Kuala Lumpur International Airport

Kuala Lumpur International Airport
Lapangan Terbang Antarabangsa
Kuala Lumpur
KLIA Logo.png
KLIA MTB&Tower.jpg
The KLIA control tower and part of the airport
IATA: KULICAO: WMKK
Summary
Airport type Public
Owner Government of Malaysia
Operator Malaysia Airports (Sepang) Sdn Bhd
Serves Kuala Lumpur, West Malaysia
Location Sepang, Selangor, West Malaysia
Hub for
Built 27 June 1998
Elevation AMSL 71 ft / 21 m
Website www.klia.com.my
Runways
Direction Length Surface
ft m
14L/32R 13,530 4,124 Concrete
14R/32L 13,288 4,056 Concrete
Statistics (2009)
Passenger movements 29,682,093
Airfreight movements in tonnes 584,559[1]
Aircraft movements 225,251

Kuala Lumpur International Airport (IATA: KULICAO: WMKK) commonly known as KLIA is one of Southeast Asia's major aviation hubs. It is also Malaysia's main international airport. It is situated in the Sepang district, in the south of the state of Selangor, about 50 kilometres (31 mi) from the capital city, Kuala Lumpur. KLIA was built at a cost of about RM8.5 billion or US$3.5 billion.[2]

Kuala Lumpur International Airport is capable of handling 35 million passengers and 1.2 million tonnes of cargo a year in its current phase. As of 2006, it was ranked as the 13th busiest airport in the world by international passenger traffic, and is the 7th busiest international airport in Asia. The complex handled 26,938,970 passengers in 2007, a 13.0% increase over 2005. In 2008, Kuala Lumpur International Airport handled 667,495 metric tonnes of cargo, which is a 2.2% increase compared to 2007. The increase in cargo volume made Kuala Lumpur International Airport the 27th busiest airport by cargo traffic.[1] Also, KLIA was awarded a prestigious 4-star ranking by Skytrax, along with Zürich Airport and Amsterdam Airport Schiphol.

The airport is operated by Malaysia Airports (MAHB) Sepang Sdn Bhd and is the airline hub or home base for Malaysia Airlines, MASkargo, AirAsia and AirAsia X. KLIA is also the stopover point on the kangaroo route for Malaysia Airlines.

Kuala Lumpur International Airport serves the Klang Valley Metropolitan Region, Greater Klang Valley, Shah Alam, Malacca, Negeri Sembilan, Selangor and South Perak. With the large catchment area, the airport has become one of the key economic strengths for the nation, where it is well connected via expressways to all parts of Peninsular Malaysia, highly industrialized areas like Shah Alam, and the information and communications technology hub, the Multimedia Super Corridor. It is one of the important components in the economy of Malaysia, as the airport is the main import-export center for the country.

The IATA airport code, KUL was inherited from the previous international gateway for Malaysia, Subang International Airport, which currently handles only turboprop aircraft, general aviation and houses a military air base.

Contents

History

Satellite Terminal

The planning of KLIA began in 1990 when the government decided that the existing Subang International Airport (now Sultan Abdul Aziz Shah Airport) could not handle future demand. Malaysia's Former Prime Minister Mahathir bin Mohamad was a prime driver behind the project, which was seen as an important component of the Multimedia Super Corridor.

After the move to KLIA, Subang Airport's Terminal 1 building was demolished. In 2007 however, Malaysia Airports entered into agreement to redevelop Terminal 3 of the then Subang Airport and is currently undergoing major transformation to become Subang Skypark, an integrated airport for turboprop and chartered planes surrounded by residential area and business park.

With the airport site spanning 100 km2,[2] it is one of the largest airport sites in the world. It is built on a piece of agricultural land and required no demolition of private property. The master plan of Kuala Lumpur International Airport involves constructing five runways, and two terminals accompanied by two satellite terminals for each terminal over three phases.[3] Phase One development includes constructing one main terminal accompanied by one satellite terminal that is enough to accommodate 25 million passengers and dual full service runways. Under the implementation of Phase One, sixty contact piers, twenty remote parking bays with eighty aircraft parking positions, four maintenance hangars and fire stations will be built. Implementation of phase two and three will be expansions of the airport to include increasing number of passengers.[3] Ultimately, the airport will be able to handle 100 million passengers per annum once all three phases are implemented.[3]

With the workforce of 25,000 workers working 24 hours a day, the airport was built within four and half years.[2] The airport was officially inaugurated public grand information completed renovated opened since on 27 June 1998, a week ahead of Hong Kong International Airport, but flights were shifted from Subang only three days later on June 30 in time for the 1998 Commonwealth Games. The first domestic arrival was Malaysia Airlines flight MH1263 from Kuantan (Kuantan Airport) at 7:10 am and first international passenger jet arrival was Malaysia Airlines flight MH188 from Malé (Malé International Airport) at 7:30 am while the first domestic departure was Malaysia Airlines flight MH1432 to Langkawi (Langkawi International Airport) at 7:20 am and first international passenger jet departure was Malaysia Airlines flight MH84 to Beijing (Beijing Capital International Airport) at 9am.[4]

Check-in counters

The inauguration of the airport was marked with problems. Aerobridge and bay allocation systems broke down, queues formed throughout the airport, and baggage handling broke down, with lost bags and waits of over five hours.[5] Most of these issues were sorted out eventually, but the baggage handling system continued to be plagued with problems, and it was finally put up for a new complete replacement tender in 2007.

