Green Line (MBTA)

GREEN LINE

Green Line train at Heath Street station
Overview
Type Light rail
Locale Boston, Massachusetts
Termini East terminals:
Lechmere (E)
North Station (C)
Government Center (B, D)
West terminals:
Boston College (B)
Cleveland Circle (C)
Riverside (D)
Heath Street (E)
Stations 66 (total)
Services
Daily ridership 232,000[1]
Operation
Opened 1897
Owner MBTA
Operator(s) MBTA
Character Subway, grade-separated ROW, street running
Rolling stock Kinki Sharyo Type 7
AnsaldoBreda Type 8
Technical
Line length 22.6 miles (36.4 km)[2]
Track gauge 4 ft 8 12 in (1,435 mm) (Standard gauge)
Minimum radius 33 ft (10.058 m) [3]
Electrification Overhead catenary
Route map
Legend
College Avenue
Ball Square
Lowell Street
Gilman Square
Brickbottom
Union Square
Green Line Extension
Lechmere
Lechmere Viaduct
Charles River
Science Park
North Station
Haymarket
Government Center
Tremont Street Subway
Park Street
Boylston
Pleasant Street Portal (former)
Arlington
Copley
Copley Junction
Hynes Convention Center
Kenmore

The Green Line is a streetcar system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts area of the United States. It is the oldest line of Boston's subway, which is known locally as the 'T'. The Green Line runs underground downtown and on the surface in outlying areas. With a daily weekday ridership of 232,000,[1] it is also the most heavily-used light rail line in the country. The line was given the green color because it goes primarily though an area called the Emerald Necklace of Boston.[4] The four branches are the remnants of a once large system of streetcar lines, begun in 1856 with the Cambridge Horse Railroad. The Tremont Street Subway - the oldest subway tunnel in North America - and several connecting tunnels carry cars of all branches under downtown. The Tremont Street Subway opened in stages between September 1, 1897, and September 3, 1898, to take streetcars off surface streets.

Contents

Description

The modern-day Green Line has its northern terminus at Lechmere station in eastern Cambridge. From there it runs south over the Lechmere viaduct and into the Tremont Street Subway under downtown Boston, then west in the Boylston Street Subway to Kenmore. Collectively, the Green Line tunnels through Downtown Boston and the Back Bay are sometimes called the Central Subway in planning documents. Along the way, the "E" Branch splits just west of Copley station, running southwest through the Huntington Avenue Subway, eventually ramping up to the surface, continuing along Huntington Avenue, and terminating at Heath Street.

The "B", "C", and "D" Branches all diverge west of Kenmore. From south to north, the "D" Branch surfaces onto the grade-separated Highland Branch, a branch of the Boston and Albany Railroad until 1958, running to Riverside. The "C" Branch surfaces onto Beacon Street, running to Cleveland Circle, and the "B" Branch runs along Commonwealth Avenue to Boston College.

The "A" Branch ran to Watertown until 1969. Although the route-letter scheme had been introduced two years prior to its closure, the "A" designation was never signed on streetcars operating to Watertown. It was, however, included in the destination signs on the Boeing-Vertol LRVs ordered in the mid-1970s, when reopening the Watertown service was still under consideration. The A line tracks remained in non-revenue service to access maintenance facilities at Watertown until 1994.

The elevated tracks north of the Central Subway near North Station were closed from June 2004 until November 12, 2005 for replacement of the Causeway Street Elevated with a new tunnel under Causeway Street, still connecting to the Lechmere Viaduct.[5] The historic concrete Viaduct across the Charles River remains in service, although it was closed for a number of months in 2011 to allow a complete rebuilding of Science Park station.

The original Tremont Street Subway south of Boylston station has been closed since 1962, and the streetcar lines feeding into it were replaced by bus service. The Pleasant Street Portal at its southern end has been covered over, but there were plans to build a new portal and reuse part of the tunnel for Phase III of the Silver Line bus rapid transit project. As of 2011, all Phase III tunnel construction plans are on indefinite hold due to lack of funding and heavy community opposition.

Rolling stock

Like the three other MBTA subway lines, the Green Line uses standard gauge tracks.

