St Pancras International | |
Station frontage: St Pancras Chambers (formerly Midland Grand Hotel) |
|
St Pancras
Location of St Pancras in Central London |
|
Location | St Pancras |
---|---|
Local authority | London Borough of Camden |
Managed by | Network Rail[1] Eurostar[2] |
Owner | London and Continental Railways[3] |
Station code | STP, SPX |
Platforms in use | 15 |
Accessible | [4] |
Fare zone | 1 |
Interchange | King's Cross St. Pancras (London Underground) London King's Cross (National Rail) |
|
|
National Rail annual entry and exit | |
2004/5 | 5.472 million[5] |
2005/6 | 4.893 million[5] |
- interchange | 0.521 million[5] |
2006/7 | 5.777 million[5] |
- interchange | 0.663 million[5] |
2007/8 | 6.624 million[5] |
- interchange | 1.664 million[5] |
2008/9 | [6] 19.326 million[5] |
- interchange | 2.841 million[5] |
|
|
1 October 1868 | Opened as terminus for Midland |
15 July 2006 | New domestic (Midland) platforms opened |
6 November 2007 | Relaunched by HM The Queen |
14 November 2007 | Eurostar services transferred from Waterloo |
9 December 2007 | Low-level Thameslink platforms opened |
29 June 2009 | Southeastern High speed domestic platforms open for preview services |
13 December 2009 | Southeastern High speed domestic services commence |
|
|
List of stations | Underground · National Rail |
External links | Departures • Layout |
Facilities • Buses | |
St Pancras railway station, also known as London St Pancras and since 2007[7] as St Pancras International[8][9] is a central London railway terminus celebrated for its Victorian architecture. The Grade I listed building stands on Euston Road in St Pancras, London, between the British Library, King's Cross station and the Regent's Canal. It was opened in 1868 by the Midland Railway as the southern terminus of that company's Midland Main Line, which connected London with the East Midlands and Yorkshire. When it opened, the arched Barlow train shed was the largest single-span roof in the world.
After escaping planned demolition in the 1960s, the complex was renovated and expanded during the 2000s at a cost of £800 million with a ceremony attended by the Queen and extensive publicity introducing it as a public space. A security-sealed terminal area was constructed for Eurostar services to Continental Europe—via High Speed 1 and the Channel Tunnel—along with platforms for domestic connections to the north and south-east of England. The restored station houses fifteen platforms, a shopping centre and a bus station, in addition to London Underground services from King's Cross St Pancras tube station. St Pancras is owned by London and Continental Railways along with the adjacent urban regeneration area known as King's Cross Central.
Contents |
The station is the terminus of East Midlands Trains for services from London to the cities of Derby, Leicester, Nottingham, Sheffield, and smaller towns in between.[10] The station provides direct passenger interconnection with Eurostar’s high-speed services to Paris, Brussels and Lille,[11] and First Capital Connect trains on the cross-London Thameslink route, which stop at platforms beneath the station and offer services going south to Gatwick Airport and Brighton, or north as far as Bedford.[12] Domestic services to Kent (run by Southeastern) began in December 2009.[13]
St Pancras is often termed the 'cathedral of the railways', and includes two of the most celebrated structures built in Britain in the Victorian era. The main train shed, completed in 1868 by the engineer William Henry Barlow was the largest single-span structure built up to that time.[14] The frontage of the station is formed by St Pancras Chambers, formerly the Midland Grand Hotel (by George Gilbert Scott, 1868–1877), an impressive example of Victorian gothic architecture.
St Pancras station occupies a site orientated north south, deeper than it is wide. The south of the site is bounded by the busy Euston Road, with the frontage along that road provided by the former Midland Grand Hotel. Behind the hotel, the main Barlow train shed is elevated 5 m (17 ft) above street level, with the area below forming the station undercroft. To the west the station is bounded by Midland Road, with the British Library on the other side of the road. To the east the station is bounded by Pancras Road, with King's Cross station on the far side of the road. To the north-east is King's Cross Central, formerly known as the Railway Lands, a complex of intersecting railway lines crossed by several roads and the Regent's Canal.[15][16]
St Pancras contains four groups of platforms, spread across two levels and separately vertically by the main concourse in-between at ground level. The below-surface group contains two through-platforms (A–B). The upper deck contains three groups of terminal-platforms: two groups of domestic platforms (1–4 and 11–13), arranged one each side of the international platforms (5–10). Platforms A–B and 1–4 connect to the Midland Main Line one kilometre north of the station, while platforms 5–10 and 11–13 lead north to High Speed 1; there is no connection between the two railway lines, except for a maintenance siding outside the station.