The airport also had to contend with the East Asian financial crisis, SARS, bird flu epidemic (Avian flu), the global financial crisis and recently the swine flu pandemic which decimated passenger traffic in Malaysia and the region. Passenger growth was negative during the financial crisis and airlines that had started flights to KLIA including All Nippon Airways, British Airways, Lufthansa (later reinstated) and Northwest Airlines, terminated their services due to unprofitability. The first phase of the airport was designed with a capacity of 25 million passengers per year but on the first full year of operations in 1999, it saw only 13.2 million.[6] However, traffic did eventually increase with 21.1 million passengers recorded in 2004 and 23.2 million in 2005 — although this, too, fell short of the original estimate of 25 million by the year 2003.

The name Kuala Lumpur International Airport (KLIA) was previously used as an alternative name for the then Subang International Airport which is now known as Subang International Airport (SIA) (now Sultan Abdul Aziz Shah Airport (SZB)) in Subang.

Operations and infrastructure

Infrastructure
Passenger terminal buildings
Totals (current) (After LCCT Relocation)
Floor area 514,694 m2 Unknown m²
Handling capacity 40 million passengers 55 million passengers
Parking bays 46 (aerobridge)
68 (contact)
21 (remote)
LCCT Relocation Plan yet to be unveiled
Main Terminal Building 1 & Contact Pier
Opened 27 June 1998 (operational)
Floor area 336,000 m2
Handling capacity 5 million passengers per annum
Parking bays 20 (aerobridge)
23 (remote)
Satellite Terminal A
Opened 27 June 1998 (operational)
Floor area 143,404 m2
Handling capacity 20 million passengers per annum
Parking bays 26 (aerobridge)
15 (remote)
Low Cost Carrier Terminal
Opened 23 March 2006 (operational)
Floor area 35,290 m2
Handling capacity 15 million
Parking bays 30
New Low Cost Carrier Terminal
Opened Under Planning
Floor area Under Planning
Handling capacity 30 million
Parking bays Under Planning
Bunga Raya Complex
Opened 27 June 1998 (official)
Floor area
Handling capacity
Parking bays 1

KLIA features a number of modern design features that assist in efficient operation of the airport.

Terminals

The Passenger Terminal Complex (PTC) was built with an emphasis on allowing natural light into the building. Thus, there is a huge expanse of glass throughout the building, and the spectacular roof has cut-outs for natural light to filter in. The PTC comprises three buildings - the Main Terminal Building, the Satellite Building and the Contact Pier. Besides the 80-room hotel at the Satellite Building, there is a 450-room 5-star Pan Pacific KLIA hotel a 10 minute (indoor) walk away. Shopping spots are available in an area encompassing 85,000 square metres. Currently, the retail space at the Kuala Lumpur International Airport stands at 63,644 square metres (685,060 sq ft). The airport operator plans to increase the retail space to 103,251 square metres (1,111,380 sq ft), an 62.2% increase in retail space. Malaysia Airports's retail arm Eraman will boost retail shops to 277 from 242 and add more food and beverage outlets to 99 from 88 presently.[7]

As there are international flights operating out from the airport, therefore terminals of the airport are equipped with immigration processing facilities and security scanning for all passengers including domestic passengers. The Satellite terminal handles most of the international flights, while the main terminal building's contact pier handles domestic traffic, regional international flights and international flights routed to other hubs within Malaysia. Malaysia Airlines operate from both terminals, where main terminal building's contact pier is their preferred terminal for domestic flights. Conversely, low cost carries such as AirAsia Group of Airlines, Tiger Airways and Cebu Pacific operates domestic and international flights out of the low cost carrier terminal.[8]

The initial passenger growth was below average due to Asian Financial Crisis and the outbreak of severe acute respiratory syndrome (SARS) epidemic in 2003 and the airport failed to reach its target capacity of 25 million passengers per annum (before the inclusion of low cost carrier terminal) by 2004. However, the recovery of Malaysia's economy boosted Kuala Lumpur International Airport's passenger movements, and the airport saw significant growth in traffic, hitting the 25 million passenger mark in 2007. In January 2008, the airport saw a growth of 8.3% in aircraft movements and 7.7% in passenger traffic to 2.17 million in January 2008 from 2.02 million in the same period last year.[9]

Main terminal building and contact pier

The Main terminal building or Terminal 1 is located in between the two runways. The floor area of the terminal covers 336,000 square metres and the building consists of 39 square roof units, which enables future expansion of the building. There are a total of 216 check-in counters, located in 6 different islands, identified by the letters A – M (excluding I). Multi check-in services are available, designed for the use of all passengers arriving, departing or in transit. On 2 February, 2007, Malaysia Airports introduces 12 integrated self check-in kiosks (CUSS) for passengers. The first airline to use that system is KLM.[10] A further 24 kiosks will be added later by the airport operator[11][12]

The contact pier is the rectangular-shaped terminal that is connected to the Main Terminal Building. It serves as the domestic terminal for Malaysia Airlines. Some international flights are handled there as well. Previously it used to cater to low-cost carriers' passengers. At the north side of the pier, it can only accommodate narrow-bodied aircraft. In contrast, the south side of the contact pier can accommodate B737 and B747 or similar sized aircraft.

The Malaysia Airports Holding Berhad derives 65% of its total annual revenue from non-aeronautical sources, with 35% from commercial space rental and a percentage of sale receipts . There were plans to increase and maximize the Main Terminal Building's and Contact Pier's retail area however, the plan was postponed due to Visit Malaysia Year 2007.[13]

The gates in Main Terminal Building's contact pier has alphabet prefix of A and B for domestic flights, and G and H for international flights.

Satellite terminal A

The 143,404 square metres (1,543,590 sq ft) satellite building accommodates international flights departing and arriving at KLIA. Passengers have to travel to the satellite building via the Aerotrain. There is a wide array of duty-free shops and prestige brand boutiques in the satellite building. This includes international brands such as Burberry, Harrods, Montblanc, Salvatore Ferragamo and recently, Mango has opened its first boutique at an airport in the Asian region. Among all international labels available within the terminal, some boutiques such as Harrods are only available in the airport. Liquor and perfumes are particularly popular, accounting for over half of total retail sales, followed by watches and tobacco products. A number of restaurants and international airlines' lounges are available as well as an Airside Transit Hotel.