Active fleet

The Green Line's rolling stock as of February 2010 includes:[6]

Year Built Make Model Length ft ( mm) Width in ( mm) Gauge Road Numbers
1986–1988 Kinki-Sharyo Type 7 LRV 72 ft (21,946 mm) 104 in (2,642 mm) 4 ft 8 12 in (1,435 mm) (36xx): 3600–3699 (91 active)
1997 Kinki-Sharyo Type 7 LRV 72 ft (21,946 mm) 104 in (2,642 mm) 4 ft 8 12 in (1,435 mm) (37xx): 3700–3719 (19 active)
1998-2007 AnsaldoBreda Type 8 LRV 74 ft (22,555 mm) 104 in (2,642 mm) 4 ft 8 12 in (1,435 mm) (38xx): 3800–3894

Retired fleet

(Only MBTA operated vehicles included. Does not include older cars from the Boston Elevated Railway era)

Years in Service Make Model Length ft ( mm) Width in ( mm) Gauge Total Number of Cars
1976–2007 Boeing Vertol US Standard Light Rail Vehicle 71 ft (21,641 mm) 104 in (2,642 mm) 4 ft 8 12 in (1,435 mm) 150
1937–1985 (10 still in revenue service on Ashmont-Mattapan line) Pullman Standard Presidents' Conference Committee streetcar 48 ft (14,630 mm) 100 in (2,540 mm) 4 ft 8 12 in (1,435 mm) 10 (remaining; more were used in Green Line service)

At the end of the 19th century, the original purpose of the Tremont Street Subway was to allow ordinary streetcars to bypass the worst street congestion in crowded sections of downtown Boston. Thus, ordinary street cars were the first rolling stock used on what would later be designated the Green Line.

For many years, the Green Line used the PCC streetcars developed during the Depression. These were finally phased out in favor of the US Standard Light Rail Vehicle supplied by the new US venture Boeing-Vertol in the mid-1970s. The introduction of the LRV cars was initially heralded as part of an effort to rejuvenate mass transit in medium-sized metropolises.[7] This first series of LRVs were subject to chronic breakdowns, and Boeing soon abandoned its venture into ground transit vehicles.[8]

Desperate for reliable rolling stock, the MBTA launched a PCC overhaul program to extend their life, and these classic cars were still used into the 1980s in the Central Subway. As of 2011, ten of the surviving PCC cars are still run on the Ashmont-Mattapan portion of the Red Line.

In 1987, 100 second generation LRVs were ordered from the Japanese firm Kinki Sharyo, with an additional set of 20 cars ordered and delivered in 1997. The last of the Boeing-Vertol cars were retired in March, 2007, and almost all of them were scrapped.[9] As of 2011, the Kinki Sharyo cars now make up the bulk of the Green Line's rolling stock, as well as the newer "Breda" cars.

One of the earliest surviving pre-PCC cars, Type 5 5734, can still be seen parked on a sidetrack at the Boylston station, along with PCC 3295. These two cars used to be in working condition and were frequently used for fantrips. The most recent fantrip was in 1997, and now the railcars sit at Boylston collecting dust. It is highly doubtful that these cars are still in working condition, and Type 5 5734 reportedly has structural problems with the roof. The San Francisco Muni F Market line historic street railway runs a PCC car in Boston colors, but that specific car never actually ran in Boston.

Accessibility

Unlike the Red Line, Blue Line, and Orange Line, all of which run rapid transit cars and use stations with elevated platforms (so that the car floor is level with the platform and thus the cars are easily handicap-accessible), the Green Line is a trolley/streetcar line and has used a variety of trolley cars and light rail vehicles throughout its history.

Originally, none of the Green Line stations included elevated or raised platforms, and the passengers had to ascend several steps up into the vehicles, limiting accessibility for persons with disabilities. To address this, two changes have been made:[10]

One hundred low-floor cars were purchased from the Italian vendor AnsaldoBreda (Breda), with styling by Pininfarina. These cars initially proved to be problematic and difficult to maintain. The first cars delivered failed every 400 miles (640 km), far less than the 9,000 miles (14,500 km) specified by the MBTA, and were prone to derailments. The MBTA has been forced to spend an additional US$9.5 million to modify tracks to prevent the derailment problems, echoing early problems with the Boeing stock. The MBTA has been criticized for their failure to assess Breda's reliability before entering into the deal, and during the delivery of the vehicles.