The international platforms used by Eurostar extend a considerable distance southwards into Barlow's train shed, whilst the other platforms terminate at the southern end of the 2005-era extension. The longer international platforms do not occupy the full width of the Barlow train shed, and sections of the floor area have been opened up to provide natural light to the newer ground-level concourse below. Arrival and departure lounges lie below these platforms, and are accessed from the international concourse. This concourse area, known as The Arcade was fashioned from the original station undercroft and runs the length of the Barlow train shed, to the western side of the arrival and departure lounges. The southern end of the international concourse links to the western ticket hall of King's Cross St. Pancras tube station.[16][17][18]
The various domestic service platforms, both above and below ground level, are accessed via a street-level domestic concourse, named The Market, that runs east to west at the point where the old and new parts of the station meet—the domestic and international concourses meet at a right angle, forming a 'T' shape. The main pedestrian entrance to the station is at the eastern end of this domestic concourse where a subway tunnel leads under the ground for pedestrians to reach King's Cross station and the northern ticket hall for the shared tube station.[16][18]
At the south end of the upper level of the station, a 9-metre (30 ft) high, 20-tonne bronze statue named The Meeting Place stands beneath the station clock. Designed by British artist Paul Day, it is intended to evoke the romance of travel through the depiction of a couple locked in an amorous embrace.[19] The sculpture received a mixed critical reception, but it was Day's 2008 addition of a bronze relief frieze around the plinth which caused the most controversy.[20] Originally depicting a commuter falling into the path of an Underground train driven by the Grim Reaper, Day revised the freize before the final version was installed.[21]
Also on the upper level, above the Arcade concourse, stands a bronze statue of the former Poet Laureate Sir John Betjeman, gazing in apparent wonder at the Barlow roof, designed by British sculptor Martin Jennings. The monument to Betjeman commemorates the poet's successful campaign to save St Pancras station from demolition in the 1960s.[22][23] The 2-metre (6 ft 7 in)-high statue stands on a flat disc of Cumbrian slate inscribed with lines from Betjeman's poem Cornish Cliffs:
“ | And in the shadowless unclouded glare / Deep blue above us fades to whiteness where / A misty sea-line meets the wash of air. | ” |
Other quotes from his poetry are inscribed on discs laid in the floor around the statue.[24]
The station was commissioned by the Midland Railway. Before the 1860s, the company had a concentration of routes in the Midlands and north of London but not its own route to the capital. From 1840, Midland trains to and from London ran from Euston using the London and North Western line via a junction at Rugby. Congestion and delays south of Rugby quickly became commonplace as services expanded.
A new London line was proposed around 1845, towards the end of the period of speculation later dubbed "Railway Mania". The Great Northern line was approved by Parliament in 1846 and a Midland Railway spur from Leicester to Hitchin was agreed in 1847. While the Great Northern line was constructed, the Midland spur was quietly abandoned in 1850 due to financial problems. Pressure from businesses in Leicestershire, Northamptonshire and Bedfordshire (notably from William Whitbread, who owned roughly 12% of the land over which the line would run) revived the spur scheme. The line was re-presented to Parliament and approved in 1853. Building began quickly but did not proceed at any great pace: the line was opened in mid-1857. The Midland Railway secured initial running power for seven years at a minimum of £20,000 a year (£1,370,000 as of 2011),[25]. The Midland Company now had two routes into London, through Euston and King's Cross, and traffic quickly expanded to take advantage, especially with the coal trade, with the Midland Railway transporting around a fifth of the total coal to London by 1852.
In mid-1862, due to the enormous traffic for the second International Exhibition, the Great Northern and the Midland companies clashed over the restricted capacity of the line. This was the stimulus for the Midland Company to build its own line, and surveying for a 49.75-mile (80 km) long line from Bedford to London began in October 1862. To provide a site for a station, the Midland Company had been buying large portions of land in the parish of St Pancras since 1861.