Within the terminal, wireless internet (Wifi) is provided free of charge. The terminal also has prayer rooms, showers and massage service. Various lounge areas are provided, some including children's play areas and movie lounge, broadcasting movie and sport channels such as Star Movies.[14] The terminal also features a natural rainforest in the middle of the terminal, exhibiting the Malaysian forests.

Under Malaysia Airports Berhad retail optimisation plan, the retail space in satellite terminal A will be further optimized to increase its revenue derived from commercial space rental and a percentage of sale receipts to 50% by year 2010 which currently stands at 35%. Some notable improvements that will be seen after the refurbishments will be the Jungle Boardwalk which will be the first of its kind in the world and larger mezzanine floor to accommodate F&B outlets and viewing galleries.[15]

The gates in Satellite Terminal A have the prefix C.The Satellite A terminal has 27 boarding gates altogether.

Low Cost Carrier Terminal (LCCT)

The Main Terminal Building of KLIA from side
Drop off area at the departure hall
Palm trees in the satellite building
Satellite building near the Aerotrain
Interior of the Satellite Terminal
KLIA Low Cost Carrier Terminal
The international departure waiting lounge in LCCT before the 2008 expansion
Malaysian Airlines at Contact Pier

The first purpose built Low Cost Carrier Terminal (LCCT) was specifically built at KL International Airport to cater to the growing passengers of the low cost airlines, especially the passengers of Malaysia's "no-frills" airline, AirAsia. Construction of the LCC Terminal was on a fast-track basis beginning June 2005 at an approximate cost of RM 108 million.[16]

The 35,290 square-meter terminal is designed and built to suit the low cost carrier business model that requires only basic terminal amenities. In order to offer lower landing fees, handling fees and airport taxes, it cuts back on amenities such as aerobridges, elaborate physical structures and decorations in the passenger terminal building. There is no transfer facility to the main terminal. Passengers who need to make transfers need to clear immigration, collect their luggage, clear customs, make their way to the main terminal and re-checkin with the respective airline.

LCCT is located on the opposite side of the apron from the Main Terminal Building, near the air cargo area. By road, LCCT is about 20 km from the Main Terminal Building.

However, the current Low Cost Carrier Terminal is a temporary solution for the increasing demand of no-frills airline passengers. Therefore, Malaysia Airports Holding Berhad has incorporated the plans to build a new permanent LCC terminal which can accommodate 30 million passengers per annum[17] . In the mean time, the airport operator decided to expand the current terminal to cope up with the increasing demand. The new arrival hall was first open on December 15, 2008.[18] This airport was the first airport to have separation between normal carriers and low cost carrier.

The gates in LCCT have alphabet prefix of P for domestic departures and T for international departures.

KL City Air Terminal

KL City Air Terminal, sometimes known as Kuala Lumpur City Air Terminal or KL CAT located at KL Sentral is a virtual extension of KL International Airport where city check-in services are provided. KL City Air Terminal is recognized by International Air Transport Association which carries IATA designation XKL. Currently there are only 4 airlines providing city check-in services, they are Cathay Pacific, Emirates Airline, Malaysia Airlines and Royal Brunei Airlines. However, the situation is due to be changed as 10 SITA's AirportConnect CUTE (Common Use Terminal Equipment) were installed on 10 check-in desks in KL CAT that enables all airlines to offer city check-in service for their passengers.[19] Apart from providing check-in services, the virtual terminal operator, Express Rail Link Sdn Bhd which operates KLIA Express is planning to roll out baggage check-out service in January 2008 whereby passengers only collect their baggage and declare taxable items in Kuala Lumpur City Air Terminal.[20]