In December 2004, the MBTA canceled orders for the remaining cars still to be delivered as part of the authority's nine-year, US$225 million-dollar deal with Breda.[11] One year later, in December 2005 the MBTA announced that it had entered into a restructuring of the deal with the Italian vendor, reducing the order to 85 cars (with spare parts to be provided in lieu of the 15 remaining cars), and providing for the remaining payment under the original 1995 deal only if the cars meet performance requirements.[12] Construction of the last car under the order was completed on December 14, 2006;[13] though in late 2007 the MBTA announced it had contracted with Breda to deliver another 10 cars, bringing the total order to 95 production cars and 5 car shells for parts.[14] As of June 2008, 90 of the Type 8 cars were in service; one was damaged in a derailment/fire incident, and four are still in testing.

After several years of modifications to the Green Line "D" Branch tracks, the Breda cars finally returned to service on that line, and now provide service to every branch of the Green Line.

The MBTA runs one-, two-, and, three-car trains on the Green Line, depending on travel demand and vehicle availability. As of December 2011, two-car trains now run from the start to end of service Monday through Friday, with three-car trains running on select rush-hour trips on the B, D, and E branches.[15] The MBTA has promised that each two- and three-car train on the system will contain at least one Type 8 low-platform car to facilitate access for disabled persons.

History

The name "Green Line" was assigned in the 1960s as part of a major reorganization of the MBTA system's branding.

The predecessor of today's Green Line was created by the Massachusetts legislature, but under private ownership, as the West End Street Railway in 1887. This system of horse-drawn streetcars was the merger of numerous independently operated railways built from the 1850s onward. At the time of the merger, West End operated 1,480 cars with a team of 7,816 horses.[16]

The Allston - Park Square line (which served the general area of the "A" Branch, and is covered in that article) was the first section to be converted to electric traction in 1889, using modified existing horsecars outfitted with Frank J. Sprague's equipment first demonstrated in Richmond, Virginia. This initial line used overhead trolley wires for most of its length, but also third rail equipment supplied by the Bentley-Knight Electric Railway Company in sections where residents initially objected to overhead lines. The Bentley-Knight approach was abandoned soon after several horses were electrocuted due to inadequate insulation.[17] By 1889, the Sprague equipment was dropped in favor of Thomson-Houston (now General Electric) motors and generators, to which the rest of the system was converted.

In 1897, the West End Street Railway property was handed over to the Boston Elevated Railway (BERy) in the form of a 24 year lease, and the companies were ultimately combined. BERy, now under state ownership, evolved into today's MBTA, which was called the Metropolitan Transit Authority (MTA) in the interim from 1947 to 1964.

As a tunnel built to get streetcar lines off the streets, rather than a rapid transit line, the Tremont Street Subway has had many connecting surface branches, with many services operating in many patterns. Additionally, many services from other companies, notably the Eastern Massachusetts Street Railway and its predecessors, have run into the subway from outer suburban points via BERy trackage. A partial list of these services is in the green rows on Boston-area streetcar lines.

In the 1970s the Green Line and all other MBTA lines were re-evaluated by the Boston Transportation Planning Review for region-wide efficacy and future modernization alternatives initiated as far as physical plant and operating measures.

Portals

Cars entered the subway from the surface at a number of portals or inclines, listed here from north to south/east to west.

Lechmere

Lechmere is the north end of the Green Line. From the opening of the Lechmere Viaduct leading to it in 1912 until 1922, streetcar lines simply fed onto the viaduct from Cambridge Street and Bridge Street (now Monsignor O'Brien Highway). In 1922 a prepayment station was opened, with a new loop for subway trains to turn around and a separate loop for surface cars, and no intermingling between the two. The surface lines have since been replaced with buses, but the Green Line still turns around at Lechmere.

Canal Street

The Canal Street Portal (also Haymarket Portal, North Station Portal or Causeway Street Portal, often referred to in revenue service as the Canal Street Loop) was part of the transition between subway and elevated railway on the Green Line, as it transitioned from the Tremont Street Subway to the Causeway Street Elevated towards the Lechmere Viaduct until 2004, when the Green Line north of North Station was closed for building of a new tunnel and portal. Certain trains turned at Canal Street, while others emerged from the subway to a viaduct to Lechmere. It was, however, possible for a passenger to alight from a train at Canal Street and proceed up a series of stairways to the Lechmere Viaduct. However most passengers desiring to continue to Science Park or Lechmere would have changed to a Lechmere signed car from a North Station signed car prior to the emergence from the central subway.

