junctions
West end: I-81 in Pamelia
  US 11 in Le Ray
East end: Fort Drum main gate in Le Ray
Highway system

Auxiliary route of the Interstate Highway System
Main • Auxiliary • Business

Numbered highways in New York
Interstate • U.S. • N.Y. (former) • Reference • County

NY 747 I-787

Interstate 781 (I-781) is a future auxiliary Interstate Highway that is under construction north of Watertown in Jefferson County, New York, in the United States. When complete, the route will extend for 4.9 miles (7.9 km) from I-81 in Pamelia to the main entrance of Fort Drum in Le Ray. It will also have one intermediate interchange with U.S. Route 11 (US 11) just west of Fort Drum. I-781 will be four lanes wide and is expected to serve as the principal travel corridor into and out of the fort.

The original designation for I-781 was New York State Route 781 (NY 781). On April 13, 2009, the Federal Highway Administration (FHWA) designated NY 781 as a future Interstate Highway corridor and as "Future I-781". The I-781 designation will not officially take effect until the highway is complete.

Contents

Route description

I-781 will begin at a new interchange with I-81 located 0.7 miles (1.1 km) north of exit 48 (NY 342) in the town of Pamelia. It will proceed to the east, roughly paralleling NY 342 as it heads toward Fort Drum. I-781 will have one intermediate interchange with US 11 just west of Fort Drum before it terminates at Fort Drum's main gate. The highway will be four lanes wide, with two lanes for each direction.[2]

History

Origins and funding

By 2003, the New York State Department of Transportation (NYSDOT) had begun to evaluate potential ways to improve Fort Drum's access to I-81. Three alternatives were considered: the construction a new highway that would run north of NY 342 and directly connect I-81 to the main gate of Fort Drum; the construction of a new route to the south of NY 342 that would link I-81 to US 11 southwest of the fort's main gate; and improving the existing NY 342.[2] In November 2005, NYSDOT officials announced that the southern route had been chosen and that it would cost $64 million to construct. However, just two months later, NYSDOT announced that they now favored the northern alignment after receiving input from area residents and the United States Army. According to NYSDOT Commissioner Thomas Madison, the new alignment would have less of a negative impact on future development around Fort Drum and cost $7 million less to construct.[3][4]

The proposed highway was initially designated as NY 781 by NYSDOT.[5] On February 11, 2008, NYSDOT submitted an application to the American Association of State Highway and Transportation Officials requesting that NY 781 be designated as Interstate 781. The FHWA designated NY 781 as a future Interstate Highway corridor on April 13, 2009; however, the I-781 designation was not officially assigned at this time as per United States Code an Interstate Highway designation can only be assigned to a completed highway built to Interstate Highway standards. As a result, FHWA stipulated that the highway can only be referred to as "Future I-781" until I-781 is completed and the designation is officially assigned.[2]

The project received $724,000 in funding from the United States Department of Transportation (USDOT) in June 2008.[6] Another $1.425 million was granted by USDOT in January 2010.[7] The project had been nominated to receive $95 million in funding through the Transportation Investment Generating Economic Recovery grant program; however, the application was rejected in February 2010.[8] NYSDOT officials had seen the funding as a way to free up money for other projects in the area rather than funding that was necessary to construct I-781.[9] Much of the project—projected to cost between $106 million and $113 million—will be funded through several state and local sources, with at least $16.6 million coming from NYSDOT.[7][8]

Construction

In April 2009, project engineers discovered that Indiana bats—an endangered species of bat—live in the area in and surrounding the proposed right-of-way of the Fort Drum Connector (I-781). As a result, several concessions were made, including clearing trees during the winter season while the bats are hibernating in caves, purchasing and setting aside land to replace those lands lost during construction, and leaving trees in the 40 feet (12 m) to 50 feet (15 m) of land alongside the highway that would typically be cleared to serve as embankments. The last of the three changes will preserve 21 acres (8 ha) of forest. NYSDOT will install guardrails along the length of I-781 to make up for the narrower shoulders.[10][11] The site preparation contract—which included the clearing of trees along the proposed I-781 right-of-way—was awarded to The Delaney Group on December 26, 2009. Work on this portion of the project took place from February 2010 to May 31, 2010, and cost $722,000.[12]

NYSDOT had originally planned on opening the bidding process for the construction of I-781 itself on April 1, 2010;[7] however, the date was pushed back to May 6 due to the lack of an approved state budget.[12] The state previously had plans to award the contract as early as December 2009; however, the earlier date was conditional on the allocation of enough funds for the project by that time.[13] On July 20, NYSDOT announced that a $56.5 million contract was let to Lancaster Development of Richmondville to construct the freeway. Work on the highway began the week of July 20[1] and a formal groundbreaking ceremony was held on August 4.[14] Total completion of the project is slated for August 2012.[7]

Exit list

The entire route is in Jefferson County.