Airlines and destinations

Passenger

Airlines Destinations Terminal
AirAsia Alor Setar, Banda Aceh, Bandar Seri Begawan, Bangkok-Suvarnabhumi, Bangalore, Bintulu, Chiang Mai, Chennai, Clark,Cochin,Colombo, Denpasar/Bali, Dhaka, Guangzhou, Guilin, Haikou, Hanoi, Hat Yai, Ho Chi Minh City, Hong Kong, Hyderabad, Jakarta-Soekarno-Hatta, Johor Bahru,Kolkata, Kota Bharu, Kota Kinabalu, Krabi, Kuala Terengganu, Kuching, Labuan, Langkawi, Macau, Makassar, Medan, Miri, Padang, Pekanbaru, Penang, Phnom Penh, Phuket, Sandakan, Shenzhen, Sibu, Siem Reap, Singapore, Solo, Surabaya, Tawau, Thiruvananthapuram, Tiruchirapalli, Yangon, Yogyakarta LCCT
AirAsia X Chengdu, Delhi, Gold Coast, Hangzhou, London-Stansted, Melbourne, Mumbai, Perth, Seoul-Incheon [begins November 1] [21], Taipei-Taoyuan, Tehran-Imam Khomeini, Tianjin, Tokyo-Haneda [begins December 7] [22] LCCT
Air Astana Almaty Satellite
Air China Beijing-Capital Satellite
Air-India Express Chennai, Tiruchirapalli Satellite
Air Mauritius Mauritius, Singapore Satellite
Air Niugini Port Moresby, Singapore Satellite
Air Zimbabwe Beijing-Capital, Harare Satellite
Biman Bangladesh Airlines Dhaka Satellite
Cathay Pacific Airways Hong Kong[note 1] Satellite
Cebu Pacific Manila LCCT
China Airlines Taipei-Taoyuan Satellite
China Southern Airlines Fuzhou, Guangzhou Satellite
China Eastern Airlines Shanghai-Pudong, Zhengzhou Satellite
EgyptAir Cairo Satellite
Emirates Dubai, Melbourne Satellite
Etihad Airways Abu Dhabi Satellite
EVA Air Taipei-Taoyuan Satellite
Garuda Indonesia Jakarta-Soekarno-Hatta, Mataram (Ampenan) Satellite
GMG Airlines Dhaka Satellite
Gulf Air Bahrain Satellite
Indian Airlines Chennai Satellite
Indonesia AirAsia Denpasar/Bali, Bandung, Jakarta-Soekarno-Hatta, Medan, Surabaya LCCT
Iran Air Mashhad, Tehran-Imam Khomeini Satellite
Japan Airlines Tokyo-Narita Satellite
Jet Airways Chennai Satellite
Jetstar Asia Airways Singapore Satellite
KLM Amsterdam, Jakarta Satellite
Korean Air Seoul-Incheon Satellite
Kuwait Airways Kuwait, Jakarta Satellite
Lion Air Jakarta-Soekarno-Hatta Satellite
Lufthansa Bangkok-Suvarnabhumi, Frankfurt Satellite
Mahan Air Shiraz Satellite
Malaysia Airlines Alor Star, Bandar Seri Begawan, Bangkok-Suvarnabhumi, Bintulu, Cebu, Hanoi, Ho Chi Minh City, Jakarta, Johor Bahru, Kaohsiung, Kota Bharu, Kota Kinabalu, Kuantan, Kuala Terengganu, Kuching, Labuan, Langkawi, Manila, Medan, Miri, Penang, Phuket, Sandakan, Sibu, Singapore, Surabaya, Taipei-Taoyuan, Tawau, Tokyo-Narita, Yangon, Yogyakarta Main
Malaysia Airlines Adelaide, Amsterdam, Auckland, Bandung, Bangalore, Bangkok-Suvarnabhumi, Beijing-Capital, Beirut, Brisbane, Buenos Aires-Ezeiza, Cape Town, Chennai, Colombo, Dammam, Delhi, Denpasar/Bali, Dhaka, Dubai, Frankfurt, Guangzhou, Ho Chi Minh City, Hong Kong, Hyderabad, Istanbul-Atatürk, Jakarta-Soekarno-Hatta, Jeddah, Johannesburg, Kaohsiung, Karachi, Kunming, London-Heathrow, Los Angeles, Male, Manila, Melbourne, Mumbai, Osaka-Kansai, Paris-Charles de Gaulle, Perth, Phnom Penh, Rome-Fiumicino, Seoul-Incheon, Shanghai-Pudong, Siem Reap, Sydney, Taipei-Taoyuan, Tokyo-Narita, Xiamen Satellite
Merpati Nusantara Airlines Mataram (Ampenan), Surabaya Satellite
Myanmar Airways International Yangon Satellite
Nepal Airlines Kathmandu Satellite
Oman Air Muscat Satellite
Pakistan International Airlines Karachi, Lahore, Peshawar Satellite
Qatar Airways Doha, Phuket [begins 11 October][23] Satellite
Royal Brunei Airlines Bandar Seri Begawan Satellite
Royal Jordanian Amman-Queen Alia, Bangkok-Suvarnabhumi Satellite
Saudi Arabian Airlines Dammam, Jakarta, Jeddah, Madinah, Riyadh Satellite
Shenzhen Airlines Nanning, Shenzhen, Xi'an Satellite
SilkAir Singapore Satellite
Singapore Airlines Singapore Satellite
SriLankan Airlines Colombo, Singapore Satellite
Thai AirAsia Bangkok-Suvarnabhumi LCCT
Thai Airways International Bangkok-Suvarnabhumi Satellite
Tiger Airways Singapore LCCT
United Airways Dhaka Satellite
Uzbekistan Airways Tashkent Satellite
Vietnam Airlines Hanoi, Ho Chi Minh City Satellite
Xiamen Airlines Fuzhou, Xiamen Satellite
Yemenia Dubai, Jakarta-Soekarno-Hatta, Sana'a Satellite

Note 1: ^ Although some of Cathay Pacific's flights to Hong Kong stop in Penang, Cathay Pacific has no rights to transport passengers between Kuala Lumpur and Penang.

Note 3: ^ Although some of Air Niugini's flights to Port Moresby stop in Singapore, Air Niugini has no rights to transport passengers between Kuala Lumpur and Singapore.

Cargo

Airlines Destinations Terminal
Cargolux Baku, Chennai, Luxembourg, Singapore Cargo
China Airlines Cargo Penang, Taipei-Taoyuan Cargo
China Cargo Airlines Shanghai-Pudong Cargo
Coyne Airways Cargo
DHL Cargo
Eva Air Cargo Taipei-Taoyuan Cargo
FedEx Express Anchorage, Cebu, Los Angeles, Penang, Singapore, Subic Bay, Tokyo-Narita Cargo
Gading Sari Jakarta-Halim Cargo
Indian Airlines Cargo Chennai Cargo
Japan Airlines Cargo Singapore, Tokyo-Narita, Bangkok-Suvarnabhumi, Manila Cargo
Korean Air Cargo Seoul-Incheon Cargo
Lufthansa Cargo Bangkok-Suvarnabhumi, Chennai, Frankfurt Cargo
MASkargo Amsterdam, Basel, Beijing, Dubai, Frankfurt, Guangzhou, Hong Kong, Melbourne, Milan-Malpensa, Shanghai-Pudong, Sydney, Taipei-Taoyuan, Tashkent, Tokyo-Narita Cargo
Nippon Cargo Airlines Osaka-Kansai, Tokyo-Narita Cargo
Republic Express Jakarta-Soekarno-Hatta Cargo
Singapore Airlines Cargo Singapore Cargo
TNT Airways Cargo
Transmile Air Services Anchorage, Bangalore, Chennai, Cincinnati/Northern Kentucky, Hong Kong, Jakarta-Soekarno-Hatta, Johor Bahru, Kota Kinabalu, Kuching, Luik, Malmo, Manila, Medan, Mumbai, Nagoya, Osaka-Kansai, Penang, Riverside, Shanghai-Pudong, Shenzen, Singapore, Tokyo-Narita, Taipei-Taoyuan Cargo
Tri-MG Intra Asia Airlines Jakarta-Soekarno-Hatta Cargo
UPS Airlines Anchorage, Cologne/Bonn, Dubai, Penang, Singapore Cargo