The original four-track portal opened in 1898 at the north end of the first subway; cars could turn east or west on Causeway Street. In 1901 the Charlestown Elevated was connected to the outer tracks, and streetcars only operated via the inner tracks. The Washington Street Tunnel opened in 1908, connecting to the Elevated via a new portal just east of the streetcar one, and all four tracks were once again open for streetcar use until 1975. In 1912 the Lechmere Viaduct opened, again using the two outer tracks for an elevated line. The inner tracks continued to serve the surface, including a surface station at North Station, until 1997, when they were closed for construction of the new tunnel and the Green Line was shifted to the old Orange Line (Charlestown Elevated) portal along the way. The 93 was the last service to continue onto surface streets from the portal, last running in 1949.

Pleasant Street

The Pleasant Street Portal was the south end of the Tremont Street Subway, opened one month after the original subway in 1897. It split from the Boylston Street Subway at a flying junction at Boylston, and another flying junction split the tunnel into two side-by-side tunnels to the four-track portal. The two west tracks rose onto Tremont Street and the two east ones onto Pleasant Street, later part of Broadway. From 1901 to 1908 the portal was only used by Washington Street Elevated trains, after which streetcar service was restored—though much of it had been cut back to Dudley for transfer to the Elevated. The last cars ran through the portal in 1961 as part of the 43, and in 1962 a shuttle service from Boylston to the portal was ended. The portal has since been covered.

Public Gardens and Boylston Street

The first portal to open, on September 1, 1897, was the Public Garden Portal, providing an outlet for the subway on the north side of Boylston Street in the Public Garden. When the Boylston Street Subway opened in 1914, extending the subway west, the incline and portal were relocated to the center of Boylston Street as the Boylston Street Portal. The last cars to use the portal ran in 1941 from Huntington Avenue, when the Huntington Avenue Subway opened as a branch off the main subway and the portal was closed.

Northeastern

The Northeastern Portal lies in the median of Huntington Avenue at the end of the Huntington Avenue Subway, just east of Northeastern University. It opened in 1941 and carries "E" Branch trains.

The incline was built as a wooden trestle to the street atop a level grade, as the original plans called for eventual extension of the subway; in the mid 1980s the trestle was replaced with fill (which greatly quieted the sound).

Kenmore

The Kenmore Portal or Kenmore Square Portal opened in 1914 with the building of the Boylston Street Subway west to the east side of Kenmore Square, in the median of Commonwealth Avenue. It closed in 1932 when the subway station at Kenmore was built and two new portals opened to the west.

Blandford Street, St. Marys Street, and Fenway

The Blandford Street Portal and St. Marys Street Portal, in the medians of Commonwealth Avenue and Beacon Street respectively, opened in 1932 as part of the extension of the Boylston Street Subway under Kenmore Square and the opening of the new Kenmore station. They are currently used by the "B" and "C" Branches respectively. The Fenway Portal opened in 1959 along with the opening of the Highland Branch, and provides a third exit from Kenmore, south of the St. Marys Street Portal. It carries trains of the "D" Branch.

Turnarounds

Cars can reverse direction at a number of stations

Lechmere is currently the north end of the Green Line, and consists of a balloon-shaped turnaround.

At North Station, trains heading eastbound/outbound toward Lechmere can turn around. No turnaround is available in the westbound/inbound direction.

At Government Center, trains entering from either the east or west can turn around.

At Park Street trains can turn around in one direction only. Trains headed toward Lechmere upon entering Park Street on the inside track can turn around on a tight turn and end up on the so-called fence track. This is the track that takes trains out to Boston College and Heath Street.

Kenmore is where trains coming from Cleveland Circle or the Riverside Branch can turn around to the outbound track that takes trains to Cleveland Circle or Riverside. No turnaround is available for the "Boston College"/"Commonwealth Avenue" Branch.

Branches

The branches were given letters in 1967, two years after the green color was assigned to the line on August 26, 1965. The letters were assigned increasing from north to south, to the five remaining branches. No branches had used the Canal Street Portal except as a terminal since 1949 with the 93 or the Pleasant Street Portal since 1961 with the 43, and a shuttle until 1962. All trains stop at Government Center, Park Street, Boylston, Arlington, and Copley. All trains except "E" also stop at Hynes Convention Center and Kenmore. Only "E" trains stop at Prudential and Symphony. On the eastern end, only "C" and "E" trains go past Government Center to Haymarket and North Station; the only train that services Science Park and Lechmere is the "E" train. A red line through the letter on a sign means that the train goes only part way on that branch (for example, a D-line car only going as far as Reservoir).