St Pancras was an unprepossessing district, with notorious slums. The area's other landmarks were the covered River Fleet, Regent's Canal, a gas-works owned by the Imperial Gas Company (shortly to become the Gas Light and Coke Company), St Pancras Old Church (after which the district is named), and St Luke's church with a large graveyard. For the terminus the Midland Railway chose a site on New Road (later Euston Road) a few hundred yards to the east of Euston and immediately to the west of King's Cross station. The initial plan was to take the station's approach tracks under the canal in a tunnel, as was done for those entering King's Cross station, although the churchyard and the gas-works were added problems. (Thomas Hardy, then a junior architect before he turned to literature, supervised the exhumations). The site was occupied by housing, the estates of Somers Town and the slums of Agar Town. The landlords sold up for £19,500 and cleared out the residents, without compensation, for a further £200. St Luke's was demolished and a replacement built for £12,000 in 1868–69 in Kentish Town. The demolished church was re-erected piece by piece in 1867 as a Congregational church in Wanstead, and still exists (now a United Reformed church).
The company intended to connect from the site through a tunnel (the St Pancras Branch) to the new Metropolitan Line, opened in 1863 running from Paddington to Farringdon Street below the Euston Road, providing for a through route to Kent.
The Midland Railway directors were determined to impress London with their new station, although the sloping and irregular form of the site posed certain problems. They could see the ornateness of Euston station, with its famous arch; the functional success of Lewis Cubitt's King's Cross station; the design innovations in iron, glass and layout by Brunel at Paddington; and, significantly, the single span roof designs of John Hawkshaw being built at Charing Cross and Cannon Street.
The initial plan of the station was laid out by William Henry Barlow, the Midland's consulting engineer. Barlow persuaded the company to modify its original plans, raising the station 6 metres (20 ft) on iron columns, thus providing a usable undercroft space and also allowing the approach tracks to cross the Regent's Canal on a bridge rather than in a tunnel. The single span 74-metre (243 ft) wide roof was a collaboration between Barlow and Rowland Mason Ordish and was the greatest built up to that time. It allowed the station to make maximum use of the space beneath without obstructions. A space for a fronting transverse hotel was included in the plan and the overall plan was accepted in early 1865.[26]
A competition was held for the design of the station buildings and hotel in May 1865. Eleven architects were invited to compete, submitting their designs in August. In January 1866 the brick Gothic revival designs of the prominent George Gilbert Scott were chosen. There was some disquiet at the choice, in part because Scott's designs, at £315,000, (£21.4 million as of 2011),[25] were by far the most expensive. The sheer grandeur of Scott's frontage impressed the Midland Railway directors, achieving their objective of outclassing all the other stations in the capital. A subsequent financial squeeze trimmed several floors from the frontage and certain ornateness but the impressive design largely remained.
Construction of the station, minus the roof which was a separate tender, was budgeted at £310,000, and after a few problems Waring Brothers' tender of £320,000 was accepted. The roof tender went to the Butterley Company for £117,000. Work began in the autumn of 1864 with a temporary bridge over the canal and the demolition of Somers Town and Agar Town. Construction of the station foundations did not start until July 1866 and delays through technical problems, especially in the roof construction, were commonplace.
The graveyard posed the initial problems - the main line was to pass over it on a girder bridge and the branch to the Metropolitan under it in a tunnel. Disturbance of the remains was expected but was, initially, carelessly handled. The tunnelling was especially delayed by the presence of decomposing human remains, the many coffins encountered, and a London-wide outbreak of cholera leading to the requirement to enclose the River Fleet entirely in iron. Despite this the connection was completed in January 1867.
The company was hoping to complete most essential building by January 1868. The goods station in Agar Town received its first train in September 1867, but passenger services through to the Metropolitan Railway did not begin until July 1868. Although not finished, the station opened, to little ceremony, on 1 October. The final rib for the trainshed roof had been fitted only in mid-September and the station was a mass of temporary structures for the passengers. The first train, an express for Manchester, ran non-stop from Kentish Town to Leicester - the longest non-stop run in the world at 97 miles (156 km).