Prospective airlines and routes

Ground transportation

Inter-terminal transportation

Aerotrain station in Satellite Building

Terminals of Kuala Lumpur International Airport are well connected with the KLIA Automated People Mover (Aerotrain), a three-car driverless train that runs on elevated rail and under the taxiways and also the bus system.

Main Terminal Building – LCCT
The LCCT is connected with the Main Terminal Building with a NadiKLIA bus for RM1.50. The Malaysian government announced in November 2006 that it had approved in principle the construction of a rail link between the Main Terminal Building and LCCT. However, the construction is pending until the new LCCT hub complex is fully constructed by 2010.
Main Terminal Building – Satellite Terminal A
The Main Terminal Building and Satellite Building are connected by Aerotrain at three to five minute intervals. The journey between terminals takes under two minutes, and each 250-person capacity train is able to transport 3,000 passengers per hour per direction with the maximum speed being 56 km/h (35mph). This is a complimentary service for all passengers traveling to/from Satellite Terminal

On November 25, 2008, the train manufacturer and airport operator announce a deal to purchase 3 new vehicles plus a spur line to a new Operations, Maintenance and Storage Facility worth 45 million euros. The new system is expected to be fully functional by 2011.[25]

Rail

Main articles: KLIA Express, KLIA Transit, KLIA ERL station, KL Sentral

Kuala Lumpur International Airport can be reached by the KLIA Express and the KLIA Transit train services. KLIA Express provides a non-stop express train service to the KL City Air Terminal (KL CAT) which has an IATA designation XKL, part of the Kuala Lumpur Sentral transportation hub in Kuala Lumpur. The non-stop trip between Kuala Lumpur and KLIA is 57 kilometers and takes exactly 28 minutes. Passengers departing from KL CAT can check in their luggage for flights on Emirates, Cathay Pacific, Royal Brunei Airlines and Malaysia Airlines. Whereas KLIA Transit is a high-speed commuter train service linking Kuala Lumpur Sentral, and the Kuala Lumpur International Airport ERL station. It shares the same tracks as the KLIA Express but with stops at three intermediate stations. Check-in facilities are not available at KLIA Transit stations. Passengers to/from Low Cost Carrier Terminal can reach KLIA ERL station by boarding the Feeder Bus provided.

Taxis and limousine

Airport taxis or airport limousines are provided by Airport Limo. The taxis and limousines are readily available at the Taxi and Limousine counters. They run from airport itself to destinations in Klang Valley and Greater Klang Valley. The fares are to be paid at the counter and are charged according to the destinations' zone. A surcharge is applied for services between 12 a.m. to 5 a.m.

Bus

Both public and private buses connect KLIA to several points in Kuala Lumpur and beyond.

Expansion and developments

Plans

KLIA Aeropolis Masterplan

Under the new Kuala Lumpur International Airport Masterplan, a new runway and a new satellite building will be constructed to accommodate the increasing number of passengers. The airport Phase 2 development plan is to handle 40 million (increase5 Million) passengers per year by 2008 with the expansion of low cost carrier terminal. For phase 3, the airport will expand to handle 75 million (increase35 million) passengers per annum with the construction of a new satellite terminal and replacement of current low cost carrier terminal with a new low cost carrier terminal that will be capable of handling 30 million passengers alone. Under Phase 4, the airport will be capable to handle 130 million passengers per annum by 2020.

With the slight modification of the masterplan, the future Terminal 2's satellite terminal will be combined into one satellite terminal. The expansion of Terminal 2's satellite terminal will be exactly the same as Terminal 1's satellite terminal, where initially the satellite terminal will have four arms, and another four arms when the terminal reached its capacity. There is sufficient land and capacity to develop facilities to handle up to 130 million passengers a year, five runways by the year 2020 and two mega-terminals, each linked with satellite terminals.[3] The airport's vicinity will include hiking trails for jet-lagged travelers, golf courses, convention center, a theme park, a shopping center, hotels, and a wetlands nature preserve. Sepang International Circuit, which hosts Formula One, A1 Grand Prix, Super GT, IndyCar Series and MotoGP races, is also nearby. There has also been a proposal for a monorail link to the F1 circuit. The development plan is due to be ready by April 2008.[26]

In November 2006, the Malaysian government announced that it had approved in principle the construction of a rail link between the main terminal building and the low-cost carrier terminal. Construction was scheduled to begin in 2007. There were however no details of which company would carry out the project, nor was there an indication that it would be directly connected to the existing airport high-speed train Express Rail Link.