The "B", "Boston College" or "Commonwealth Avenue" Branch is the northernmost of the three lines that split west of Kenmore. It travels west down the middle of Commonwealth Avenue, ending at Boston College. As of February 2009, regular B service turns around at Government Center. It is the most criticized line in the Green Line, primarily due to its high frequency of densely located stops. This causes the branch to bear the highest average per-mile operations cost, the slowest passenger riding time, and the greatest number of complaints.

The "C", "Cleveland Circle" or "Beacon Street" Branch is the middle one of the three branches heading west from Kenmore, and the straightest, running down the middle of Beacon Street through Brookline to Cleveland Circle. As of February 2009, regular "C" service turns around at North Station.

The "D" or "Highland" Branch is the southernmost of the three lines that separate west of Kenmore. It is the longest branch, ending in Newton at Riverside. It is the most recent branch, opening in 1959 along the former right-of-way of the Highland Branch of the Boston and Albany Railroad, and has full grade separation, entering the subway at the Fenway Portal. As of February 2009, regular "D" service turns around at Government Center.

The "E" or "Heath Street" (formerly "Arborway") Branch diverges from the other three lines just west of Copley. It travels mainly on the surface of Huntington Avenue, emerging from the Huntington Avenue Subway at the Northeastern Portal. Since 1985, service has been truncated to Heath Street, with continuing service to Arborway provided by the 39 bus. In 2008, the tracks from Heath Street to Arborway were paved over. The "E" is the only branch to have a regularly used street-running section. As of February 2009, regular "E" service turns around at Lechmere. Passengers must board "E" Branch trains to get to station stops between Lechmere and North Station.[18]

Former branches

The Green Line "A" Branch was the northernmost of the branches, running from the Blandford Street Portal, which is still used by the "B" Branch, west to Watertown, mostly street-running. The 57 bus replaced the streetcar line in 1969.

The Pleasant Street Portal hosted two services in its final days. The 9 to City Point ended in 1953, and the 43 to Egleston was cut back to Lenox Street in 1956, cut back to the portal in 1961, and ended operation in 1962. Prior to that, the 48 ran out Tremont Street to [Dover Street and Washington Street, ending at Dudley, and last running in 1938.

The last two routes to continue beyond the Canal Street Portal both ran to Sullivan. The 92 ran via Main Street, last running in 1948, and the 93 via Bunker Hill Street last ran in 1949. Until 1997 trains continued to use the portal and its North Station surface station as a terminal.

In addition to the lines that later became the "E" Branch, the predecessors to the 58 and 60 split in Brookline, one branch running into the current "E" tracks and into the Boylston Street Portal, and the other running up Brookline Street to end at Massachusetts Avenue station. These were truncated in 1932 into a shorter route from Brookline Village to the subway via the Boylston Street Portal, which itself stopped running in 1938 (being cut back to Brigham Circle short-turn trips), three years before the closure of that portal.

The last "foreign" cars to operate in the subway were those of the Eastern Massachusetts Street Railway, running from the Canal Street Portal to the Brattle Loop at Scollay Square until 1935. It was then that the old Mystic River Bridge to Chelsea was closed to streetcars and the lines were replaced by bus service; the next year the BERy bought the Eastern Mass Chelsea Division and through-routed it with its lines connecting to the East Boston Tunnel at Maverick.

From the Lechmere terminal opening on July 10, 1922 to February 6, 1931, special service ran from Lechmere to various points on the subway. These trips were replaced on February 7, 1931 by extensions of the various branches from the west, which had terminated at Park Street, through to Lechmere.

Operations and signalling

The Green Line is signalled with advisory wayside signals except on surface portions in street medians or in-street running. Wayside signal territory stretches from Lechmere to the surface portals at Kenmore, and along the D-Riverside branch. There are no automatic protection devices, as the vehicles are equipped with track brakes—giving the operator the ability to stop quickly. Interlockings are controlled through a wayside Automatic Vehicle Identification (AVI) system that relies on the operator properly entering the destination manually on a roto-wheel in the train cab.

The Green Line is monitored from the 45 High Street rapid transit control room. Responsibility for controlling service is shared by the control room and field personnel located along the right of way. Track circuit and signal indications are not transmitted to the operational personnel sites. In lieu of track circuit indications, the AVI system is displayed in the control room to provide a periodic update to train position wherever AVI detectors exist. The AVI system user interface was solely text based until the current control room was opened, in which a new schematic display based on AVI data was instituted. Track circuit indications are available digitally in three signal houses but not transmitted to central control—at Park Street interlocking, at the new North Station interlocking, and at the new Kenmore interlocking.