The undercroft of the station was used to store beer barrels brought by train from Burton-upon-Trent, a major brewing town served by the Midland Railway.
Work on the Midland Grand Hotel did not begin until mid-1868. Designed by architect George Gilbert Scott and with construction in a number of stages, the hotel did not open to customers until 5 May 1873. The process of adding fixtures and fittings was contentious as the Midland Railway cut Scott's perceived extravagances and only in late 1876 was Scott finally paid off. The total costs for the building were £438,000, (£28.8 million as of 2011),[25] . The hotel building initially appears to be in a polychromatic Italian Gothic style – inspired by John Ruskin's Stones of Venice – but on a closer viewing, it incorporates features from a variety of periods and countries. From such an eclectic approach, Scott anticipated that a new genre would emerge.[27][28]
Following construction, services were provided by the Midland Railway. This was a period of expansion as the major routes to Manchester, Nottingham, Sheffield and Carlisle opened.
The 20th century did not, on the whole, serve St Pancras station well. The Railways Act of 1921 forced the merger of the Midland with the London and North Western Railway (LNWR) into the London, Midland and Scottish Railway (LMS), and the LMS adopted the LNWR's Euston station as its principal London terminus. The Midland Grand Hotel was closed in 1935, and the building was subsequently used as offices. During the Second World War, bombing inflicted damage on the train shed, which was only partially reglazed after the war.[29]
At the creation of British Railways in 1948, the previous LMS services continued to run. Destinations included the London area services to North Woolwich, St Albans and Bedford. Long-distance services reached Glasgow, Leeds, Nottingham, Sheffield and Manchester, with famous named trains including:
From 1960 to 1966, electrification work on the West Coast Main Line between London and Manchester saw a new Midland Pullman from Manchester to St Pancras. These trains and those to Glasgow were withdrawn following the completion of the rebuilding of Euston and the consolidation of these services.
By the 1960s, St Pancras station had come to be seen as redundant, and several attempts were made to close the station and demolish the hotel (by then known as St Pancras Chambers). These attempts provoked strong and successful opposition, with the campaign led by the later Poet Laureate, John Betjeman.[22][30]
After the sectorisation of British Rail in 1986, mainline services were provided to the East Midlands by the InterCity sector (Midland Division), with London suburban services to St Albans, Luton and Bedford being provided by Network SouthEast.[31] It was during this period (in 1988) that the Snow Hill tunnel re-opened resulting in the creation of the Thameslink route and the resultant diversion of the majority of suburban trains on to the new route. However, the station continued to be served by trains running on the old Midland main line to Leicester, Nottingham and Sheffield, together with a few suburban services to Bedford and Luton. This constituted only a few trains an hour and left the station underused and largely empty.[29]
Following the privatisation of British Rail, the long-distance services from St Pancras were franchised to Midland Mainline, a train operating company owned by the National Express Group, starting on 28 April 1996. The few remaining suburban trains still operating into St Pancras were operated by the Thameslink train operating company, owned by Govia, from 2 March 1997.[32]
Midland Mainline had initial plans for regular trains from St Pancras to Newcastle and Manchester but these were quickly and quietly dropped. A handful of trains to and from Leeds were introduced, mainly because the High Speed Train sets were maintained there and were already running the route empty north of Sheffield. During the 2000s major rebuild of the West Coast Main Line, St Pancras again hosted trains to Manchester, this time via the Hope Valley route, under the title of Project Rio.[33]
The original plan for the Channel Tunnel Rail Link (CTRL) involved a tunnel from somewhere to the south-east of London, and an underground terminus in the vicinity of Kings Cross station. However a late change in the plans, principally driven by the then Secretary of State for the Environment Michael Heseltine's desire for urban regeneration in east London, led to a change of route, with the new line approaching London from the east. This opened the possibility of reusing the largely redundant St Pancras station as the terminus, with access via the North London Line that crosses the throat of the station.[29][34]
The idea of using the North London line proved illusory, and it was rejected in 1994 by the then transport secretary, John MacGregor, as difficult to construct and environmentally damaging. However the idea of using the under used St Pancras station as the core of the new terminus was retained, albeit now linked by 12.4 miles (20 km) of specially built tunnels to Dagenham via Stratford.[29][34]