Low cost carrier terminal extension and new LCCT

Operational Statistics[27]
Departure lounge with large windows for light and aircraft viewing.
Year Passenger
movements
Airfreight
movements
(tonnes)
Aircraft
movements
1998 6,524,405 156,641 64,123
1999 13,172,635 417,068 116,589
2000 14,732,876 510,594 109,925
2001 14,538,831 440,864 113,590
2002 16,398,230 527,124 127,952
2003 17,454,564 586,195 139,590
2004 21,058,572 651,747 164,483
2005 23,213,926 653,654 182,537
2006 24,570,385 677,446 183,869
2007 26,938,970 649,197 193,982
2008 27,529,355 649,076 209,681
2009 29,682,093 584,559 225,251

With an increasing number of passengers using the 'Low Cost Carrier Terminal '(LCCT), MAHB has approved an expansion beginning early 2007 to accommodate more passengers as the current LCCT is nearly in full capacity. The expansion of LCCT also shows the support for launch of Malaysia's first long haul low cost carrier, AirAsia X by making the terminal able to accommodate wide-bodied aircraft that are used by AirAsia X[28] However, the Low Cost Carrier Terminal is a temporary solution for budget travellers, MAHB has submitted a proposal to the Transport Ministry to build a new, permanent LCC hub in between the main terminal building and satellite building A to replace the present Low Cost Carrier terminal.[29]

The airport operator has announced that the construction works for the extension of LCCT will begin in March 2008 and expected to complete by December 2008. The capacity for the LCCT will increase from 10 million passengers a year to 15 million passengers a year. A proposal for a more permanent building to house a new LCCT has been submitted and expected to have a capacity for 30 million passengers a year. It is also expected that the new LCCT will be completed by 2011 to 2012.[30] It is expected that the current LCCT will be converted in to a cargo hub once the new terminal is completed.[31] The RM124 million LCCT expansion project tender was won by Fajarbaru Builder Group Bhd and construction work is expected to begin March 2008.[32] The new international arrival hall was opened on December 15, 2008 with expectation that the rest of the wing will be fully operational by March 2009.[18] The international departure hall was finally open on March 18, 2009 which expanded the handling capacity from 600 passengers at one time to 3200 passengers.[33]

The airport operator has announced that the construction of a permanent LCCT will commence sometime in 2008 although the site has yet to be finalized. It is expected that the permanent LCCT will have a design capacity of 30 to 35 million passengers per annum.[17]

KLIA East @ Labu was a proposed future airport. The airport will be located at Labu, which is 10 kilometres away from Kuala Lumpur International Airport (KLIA). It is proposed to replace the low cost carrier terminal (LCCT) in KLIA for AirAsia flights only. The construction of the new airport, on a 2,800 hectares () area at the state’s central corridor in Labu, would be financed by the private sector. The two parties who have agreed to it are AirAsia Group and Sime Darby who owns the land). It had been planned to start construction on January 2009 and will open 2011. Meanwhile, Malaysian Airports Holdings Berhad (MAHB), the operators of KLIA, plans to continue ahead with the construction of a new LCC Terminal at KLIA to increase terminal capacity for low cost airlines. After consultation with the government, the government instructed the airport operator to build the terminal at KLIA instead in close consultation with AirAsia.[34]

To accommodate the overwhelming increase in passenger traffic at LCCT, limited service hotel chain Tune Hotels.com announced that it is on track to open a 222-room hotel at the terminal in by the first quarter of 2009[35].

According to news reports, the MYR 2 billion terminal will be funded by the government as a part of the second economic stimulus package. The new terminal will be located 1.5 km from the current main terminal, will have 70 aircraft parking bays and possibly a third runaway which is located 1.5 km from the second runaway. The new terminal is expected to be 150,000 square meter in size and able to accommodate 30 million passenger with provision to expand to 45 million passenger a year. There is also a possibility to include a rail extension for the Express Rail Link. The construction is expected to begin in mid-2009 and finish in Q3 2011.[36]

During an announcement to set up virtual hub in Middle East, AirAsia X has cited fear that the new Low-Cost Carrier Terminal might not be ready by 2011 as there is no sign of any construction work or even groundbreaking of the new LCCT. The existing LCCT will not be able to cope as there won't be enough parking bays as AirAsia X is poised to take delivery of 12 more A330 by 2011. If the fear were true, it would be another blow to AirAsia and AirAsia X expansion plans. This comes just days after the Malaysian government denied AirAsia X the rights to fly into Sydney and Seoul.[37][38]

The airport operator announce that works on the new Low Cost Carrier Terminal is expected to begin in November 2009 with a targeted completion date in 3rd quarter of 2011. The transport ministry also said that the works will include construction of a new runway, taxiway, parking bays, terminal, control tower, fire station and related facilities like hotel, retail outlets outlets. A 2 km extension of the KLIA Express will be included in the plan. [39]. WCT Bhd has been award contract for site preparation, earthworks and construction of main drainage which should to be completed by 1 January 2011.[40] A new runway worth RM291 million will be built by Gadang. Construction of the new runway and taxiway is scheduled to start in February and finished by December 2010.[41]

On July 15 2010, the was announced that Bina Putri with partner UEM Construction has won the tender to build the terminal for MYR 997.23 million. Construction works is expected to complete within 20 months.[42]

A380 Upgrades

The operator of Kuala Lumpur International Airport, Malaysia Airports Holding Berhad, had spent about RM135 million (approx US$39 million) to upgrade facilities at the KL International Airport (KLIA) in Sepang to accommodate the Airbus A380. Upgrading works started on April 3, 2006, and was completed by May 28, 2007. Works include the provision of shoulders on both sides of the two existing runways of 15 meters as well as the taxiways, building additional aerobridges at the three departure halls, namely C17, C27 and C37, and enhancing the mezzanine lounges for upper deck passengers of the aircraft at the departure halls.[43]

Awards and recognitions

Since its inauguration in year 1998, it has won numerous awards from international organizations around the world such as Skytrax and International Air Transport Association.