Plans to reinstitute a crossover for through movements from the terminating (inner) northbound platform at Park Street towards Government Center are expected to increase capacity on the Green Line.

Future plans

Somerville/Medford extension (Green Line Extension Project)

To settle a lawsuit with the Conservation Law Foundation to mitigate increased automobile emissions from the Big Dig, the Commonwealth of Massachusetts agreed to extend the Green Line from its present northern terminus at Lechmere to Medford Hillside. The extension would pass through Somerville and Medford, two suburbs currently underserved by the MBTA relative to their population densities, commercial importance, and proximity to Boston. The line would use two railroad rights-of-way that currently serve the Lowell Line (which also carries Amtrak's Downeaster) and the Fitchburg Line MBTA Commuter Rail. The extension is projected to have a total weekday ridership of about 52,000.[19] The Green Line would see an increase in boardings of 30,700, and the MBTA system would see between 7,000 and 8,000 new transit users.[19]

As of February 2, 2009, the stops planned for the Green Line Extension would be a relocated Lechmere Station, Brickbottom at Washington Street, Gilman Square at Medford Street, Lowell Street, Ball Square, Hillside (at College Avenue in Medford, on the edge of Tufts University campus), and a terminus at Route 16 and Mystic Valley Parkway in Somerville (on the Mystic River). A potential stop at Winthrop Street and Boston Ave was dropped due to the proximity of other stations and neighborhood opposition. A branch line would split off after Lechmere station, ending at Union Square in Somerville (or slightly south thereof, on the Fitchburg Line). The plan was designed to extend the Green Line to Mystic Valley Parkway by the settlement-imposed deadline of December 31, 2014.[20]

Stops are designed to be accessible by pedestrians and bikes or drop-off, but with no new parking. The 2003 PMT estimated a cost of $375,000,000 for the Green Line Extension, a figure that presumed the Extension would reach West Medford (about 1,500 feet (460 m) further than the current plan) with a daily ridership of 8,420 and 3,540 of those diverted from non-transit modes.[21] At 10% design, the Final Environmental Impact Report estimated a cost of $953.7 million (in "year of expenditure" dollars) for seven new stations and 24 new light rail vehicles.

The MBTA plans to extend the E branch from Lechmere to Union Square, and extend the D branch from Government Center to College Avenue. The contract for construction would be a Design/Build construction contract. The contract was expected to be advertised for Design/Build Ventures to bid on in Fall 2011. Construction would begin in Spring 2012 with an expected cost of $953.7 million. The project would be partially funded by the Commonwealth and the Federal Government under the New Starts Program.

In 2010, the Massachusetts Department of Transportation (MassDOT) announced that the new service was expected to be operational in October 2015; interim air quality offset measures would need to be taken if the project misses its December 2014 deadline as expected. The Department of Transportation had previously announced that due to budget limitations, the portion from College Avenue to Route 16 would be a future second phase of the extension, not included in the current proposed project.[19]

As of August 2011, MassDOT has announced that opening of the Extension has been postponed to Fall 2018 at the earliest. Completion of the Extension to College Avenue near Tufts University could be delayed to 2020, while the terminus at Mystic Valley Parkway remains deferred indefinitely. The stated reason for the delays is difficulties in land acquisition, plus implied concerns about cost controls and financing.[22]

Arborway restoration cancelled

Another mitigation project in the initial lawsuit settlement was restoration of service on the "E" Branch between Heath Street and Arborway/Forest Hills. After some internal and community opposition, a revised settlement agreement resulted in the substitution of other projects with similar air quality benefits. In lieu of the rail project, the state undertook a project to speed the Route 39 bus by making improvements such as consolidating bus stops, lengthening stops, and re-timing traffic lights. Improvements were funded by the federal American Recovery and Reinvestment Act of 2009 and were expected to be completed in 2010.[23]

Light Rail Accessibility Project

As of 2011, the Kenmore Square[24] and Copley Square[25] stations have been rebuilt for reasons of accessibility. Arlington[26][27] station was recently rebuilt and is now wheelchair accessible, equipped with elevators, mobile lifts and raised platforms. As of 2011, the MBTA was planning a $72 million project to rebuild Government Center station in Boston for ADA compliance.

