Driscoll Expressway

Driscoll Expressway
Route information
Maintained by NJTA
Length: 36 mi (58 km)
Major junctions
South end: G.S. Pkwy. / US 9 in Toms River
  Route 37 in Toms River
Route 70 in Lakehurst
I-195 in Jackson Township
Route 33 in Manalapan Township
CR 520 in Old Bridge Township
North end: I-95 / NJ Turnpike in South Brunswick Township
Highway system

New Jersey State Highway Routes
Interstate and US

The Driscoll Expressway was a proposed 36-mile (58 km) long tolled limited-access highway in Central Jersey that would have connected the New Jersey Turnpike with the Garden State Parkway in the U.S. state of New Jersey.

Contents

Proposed route description

The Driscoll Expressway, if it had been built, would have passed through the following communities from South to North:

The proposed highway was to have 12-foot (3.7 m) wide lanes and shoulders as well as a wide median with preserved vegetation and a 450-foot (140 m) wide right-of-way area of preserved open space. Engineers decided that the speed limit would have been posted at 60 mph (97 km/h), as opposed to 70 mph (110 km/h) for extra safety. The southern half of the highway would have run through the Pinelands Preserve, an area of sandy soil that prevents most plant species other than pines to grow, hence the name.

History

Originally envisioned as the 45-mile (72 km) long Garden State Thruway, the proposed highway was designated in 1971 for former Governor of New Jersey Alfred E. Driscoll by the New Jersey Highway Authority. However, in the mid 1970s, the plans were scratched. The New Jersey Turnpike Authority then stepped in, drawing up plans for a proposed 36-mile (58 km) long highway. The route would have provided a route to Southern New Jersey for trucks coming from the Trenton area. The highway was now scheduled for completion in 1976.

However, the project was doomed. Citizens opposed the unwanted traffic that the highway would bring, the pollution that it would release, as well as the harm it would do to the Pine Barrens. Also, voters turned down a $650 million issue for transportation issues. The governor of the time, Brendan Byrne, tried to kill the proposal because of the negative environmental impact it would have. The Authority did not listen, but when Byrne saw that Turnpike tolls would rise by more than 80%, he became more determined. In March 1975, the New Jersey Turnpike Authority dropped plans for the highway. Hopes to revive the highway failed and the New Jersey Turnpike Authority began to sell off the rights-of-way in the late 1980s.

Proposed interchanges

County Location Mile # Destinations

(Unknown as the highway was never constructed)

Notes
Ocean Toms River 0.00 D1 G.S. Pkwy. / US 9 Begin/end Driscoll Expressway
?.?? D2 Route 37
Lakehurst ?.?? D3 Route 70 Toll Plaza would have been placed at this interchange
Jackson Township ?.?? D4 I-195 Toll Plaza would have been placed at this interchange
Monmouth Manalapan Township ?.?? D5 Route 33 Toll Plaza would have been placed at this interchange
Middlesex Old Bridge Township ?.?? D6 CR 520 Toll Plaza would have been placed at this interchange
South Brunswick Township ?.?? D7 NJ Turnpike / I-95 Begin/end Driscoll Expressway

See also

External links