Location Mile[2] Destinations Notes
Pamelia 0.0 I-81 – Syracuse, Canada Westbound exit and eastbound entrance
Le Ray 4.7 US 11
4.9 Fort Drum main gate
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ a b "Work on new Fort Drum highway to begin this week". WSTM-TV. Associated Press (Syracuse, New York). July 20, 2010. http://www.cnycentral.com/news/story.aspx?id=484914. Retrieved August 2, 2010. 
  2. ^ a b c d e "I-781 application and other related documents" (PDF). American Association of State Highway and Transportation Officials. October 1, 2009. http://cms.transportation.org/sites/route/docs/NewYork_I-781%20Binder.pdf. Retrieved October 10, 2009. 
  3. ^ "Fort Drum connector plans change". Capital News 9 (Albany, New York). January 26, 2006. http://capitalnews9.com/capital-region-news-12-content/headlines/?ArID=16307&SecID=33. Retrieved October 11, 2009. 
  4. ^ Zimmerman, Nicolas (January 25, 2006). "New York Transportation Department switches to north route". Watertown Daily Times. 
  5. ^ New York State Department of Transportation (October 2007). Official Description of Highway Touring Routes, Bicycling Touring Routes, Scenic Byways, & Commemorative/Memorial Designations in New York State. 
  6. ^ "Drum connector road gets federal funding". WWTI (Watertown, New York). June 3, 2008. http://www.myabc50.com/news/local/story/Drum-connector-road-gets-federal-funding/OV7RjyKF7EG3w7hrAYzAvQ.cspx. Retrieved March 17, 2010. 
  7. ^ a b c d Haase, Sarah (February 24, 2010). "Fort Drum/I-81 connector plans still a go, on schedule". Watertown Daily Times. http://www.watertowndailytimes.com/article/20100224/NEWS03/302249976. Retrieved March 17, 2010. 
  8. ^ a b Heller, Marc (February 21, 2010). "Funding for Drum connector rejected". Watertown Daily Times. http://www.watertowndailytimes.com/article/20100221/NEWS02/302219960. Retrieved March 17, 2010. 
  9. ^ Gibas, Katie (February 24, 2010). "Despite funding rejection, Fort Drum connector highway project moves forward". News 10 Now (Syracuse, New York). http://watertown.ynn.com/content/top_stories/497029/despite-funding-rejection--fort-drum-connector-highway-project-moves-forward. Retrieved March 17, 2010. 
  10. ^ Richards, Joanna (April 27, 2009). "DOT to work around rare bats". Watertown Daily Times. http://www.watertowndailytimes.com/article/20090427/NEWS03/304279964. Retrieved March 17, 2010. 
  11. ^ "Project gives bats a break". Times Union. Associated Press (Albany, New York). May 4, 2009. 
  12. ^ a b "Fort Drum Connector (I-781) Project Update" (PDF). New York State Department of Transportation. May 18, 2010. https://www.nysdot.gov/regional-offices/region7/projects/fort-drum-connector/fort-drum-repository/Project%20Update%20FDC%205-18-10.pdf. Retrieved July 31, 2010. 
  13. ^ "Fort Drum Connector Project – Construction Information". New York State Department of Transportation. https://www.nysdot.gov/regional-offices/region7/projects/fort-drum-connector/construction. Retrieved October 11, 2009. 
  14. ^ Rusho, Kris (August 4, 2010). "Ground Broken for Fort Drum Connector Road". WWNY-TV (Watertown, New York). http://www.wwnytv.com/news/local/Ground-Broken-for-Fort-Drum-Connector-Road-99983119.html. Retrieved August 4, 2010. 

External links