London and Continental Railways (LCR), which was created at the time of British rail privatisation, was selected by the UK government in 1996 to undertake the reconstruction of St Pancras, the construction of the CTRL and to takeover the British share of the Eurostar operation, Eurostar (UK). LCR has had ownership of St Pancras station since the privatisation of British Rail in order to allow for the station's redevelopment to take place. Financial difficulties in 1998, and the collapse of Railtrack in 2001, caused some revision of this plan, but LCR retain ownership of St Pancras station.[3]
The design and project management of reconstruction was undertaken, on behalf of LCR, by Rail Link Engineering (RLE), a consortium of Bechtel, Arup, Systra and Halcrow. The original reference design for the station was by Nick Derbyshire, the former head of British Rail's in-house architecture team. The master plan of the complex was by Foster and Partners, whilst the lead architect of the reconstruction was Alistair Lansley, a former colleague of Nick Derbyshire recruited by RLE.[16][35][36]
In order to accommodate the unusually long Eurostar trains, and to provide capacity for the existing domestic trains to the Midlands and the proposed domestic services on the high speed rail link, the existing station train shed was extended a considerable distance northwards, by a new flat roofed shed. The station was planned to feature 13 platforms under this extended train shed. Services to the East Midlands would use the western platforms, Eurostar services would use the middle platforms, and domestic high-speed services to Kent would occupy the eastern platforms. The Eurostar and one of the Midland platforms would extend back into the Barlow train shed. Access to the Eurostar platforms for departing passengers would be via a departure suite on the west side of the station, and then to the platforms by a bridge above the tracks within the historic train shed. Arriving Eurostar passengers would leave the station by a new concourse at the north end of the station.[34]
This original design was later modified, with access to the Eurostar platforms from below, utilising the station undercroft and allowing the deletion of the visually intrusive access bridge. By dropping the extension of any of the Midland platforms into the Barlow train shed, space was freed up to allow wells to be constructed in the station floor, which provided natural daylight and access to the undercroft.[34]
Shortly before the station rebuild commenced, the overhead wiring used by the electric suburban trains was removed. As a consequence, all suburban trains from Bedford and Luton were diverted to King's Cross Thameslink and beyond, and the Thameslink train operating company ceased to serve St Pancras for a period. (In fact these trains only used St Pancras if there was engineering work further south on the Thameslink line.)
By early 2004, the eastern side of the extended train shed was complete, and the Barlow train shed was closed to trains.[37] From 12 April 2004, Midland Mainline trains terminated at an interim station occupying the eastern part of the extension immediately adjacent to the entrance.[38]
As part of the construction of the western side of the train shed extension, which now began, a new underground 'box' was constructed on the Thameslink route, which at this point ran partially under the extended station. This box was intended to eventually house new platforms for the Thameslink service. In order for this to happen, the existing Thameslink tunnels between Kentish Town and King's Cross Thameslink had to be closed between 11 September 2004 and 15 May 2005 while the works were carried out. As a result, Thameslink services from the north terminated in the same platforms as the Midland Mainline trains, while services from the south terminated at King's Cross Thameslink.[39]
After the blockade of the route was over, the new station box was still only a bare concrete shell, and could not take passengers. Thameslink trains reverted to their previous route, but ran through the station box without stopping. The budget for the Channel Tunnel Rail Link works did not include work on the fitting-out of the station, as these works had originally been part of the separate Thameslink 2000 works programme. Despite lobbying by rail operators who wished to see the station open at the same time as St Pancras International, the Government failed to provide additional funding to allow the fit out works to be completed immediately following the line blockade. Eventually, on 8 February 2006, Alistair Darling, the then Secretary of State for Transport, announced £50 million worth of funding for the fit-out of the station, plus another £10-15 million for the installation of associated signalling and other lineside works in the area.[39][40][41]
The fitout works were designed by Chapman Taylor (Retail) and Arup (Eurostar) and completed by ISG Interior Plc Contractors collaborating with Bechtel as Project Managers.
