Archer Avenue Line

IND/BMT Archer Avenue Line

The E, J, and Z trains serve the Archer Avenue Line.
Overview
Type Rapid transit
System New York City Subway
Locale Queens
Termini Parsons/Archer
Jamaica–Van Wyck
Stations 3
Operation
Opened 1988
Owner City of New York
Operator(s) New York City Transit Authority
Character Underground
Technical
No. of tracks 2-4
Track gauge 4 ft 8 12 in (1,435 mm)
Electrification 600V DC third rail
Archer Avenue Line
Legend
IND Queens Boulevard Line
Jamaica Center –
Parsons/Archer
Sutphin Boulevard – Archer Avenue –
JFK Airport
Jamaica – Van Wyck
BMT Jamaica Line

The Archer Avenue Lines are two rapid transit lines of the New York City Subway, mostly running under Archer Avenue in the Jamaica neighborhood of Queens. Conceived as part of the Metropolitan Transportation Authority's 1968 expansion plans, they opened on December 11, 1988.[1]

The two lines are built on separate levels, served by trains from the IND Queens Boulevard Line (E train) on the upper level, and the BMT Jamaica Line (J Z trains) on the lower. Since the two levels share no track connections and have different chainings and radio frequencies, they are two separate lines—the B2 Division Archer Avenue Line (upper level) and the B1 Division Archer Avenue Line (lower level).

Contents

Extent and service

The following services use the Archer Avenue Line:

Service Section of line
Eighth Avenue Local / Queens Boulevard Express upper level, north of junction with the IND Queens Boulevard Line
Nassau Street Local / Jamaica Express lower level, north of 121st Street on the BMT Jamaica Line
Nassau Street Local / Jamaica Express

Construction on the Archer Avenue subway began on August 15, 1972, at Archer Avenue and 151st Street, paving the way for the southeast Queens subway line and the demolition of the Jamaica Avenue Elevated from 121st Street to the 168th Street terminal. The first tunnel between the Jamaica Ave Elevated and the Archer Avenue subway was holed through in October 1977. The second tunnel connection holing through of the Archer Avenue subway tunnels occurred in December 1977. In October 1979, groundbreaking for a 1,300 ft cut and cover section of the Archer Avenue line occurred. This section also included the Jamaica – Van Wyck station. Construction was supposed to be completed in 1984, but was completed ahead of time in 1983, five years before the subway opened on December 11, 1988.

The two Archer Avenue Lines begin at a northern terminal, Jamaica Center – Parsons/Archer (E J Z trains), as a bi-level subway, with each level consisting of two tracks. The two lines run compass west along Archer Avenue to another station at Sutphin Boulevard – Archer Avenue – JFK Airport, where connections can be made to the Long Island Rail Road and AirTrain JFK. West of this station, the two levels diverge. The lower level tracks (J Z trains) continue roughly compass northwest, emerging from a portal near 89th Road and 130th Street and paralleling the Main Line of the LIRR before turning west onto the elevated structure of the BMT Jamaica Line. The upper level tracks (E train) turn compass north under the Van Wyck Expressway, with another station at Jamaica Avenue. Just north of Hillside Avenue, they meet the four tracks of the IND Queens Boulevard Line at a flying junction, with connections to both the local and express tracks.

In the original service plan, the G and N trains (the N ran on the IND Queens Boulevard Line until 1987, when the R train replaced the N to allow it access to the Jamaica Yard) were to go to Jamaica Center,[2][3] while the E and F would have remained going towards 179th Street. In the original service plan the N train was to run between Jamaica Center and Coney Island during weekdays while G trains were to terminate at 71st Avenue. During weekends the G train was to run between Jamaica Center and Smith–Ninth Streets, while N trains would terminate at 57th Street – Seventh Avenue or 71st Avenue. During late nights there was supposed to be a G train shuttle between Jamaica Center and Van Wyck Boulevard.[4] The signage indicating such service was installed inside the Kew Gardens – Union Turnpike station in the mid-1980s. When the Archer Avenue Line opened in 1988, a simpler service plan was put into effect. That plan remains as of 2010.

The original plan also called for the E train to continue along the right of way of the Atlantic Branch of the Long Island Rail Road through the Locust Manor and Laurelton stations. The Montauk Branch through St. Albans already provides parallel service to Jamaica. This conversion would have involved modifying existing platforms at Locust Manor and Laurelton to accommodate the IND loading gauge, as well as constructing new stations to serve Southeast Queens. Due to a lack of funding, this plan was never implemented.

Station listing

Station service legend
Stops all times
Stops rush hours in the peak direction only
Time period details

BMT Archer Avenue Line (lower level)

Station Tracks Services Opened Transfers and notes
Jamaica Center – Parsons/Archer all J  Z  December 11, 1988 E 
Sutphin Boulevard – Archer Avenue – JFK Airport all J  Z  December 11, 1988 E 
Connection to LIRR at Jamaica
Connection to AirTrain JFK to JFK Int'l Airport
Merge into BMT Jamaica Line (J  Z )

IND Archer Avenue Line (upper level)

Station Tracks Services Opened Transfers and notes
Jamaica Center – Parsons/Archer all E  December 11, 1988 J  Z 
Sutphin Boulevard – Archer Avenue – JFK Airport all E  December 11, 1988 J  Z 
Connection to LIRR at Jamaica
Connection to AirTrain JFK to JFK Int'l Airport
Jamaica – Van Wyck all E  December 11, 1988
Merge into IND Queens Boulevard Line (E )

References