KLIA's commitment to promote environment responsibility for all local and foreign travellers was recognized by Green Globe, which is the first and only airport in the world to receive Green Globe certificate in year 2004 onwards.[44]

Since its inauguration on June 27, 1998, the airport has won awards. With its continuous effort to provide excellent services to passengers, the airport has emerged as one of the top five airports in the world.

In 2007, KLIA was rated the best airport in the world for 15-25 million passengers with Third Best Airport in Asia Pacific and Worldwide for the year of 2006. The award was organised by Airports Council International Airport Service Quality (ACI-ASQ).[45] While in the 2007 Skytrax Airport of the Year awards, it finished fifth behind Hong Kong International Airport, Incheon International Airport, Singapore Changi Airport and Munich Airport.[46] In the 2008 Skytrax Airport of the Year Awards, it moved up a place to fourth in the World's Best Airport for the year 2008.[47]

In 2008, KLIA was honored again with the best airport in the world for 15-25 million passengers category n the Airport Council International's (ACI) Airport Services Quality Awards 2007. KLIA also improved its ranking this year for Best Airport Worldwide and Best Airport Asia Pacific by coming in second behind Seoul's Incheon International Airport,[48] beating Singapore Changi Airport and Hong Kong International Airport which are leaders in service excellence.[49]

Apart from these, Kuala Lumpur International Airport is the first airport in the world to be accredited with Airport Service Quality (ASQ) Assured certificate from Airports Council International (ACI)[50]