In 2005 planning consent was granted for a refurbishment of the former Midland Grand Hotel building, which will be refurbished and extended as a hotel and apartment block.[42][43]
By the middle of 2006, the western side of the train shed extension was completed, and on 14 July 2006 the Midland Mainline trains moved from their interim home on the east side to their ultimate home on the west side of the station.
According to a BBC Two series broadcast in November 2007, the rebuilding cost was in the region of £800 million,[44] up from an initial estimate of £310 million.[45]
In early November 2007 Eurostar conducted a testing programme in which some 6000 members of the public were involved in passenger check-in, immigration control and departure trials, during which the 'passengers' each made three return journeys out of St Pancras to the entrance to the London tunnel. On 4 September 2007, the first test train ran from Paris Gare du Nord to St Pancras.[46] Children's illustrator Quentin Blake was commissioned to provide a huge mural of an "imaginary welcoming committee" as a disguise for one of the remaining ramshackle Stanley buildings immediately opposite the station exit.[47]
St Pancras station was officially re-opened as St Pancras International, and the High Speed 1 service launched, on 6 November 2007, by The Queen and The Duke of Edinburgh.
During an elaborate opening ceremony, actor Timothy West, as Henry Barlow, addressed the audience, which was also entertained by the Royal Philharmonic Orchestra and the singers Lemar and Katherine Jenkins. In a carefully staged piece set-piece, the first Class 395 train set and two Eurostar train sets arrived through a cloud of dry ice in adjacent platforms within seconds of each other.[48][49] During the ceremony, Paul Day's large bronze statue, The Meeting Place, was also unveiled.
At a much smaller ceremony on 12 November 2007, the bronze statue of John Betjeman by sculptor Martin Jennings was unveiled by Betjeman's daughter, the author Candida Lycett Green.[50]
Public service by Eurostar train via the completed High Speed 1 route started on 14 November 2007. In a small ceremony, station staff cut a ribbon leading to the Eurostar platforms.[51] In the same month that the station opened, the station's traditional services to the East Midlands were transferred to a new franchisee, East Midlands Trains.[52]
The low-level platforms for the Thameslink services opened on 9 December 2007, replacing King's Cross Thameslink station. Since Thameslink trains had last used St Pancras station, the franchise had changed hands (on 1 April 2006) and services are now operated by First Capital Connect.[53]
A pedestrian subway was built during the St Pancras station extension. The subway runs under Pancras Road from the eastern entrance of the St Pancras domestic concourse; it was designed to connect to the new northern ticket hall for the King's Cross St. Pancras tube station (opened November 2009), and a future new concourse for King's Cross railway station.
Since 11 November 2007, St Pancras (domestic) platforms 1–4 provide the southern terminus for services on the Midland Main Line operated by East Midlands Trains, with routes to the East Midlands and Yorkshire regions of England. Towns and cities served include Luton, Bedford, Wellingborough, Kettering, Market Harborough, Leicester, Corby, Loughborough, Nottingham, Derby, Chesterfield and Sheffield. Occasional trains also run to Oakham, Melton Mowbray, Newark, Lincoln, Dronfield, Doncaster, Wakefield, Leeds, York and Scarborough.[10]
As of March 2010[update], the timetable has five off-peak services per hour; three fast and two semi-fast.[10]
Service Pattern | Destination | Calling At | Main Stock | Journey Time |
---|---|---|---|---|
XX:00 | Corby | Luton, Bedford, Wellingborough, Kettering | 222 | 1hr 40mins |
XX:15 | Nottingham | Market Harborough, Leicester, East Midlands Parkway | HST | 1hr 44mins |
XX:25 | Sheffield | Leicester, Loughborough, East Midlands Parkway, Long Eaton, Derby, Chesterfield | 222 | 2hr 27mins |
XX:30 | Nottingham | Luton Airport Parkway, Bedford, Wellingborough, Kettering, Market Harborough, Leicester, Loughborough, Beeston | 222 | 1hr 56mins |
XX:55 | Sheffield | Leicester, Derby, Chesterfield | 222 | 2hr 7mins |
On 9 December 2007, as part of the Thameslink Programme, St Pancras International gained platforms on the Thameslink network operated by First Capital Connect (FCC), replacing the King's Cross Thameslink station to the south-east. In line with the former station, the Thameslink platforms are designated A and B.[54][55] The new station has met with some criticism due to the length of the walking route from the Thameslink platforms to the underground when compared to King's Cross Thameslink.[56] The Thameslink Programme involves the introduction of 12-car trains across the enlarged Thameslink network, and as extending the platforms at the existing King's Cross Thameslink station was thought impractical (requiring alterations to the Clerkenwell tunnel and the Circle/Hammersmith & City/Metropolitan Underground lines, which would be extremely disruptive and prohibitively expensive),[57] a new Thameslink station was proposed, to be situated under the existing St Pancras station.