Fare prepaid station listing

The following table lists Green Line stations which have prepaid fare areas (also called fare control), which allow quick boarding through front and rear doors at a train stop. At all other stations, passengers must line up at the front entrance to the railcar to pay fares, slowing travel times especially during peak periods.

Station Location Time to Park Street[28] Opened Transfers and notes
Main line: Lechmere Viaduct, Tremont Street Subway and Boylston Street Subway
Lechmere Cambridge Street, (Cambridge)
Lechmere Square
13 minutes
(sign said 12)
July 10, 1922 "E" Branch terminus
Viaduct to Lechmere opened June 1, 1912, with tracks running directly onto streets through July 9, 1922
Science Park Charles River Dam Bridge (Boston)
Museum of Science
8 minutes August 20, 1955 Located on Lechmere Viaduct
Only surviving elevated station on the Green Line
North Station Canal Street (Boston)
TD Garden sports arena
June 28, 2004 "C" Branch terminates here
Orange Line and Commuter Rail north side lines
Surface station opened September 3, 1898 and closed March 27, 1997
Elevated station opened June 1, 1912 and closed June 24, 2004
Haymarket Congress and New Sudbury Streets (Boston) May 10, 1971 Orange Line
Original station opened September 3, 1898
Government Center Tremont, Court, and Cambridge Streets (Boston)
Boston City Hall, Faneuil Hall/Quincy Market area
2 minutes September 3, 1898 "B" and "D" Branches terminate here
Blue Line
Formerly "Scollay Square" until October 27, 1963
Park Street Tremont, Park, and Winter Streets (Boston)
Boston Common
0 minutes September 1, 1897 Red Line, Orange Line, and Silver Line (must exit fare control area for Silver Line)
Boylston Tremont and Boylston Streets (Boston)
Boston Common
1 minute September 1, 1897 Silver Line (must exit fare control area)
Abandoned tracks split off at Boylston to the Pleasant Street Incline
Arlington Boylston and Arlington Streets (Boston)
Boston Public Garden
3 minutes November 13, 1921 Free crossover allowed at mezzanine level, to reverse direction of travel
Copley Boylston Street (Boston)
Copley Square
4 minutes October 3, 1914 "E" Branch splits off after Copley
No crossover between directions at Copley; use Arlington to reverse direction
Hynes Convention Center Massachusetts Avenue and Newbury Street (Boston)
Hynes Convention Center
October 3, 1914 Formerly "Massachusetts" until February 17, 1965, then "Auditorium" until March 27, 1990, then "Hynes Convention Center/ICA" until November 2006.
Kenmore Kenmore Square (Boston)
Fenway Park
12 minutes October 23, 1932 "B", "C", and "D" Branches split here
E Branch (splits off after Copley): Huntington Avenue Subway
Prudential Huntington Avenue (Boston)
Prudential Center
February 16, 1941 "E" Branch
Formerly "Mechanics" until (TBD)
Symphony Massachusetts Avenue and Huntington Avenue (Boston)
Boston Symphony Hall
February 16, 1941 "E" Branch
D Branch: Highland Branch
Riverside Auburndale in Newton, Massachusetts July 4, 1959 "D" Branch terminus

Incidents and accidents

On May 28, 2008, two 'D-line' trains collided in Newton. The operator of one of the trains was killed and numerous riders were taken to the hospital with injuries of varying degrees of seriousness. While it was originally thought that cell phone use was responsible for the accident, it was determined that the actual cause of the crash was an episode of micro-sleep caused by the driver's sleep apnea.[29]

On May 8, 2009, two Green Line trolleys rear-end collided underground between the Park Street Station and Government Center Station when the driver of one of the trolleys, 24-year-old Aiden Quinn, was text messaging his girlfriend while driving the train.[30] A tougher policy on cell phones by the MBTA was put in place.[31] Quinn had run through a red light before the trolley crash. The crash injured 46 people. MBTA officials estimated that the cost of damages from the crash was $9.6 million. [32]

A pilot test of collision-avoidance technology on the Ashmont–Mattapan High Speed Line was planned for 2009 and was intended to facilitate the adoption of similar technology on the Green Line.