Accidents and incidents

Gallery

Panoramic view of Main Terminal Building and Contact Pier

See also

References

  1. 1.0 1.1 "30 Busiest Airport in the World". ACI Asia Pacific. July 28, 2009. http://www.aci-asiapac.aero/cda/aci_common/display/main/aci_content07_c.jsp?zn=aci&cp=1-5-54-4819_666_2__. 
  2. 2.0 2.1 2.2 "History of KLIA". 1998. http://www.dcaklia.gov.my/EnglishPages/MENU/MainFrame.htm. 
  3. 3.0 3.1 3.2 3.3 "Phases of KLIA". 1998. http://www.kiat.net/klia/phases.html. 
  4. "First Flights of Kuala Lumpur International Airport". Department of Civil Aviation KLIA Branch. 1998. http://www.dcaklia.gov.my/EnglishPages/History/history_opening.htm. 
  5. "KLIA's opening marked with problems". Lim Kit Siang Media Release. July,1998. http://www.limkitsiang.com/archive/1998/July98/sg1120.htm. 
  6. "Passengers at Kuala Lumpur Airport up despite fewer airlines". Asian Economic News. 6, August 2001. http://www.findarticles.com/p/articles/mi_m0WDP/is_2001_August_6/ai_77496547. 
  7. "Non-airport businesses boost MAHB profit". BTimes. http://www.btimes.com.my/Current_News/BTIMES/Friday/Frontpage/AIRPO.xml/Article/index_html. Retrieved 2008-02-29. 
  8. "AAirAsia helps Kuala Lumpur towards 30 million; Singapore route soon to be fully liberalised". anna.aero. 10 October 2008. http://www.anna.aero/2008/10/10/airasia-helping-kuala-lumpur-towards-30-million-passengers/. 
  9. "Passenger Movement At KLIA Up 7.7 Pct In January 2008". Bernama. http://web8.bernama.com/aviation_news/news.php?id=318036&lang=en. Retrieved 2008-03-18. 
  10. "KLIA Introduces Integrated Self Check In Kiosks for Benefits of Passengers". Air Transport News. http://www.airtransportnews.aero/cgi-bin/article.pl?&id=5194. 
  11. "Self Check In at KLIA". New Straits Times. http://www.nst.com.my/Weekly/Travel/article/TravelNews/20070821115659/Article/pp_index_html. Retrieved 2007-08-21. 
  12. "KLIA partners with SITA to be the first fully integrated Airport in Asia". http://www.centreforaviation.com/aviation/Info_Services_News/Aviation_News/KLIA_partners_with_SITA_to_be_the_first_fully_integrated_Airport_in_Asia/. Retrieved 2005-09-21. 
  13. "KLIA retail space due to be optimized". The Star Business. http://biz.thestar.com.my/news/story.asp?file=/2007/3/13/business/17126099&sec=business. Retrieved 2007-03-13. 
  14. "KLIA increase WiFi range". CAPA. http://www.centreforaviation.com/aviation/Info_Services_News/Aviation_News/KLIA_increase_WiFi_range/. Retrieved 2008-02-19. 
  15. "9 firms shortlisted for KLIA retail expansion project". NST. http://www.redorbit.com/news/business/1075828/9_firms_shortlisted_for_klia_retail_expansion_project/index.html. Retrieved 2008-02-16. 
  16. "KLIA LCCT". Malaysia Airports Berhad. http://www.klia.com.my/LCCTerminal/. Retrieved 2008-06-07. 
  17. 17.0 17.1 CHOW HOW BAN. "Work on permanent LCCT to start this year". The Star. http://biz.thestar.com.my/news/story.asp?file=/2008/4/4/business/20837166&sec=business. Retrieved 2008-04-03. 
  18. 18.0 18.1 Geetha Krishnan (2008-12-09). "LCCT international arrival hall ahead of schedule". The Star. http://thestar.com.my/metro/story.asp?file=/2008/12/9/central/2735403&sec=central. 
  19. All Airlines can now offer city check-in in KL Sentral
  20. KL Sentral to offer check out baggage service
  21. "AirAsia To Shutdown Booking System For 3 Days From Friday". http://www.bernama.com.my/bernama/v3/news_lite.php?id=511482. 
  22. http://www.qatarairways.com/global/en/newsroom/archive/press-release-21June10.html
  23. THY shies from LOT acquisition, covets SE Asia/Australia expansion
  24. "Bombardier Consortium Awarded Contract for Expansion of Automated People Mover in Kuala Lumpur, Malaysia". International Business Times. 2008-11-25. http://www.ibtimes.com/prnews/20081125/bombardier-consortium-awarded-contract-for-expansion-of-automated-people-mover-in-kuala-lumpur-malay.htm. 
  25. "KLIA to have a Theme Park". The Star. http://biz.thestar.com.my/news/story.asp?file=/2008/1/8/business/20080108152824&sec=business. Retrieved 2001-01-08. 
  26. Malaysia Airports Holding Berhad KLIA Operational Statistics
  27. The Star. Once the expansion of LCCT is completed, it will be able to handle 15 million passengers per annum.Upgrade for LCCT next year. November 08,2006
  28. Proposal of new LCC Hub "New LCC Hub Proposed". The Star Malaysia. http://biz.thestar.com.my/news/story.asp?file=/2007/2/3/business/16750455&sec=business Proposal of new LCC Hub. Retrieved 2007-11-03. 
  29. "LCCT expansion to begin next month". The Edge Daily. http://www.theedgedaily.com/cms/content.jsp?id=com.tms.cms.article.Article_d4b9ae4c-cb73c03a-19214b10-2b06279c. Retrieved 2008-02-01. 
  30. "LCCT may become cargo hub when new terminal is up". The Star Online. http://biz.thestar.com.my/news/story.asp?file=/2008/2/2/business/20216332&sec=business. Retrieved 2008-02-01. 
  31. "Fajarbaru wins RM124m KLIA job". Business Times. http://biz.thestar.com.my/news/story.asp?file=/2008/3/25/business/20741739&sec=business. Retrieved 2008-03-25. 
  32. "New LCCT departure hall opens". The Star. 2009-03-18. http://thestar.com.my/news/story.asp?file=/2009/3/18/nation/3499397&sec=nation. 
  33. Hamidah Atan and Regina Lee (2009-01-31). "Malaysia Airports will build low-cost terminal". New Straits Times. http://www.nst.com.my/Current_News/NST/Saturday/Frontpage/2467174/Article/index_html. 
  34. "Business As Usual For Tune Hotels.com In 2009". http://www.bernama.com.my/bernama/v3/news_business.php?id=378789. Retrieved 2009-01-05. 
  35. "New RM2b LCCT to be ready by Q3 2011". Business Time. 2009-03-13. http://www.btimes.com.my/Current_News/BTIMES/articles/20090313151812/Article/index_html. 
  36. http://www.btimes.com.my/Current_News/BTIMES/articles/azrasia/Article/
  37. http://biz.thestar.com.my/news/story.asp?file=/2009/7/30/business/4415816&sec=business
  38. "New LCCT site clearing works to start next month". The Star. 2009-10-31. http://biz.thestar.com.my/news/story.asp?file=/2009/10/31/business/5014453&sec=business. 
  39. "WCT wins new LCCT contract". Business Times. 2009-12-03. http://www.btimes.com.my/Current_News/BTIMES/articles/wct02/Article/. 
  40. Sharen Kaur (2010-01-13). "Gadang gets work on new LCCT". Business Times Malaysia. http://www.btimes.com.my/Current_News/BTIMES/articles/GADANG12-2/Article/index_html. 
  41. Jeeva Arulampalam (2010-06-16). "UEM-Bina Puri venture wins RM997m LCCT deal". http://www.btimes.com.my/Current_News/BTIMES/articles/lcct16/Article/index_html. 
  42. "MAHB upgrade KLIA to take in A380". NST. http://www.redorbit.com/news/business/618308/mahb_upgrades_klia_to_take_in_a380/index.html. Retrieved 2006-08-16. 
  43. "KLIA receives Green Globe 21 Cert". KLIA. http://pgp.klia.com.my/v1/greenGlobe.php. Retrieved 2007. 
  44. "KLIA Bags 3 Global Awards for year 2006". ACI. 2007. http://biz.thestar.com.my/news/story.asp?file=/2007/3/14/business/17132097&sec=business. 
  45. "Skytrax Airport of the Year 2007". Skytrax. 2008-02-27. http://www.worldairportawards.com/Awards_2007/Airport2007.htm. 
  46. "Skytrax votes KLIA as world’s fourth best". The Star Malaysia. http://www.thestar.com.my/news/story.asp?file=/2008/7/16/nation/21832299&sec=nation. Retrieved 2008-07-16. 
  47. "KLIA - world's best airport for third year running". Business Times. http://www.btimes.com.my/Current_News/BTIMES/Wednesday/Nation/klia01f.xml/Article/index_html. Retrieved 2008-04-02. 
  48. "Airport Service Quality Awards 2007". ACI. 2008-02-27. http://www.airports.org/cda/aci_common/display/main/aci_content07_c.jsp?zn=aci&cp=1-7-46^21375_666_2__. 
  49. "KLIA First To Get Airport Service Quality Assured Certificate". Bernama News Agency. http://www.bernama.com/aviation_news/news.php?id=295691&lang=en. Retrieved 2007-11-12. 
  50. Aerobridge at KLIA Breakdown
  51. Red faces over phantom stowaway
  52. "Robbers shoot six at KLIA, flee with RM3.5m". The Star. http://thestar.com.my/news/story.asp?file=/2008/4/10/nation/20907995&sec=nation. Retrieved 2008-04-10. 
  53. Rashita A. Hamid and M. Kumar (2009-01-10). "Small fire shuts down LCCT for two hours". The Star. http://thestar.com.my/news/story.asp?file=/2009/1/10/nation/2991144&sec=nation. 

External links