The station allows passengers to travel to such destinations as Bedford, Luton and St Albans in the north, and to Wimbledon, East Croydon and Brighton in the south. There are also direct services to London Gatwick and London Luton airports. When completed, the Thameslink Programme will enlarge the Thameslink network more than threefold from 50 to 172 stations.[58]
After the bay platforms at London Blackfriars closed in March 2009 for the station's reconstruction, Southeastern services which previously terminated at Blackfriars were extended to Kentish Town (off-peak), or to St Albans, Luton or Bedford (peak hours), calling at this station.[59] Trains services south of Blackfriars are operated by Southeastern, north of Blackfriars by First Capital Connect.
Southeastern runs high-speed domestic services (Class 395) at 140 mph (230 km/h) on High Speed 1 tracks and up to 100 mph (160 km/h) on standard tracks in Kent, allowing passengers from Ashford International to travel to London in 36 minutes.[60] High-speed services go to Strood, Chatham, Gravesend, Sittingbourne, Margate, Ramsgate, Dover Priory, Folkestone Central, Ashford, Ebbsfleet International, Stratford International and other destinations in Kent.
The first domestic service carrying passengers over High Speed 1 ran on 12 December 2008, to mark one year before regular services were due to begin. This special service, carrying various dignitaries, ran from Ashford International to St Pancras.[61] Starting in June 2009, Southeastern provided a preview service between London St Pancras and Ebbsfleet, extending to Ashford International during peak hours.[62] On 7 September 2009 Southeastern extended the peak-time services to Dover and Ramsgate.[63] On 21 November 2009, the preview service was introduced to Faversham. The full service began on 13 December 2009.
Service Pattern | Destination | Calling At | Journey Time |
---|---|---|---|
XX:12 | Dover Priory | Stratford International, Ebbsfleet International, Ashford International, Folkestone West, Folkestone Central | 1hr 9mins |
XX:25/28 | Faversham | Stratford International, Ebbsfleet International, Gravesend, Strood, Rochester, Chatham, Gillingham (Kent), Rainham (Kent), Sittingbourne | 1hr 05mins |
XX:42 | Margate | Stratford International, Ebbsfleet International, Ashford International, Canterbury West, Ramsgate, Broadstairs | 1hr 28mins |
XX:55 | Faversham | Stratford International, Ebbsfleet International, Gravesend, Strood, Rochester, Chatham, Gillingham (Kent), Rainham (Kent), Sittingbourne | 1hr 05mins |
The full Eurostar timetable from St Pancras came into operation on 9 December 2007. The basic service provides 17 pairs of trains to and from Paris Gare du Nord every day, 10 pairs of trains to and from Bruxelles-Midi/Brussel-Zuid, and one train to and from Marne-la-Vallée for Disneyland Paris. Extra services run to Paris on Fridays and Sundays, with a reduced service to Brussels at weekends. Additional weekend leisure-oriented trains also run to the French Alps during the skiing season, and to Avignon in the summer.[64][65]
Trains observe a mixture of calls at four intermediate stations (Ebbsfleet International, Ashford International, Calais-Fréthun and Lille-Europe), with some trains running non-stop. Non-stop trains take 2 hours 15 minutes to Paris, and just under 1 hour 50 minutes to Brussels, other trains taking 5 or 10 minutes longer depending on whether they make one or two stops.[64][65]
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Terminus | East Midlands Trains
Midland Main Line
|
Leicester
|
||
Luton Airport Parkway
|
||||
Market Harborough
|
||||
Luton
|
||||
Terminus | Eurostar
High Speed 1
|
Ebbsfleet International
|
||
Ashford International
|
||||
Farringdon
|
First Capital Connect
Thameslink
|
Kentish Town
|
||
St Albans City
|
||||
West Hampstead Thameslink
|
||||
Terminus | Southeastern
High Speed 1
|
Stratford International
|
Platforms | Designation | Operator | Destinations |
---|---|---|---|