Gallery

See also

Notes

  1. ^ a b American Public Transportation Association, APTA transit ridership report, Q3 2011. Accessed 2 January 2012
  2. ^ Boston at urbanrail.net
  3. ^ On line pubs TRANSPORTATION RESEARCH BOARD EXECUTIVE COMMITTEE 1995
  4. ^ Kleespies, Gavin W. and MacDonald, Katie. "Transportation History". Harvard Square Business Association. http://www.harvardsquare.com/History/Glimpses/Transportation.aspx. Retrieved 4 October 2011. 
  5. ^ Daniel, Mac (November 11, 2005). "Lechmere, Science Park stations reopen". The Boston Globe. http://www.boston.com/news/local/massachusetts/articles/2005/11/11/lechmere_science_park_stations_reopen/. 
  6. ^ "Ridership and Service Statistics - Thirteenth Edition 2010". MBTA. p. 20. http://www.mbta.com/uploadedfiles/documents/Bluebook%202010.pdf. Retrieved December 13, 2011. 
  7. ^ U.S. DOT / Boeing brochure
  8. ^ Boston's Green Line Crisis
  9. ^ "End of the line for T pioneers". The Boston Globe. March 16, 2007. http://www.boston.com/news/local/articles/2007/03/16/end_of_the_line_for_t_pioneers/. 
  10. ^ MBTA > About the MBTA > Transit Projects > Transit Projects and Accessibility
  11. ^ Flint, Anthony. "MBTA Halts Purchase of Green Line 'Lemons'" (mirrored copy). The Boston Globe. December 12, 2004.
  12. ^ Daniel, Mac (December 17, 2005). "Green Line seeks zippier service with upgrade plan". The Boston Globe. http://www.boston.com/news/local/massachusetts/articles/2005/12/17/green_line_seeks_zippier_service_with_upgrade_plan/. 
  13. ^ "Bredas". The Boston Globe. December 14, 2006. http://www.boston.com/news/local/startsandstops/blog/2006/12/bredas.html. 
  14. ^ Bierman, Noah (November 12, 2007). "T will take 10 new cars for its busy Green Line". The Boston Globe. http://www.boston.com/news/local/articles/2007/11/12/t_will_take_10_new_cars_for_its_busy_green_line/. 
  15. ^ Pesaturo, Joseph (March 16, 2011). "Green Line to nearly triple the number of 3-car trains". MBTA. http://www.mbta.com/about_the_mbta/news_events/?id=21305. Retrieved December 13, 2011. 
  16. ^ Boston IEEE Section Techsite-MBTA Milestone
  17. ^ IEEE History Center
  18. ^ mbta.com/schedules and maps/subway/lines
  19. ^ a b c Bowles, Ian (July 30, 2010), Final Environmental Impact Report, p. 5, https://www.commentmgr.com/Projects/1228/docs/13886feir.pdf, retrieved October 16, 2010 
  20. ^ Boston Globe article - Potential Green Line stops announced. May 7, 2008
  21. ^ Appendix, tables C-10 and C-11. http://www.bostonmpo.org/bostonmpo/pmt-old/pmt.htm
  22. ^ Byrne, Matt (August 1, 2011). "State: Green Line extension will be delayed til 2018". boston.com (The Boston Globe). http://www.boston.com/yourtown/news/medford/2011/08/state_greenline_extension_will.html. Retrieved 2011-08-01. 
  23. ^ http://mbta.com/about_the_mbta/t_projects/default.asp?id=19047#rt39
  24. ^ http://mbta.com/about_the_mbta/t_projects/default.asp?id=992
  25. ^ http://mbta.com/about_the_mbta/t_projects/default.asp?id=5160
  26. ^ http://mbta.com/about_the_mbta/t_projects/default.asp?id=978
  27. ^ http://mbta.com/schedules_and_maps/subway/lines/stations/?stopId=15595&lat=42.351847&lng=-71.070817
  28. ^ Association for Public Transportation, Car-Free in Boston, A Guide for Locals and Visitors, 10th ed. (2003), p. 117.
  29. ^ http://www.ntsb.gov/doclib/reports/2009/RAR0902.pdf
  30. ^ "Trolley Driver Was Texting Girlfriend At Time Of Crash: 46 Injured In Green Line Crash", WCVB, Boston, May 8, 2009.
  31. ^ "Trolley Crash Inspires Tougher Cell Phone Policy: NTSB Still Investigating Crash", WCVB, May 9, 2009
  32. ^ Texting Trolley Driver Is Transgendered Male, ABC News, May 11, 2009

External links

Extension project