1–4 | MML Domestic | East Midlands Trains | Corby, Leicester, Nottingham, Derby, Lincoln, Sheffield, Leeds etc. |
5–10 | HS1 International | Eurostar | Lille, Paris and Brussels |
11–13 | HS1 Domestic | Southeastern | Chatham, Faversham, Ashford, Folkestone, Dover, Ramsgate and Margate |
A-B | Thameslink | First Capital Connect | North to: St Albans, Luton and Bedford South to: Sutton, Sevenoaks and Brighton |
A five-star hotel to be operated by Marriott International will occupy parts of the original hotel, including the main public rooms, together with a new bedroom wing on the western side of the Barlow trainshed. Opening of the Marriott Renaissance St Pancras, originally scheduled for 2009, has been delayed to 2011. The apartments, which are being developed by the Manhattan Loft Corporation, will occupy the majority of the upper floors of the main block of the original hotel.[42][43][66][67]
During the 2012 Summer Olympics in London, St Pancras International will be the terminus for the Olympic Javelin service, a seven-minute duration shuttle train service designed to ferry spectators between the London Olympic Park in Stratford and Central London.[68]
In January 2010, the European railway network was opened to liberalisation that will allow greater competition.[69] Both Air France-KLM and Deutsche Bahn have expressed interest in taking advantage of the new laws to run new services via High Speed 1 terminating at St Pancras.[70][71][72]
In December 2009 Deutsche Bahn received permission to run Intercity-Express (ICE 3M) trains through the Channel Tunnel after a safety requirement to have splittable passenger trains was lifted. Deutsche Bahn had previously expressed a desire to run through trains between London and Germany.[73][74][75] Direct rail services between St Pancras and Cologne Central station could start before the 2012 Olympics;[76] also, Deutsche Bahn could start high-speed train services from St Pancras to Frankurt Main by December 2012, Eurotunnel has announced.[77]
In February 2010, the idea of a Transmanche Metro service gained support as local councillors in Kent and Pas-de-Calais announced that they were in talks to establish a frequent 'metro' service between London and Lille stations. The service would start at Lille Europe and call at Calais, Ashford International and Stratford International before reaching St Pancras. Since High Speed 1 opened, Ashford and Calais have an infrequent service and, as mentioned above, Eurostar trains do not call at Stratford International. It is hoped the service would be running by 2012 in time for the London Olympics.[78]
From December 2016, as part of the Thameslink Programme, services from the East Coast Main Line/Great Northern Route (also part of the First Capital Connect franchise) will be linked to the Thameslink route, diverting certain services previously terminating at Kings Cross to St Pancras' Thameslink platforms and then south through central London to new south London destinations.[79]
King's Cross St Pancras tube station is the station on the London Underground serving both King's Cross and St Pancras main line stations in the London Borough of Camden. It is in Travelcard Zone 1.[80]
Major work is ongoing at King's Cross St Pancras tube station to link the various station entrances to two new ticket halls for London Underground and reduce overcrowding.[81][82]
Preceding station | London Underground | Following station | ||
---|---|---|---|---|
Euston Square
towards Hammersmith
|
Circle line |
Farringdon
towards Edgware Road
|
||
Euston Square
towards Hammersmith
|
Hammersmith & City line |
Farringdon
towards Barking
|
||
Euston Square
towards Amersham, Chesham, Uxbridge
or Watford |
Metropolitan line |
Farringdon
towards Aldgate
|
||
Euston
towards Edgware, Mill Hill East
or High Barnet |
Northern line |
Angel
towards Morden
|
||
Russell Square
towards Uxbridge or Heathrow Airport
(Terminal 4 or Terminal 5) |
Piccadilly line |
Caledonian Road
towards Cockfosters
|
||
Euston
towards Brixton
|
Victoria line |
Highbury & Islington
towards Walthamstow Central
|
|
|