KC-135 Stratotanker | |
---|---|
|
|
A KC-135R refuels an F-15 Eagle | |
Role | Aerial refuelling and transport |
National origin | United States |
Manufacturer | Boeing |
First flight | 31 August 1956 |
Introduced | June 1957 |
Status | Active service |
Primary users | United States Air Force French Air Force Republic of Singapore Air Force Turkish Air Force |
Produced | 1954-1965 |
Number built | 803 |
Unit cost | US$39.6 million (FY98 constant dollars) |
Developed from | C-135 Stratolifter |
The Boeing KC-135 Stratotanker is an aerial refueling military aircraft. It and the Boeing 707 airliner were developed from the Boeing 367-80 prototype. The KC-135 was the US Air Force's first jet powered refueling tanker and replaced the KC-97 Stratotanker. The Stratotanker was initially tasked to refuel strategic bombers, but was used extensively in the Vietnam war and later conflicts such as Desert Storm to extend the range and endurance of both Air Force and Navy tactical fighters and bombers.
Serving with the United States Air Force since 1957, it is one of just six military fixed wing aircraft with over 50 years of continuous service with its original operator. Supplemented by the larger KC-10, complete replacement is still under study by the Air Force. Despite increased maintenance costs, studies conclude many of the aircraft could be flown until 2040, with ages reaching 80 years before reaching lifetime flying hour limits.
Contents |
The KC-135 is derived from the original Boeing jet transport "proof of concept" demonstrator, the Boeing 367-80 (commonly called the "Dash-80"). As such, it has a narrower fuselage and is shorter than the Boeing 707 jetliner. Boeing gave the tanker the designation of Model 717.[1] The 367-80 was the basic design for the commercial Boeing 707 passenger aircraft as well as the KC-135A Stratotanker.
In 1954 USAF's Strategic Air Command held a competition for a jet powered Aerial refueling Tanker. Lockheed's tanker version of the proposed Lockheed L-193 airliner with tail mounted engines was declared the winner in 1955.[2] Since Boeing's proposal was already flying, the KC-135 could be delivered two years earlier and Air Force Secretary Harold E. Talbott ordered 250 KC-135 tankers until the Lockheed's design could be manufactured. In the end, orders for the Lockheed tanker were dropped rather than supporting two tanker designs. Lockheed never produced its jet airliner, while Boeing would eventually dominate the market with a family of airliners based on the 707.[3][4]
In 1954 the ordered the first 29 of its future fleet of 732. The first aircraft flew in August 1956 and the initial production Stratotanker was delivered to Castle Air Force Base, California, in June 1957. The last KC-135 was delivered to the Air Force in 1965.
Developed in the late 1950s, the basic airframe is characterized by swept wings and tail, four underwing mounted engine pods, a horizontal stabilizer mounted on the fuselage near the bottom of the vertical stabilizer with positive dihedral on the two horizontal planes and a hi-frequency radio antenna which protrudes forward from the top of the vertical fin or stabilizer. These basic features make it strongly resemble the commercial Boeing 707 and 720 aircraft, although it is actually a different aircraft.
The Strategic Air Command (SAC) had the KC-135 Stratotanker in service with Regular Air Force SAC units from 1957 through 1992 and with SAC-gained Air National Guard (ANG) and Air Force Reserve (AFRES) units from 1975 through 1992.
Following a major USAF reorganization that resulted in the inactivation of SAC in 1992, most KC-135s were re-assigned to the newly-created Air Mobility Command (AMC). While AMC gained the preponderance of the aerial refueling mission, a small number of KC-135s were also assigned to directly United States Air Forces in Europe (USAFE), Pacific Air Forces (PACAF) and the Air Education and Training Command (AETC). All Air Force Reserve Command (AFRC) KC-135s and most of the Air National Guard (ANG) KC-135 fleet became operationally-gained by AMC, while Alaska Air National Guard and Hawaii Air National Guard KC-135s became operationally-gained by PACAF.
Reconnaissance and command post variants of the aircraft, including the RC-135 Rivet Joint and EC-135 Looking Glass Post Attack Command & Control Systems were operated by SAC from 1963 through 1992, when they were re-assigned to the Air Combat Command (ACC). The USAF EC-135 Looking Glass was subsequently replaced in its role by the U.S. Navy E-6 Mercury aircraft, a new build airframe based on the Boeing 707 and KC-135.
The KC-135Q was the variant modified to carry the JP-7 fuel necessary for the SR-71 Blackbird and air-refuelable versions of the U-2, segregating the JP-7 from the KC-135's own fuel supply (the body tanks carrying JP-7, and the wing tanks carrying JP-4 or JP-8). When the KC-135Q model received the CFM-56 engines, it was redesignated the KC-135T model, which was capable of separating the main body tanks from the wing tanks where the KC-135 draws its engine fuel. The only external difference between a KC-135R and a KC-135T is the presence of a clear window on the underside of the empennage of the KC-135T where a remote controlled searchlight is mounted. It also has two ground refueling ports, located in each rear wheel well so ground crews can fuel both the body tanks and wing tanks separately.
Eight KC-135R aircraft are receiver-capable tankers, commonly referred to as KC-135R(RT). All eight aircraft were with the 22d Air Refueling Wing at McConnell AFB, KS as of 1994.[5] They are primarily used for force extension and Special Operations missions, and are crewed by highly qualified receiver capable crews. If not used for the receiver mission, these aircraft can be flown just like any other KC-135R.
In order to expand the KC-135's capabilities and improve its reliability, the aircraft has undergone a number of upgrades. Among these was the Pacer-CRAG program (CRAG=Compass, Radar And GPS) which ran from 1999 to 2002 and modified all the aircraft in the inventory to eliminate the Navigator position from the flight crew. The program development was done by Rockwell Collins in Iowa[6] and installation was performed by BAE Systems at the Mojave Airport in California.[7] The latest block upgrade to the KC-135 is Block 40.4 which allows the KC-135 to comply with CNS/ATM.
All KC-135s were originally equipped with Pratt & Whitney J-57-P-59W turbojet engines which produced 10,000 lbf of thrust dry, and approximately 13,000 lbf of thrust wet. Wet thrust is achieved through the use of water injection on takeoff. 670 gallons of water are injected into the engines over the course of two and a half minutes. This water allows a second set of fuel injectors to activate without melting the turbine buckets. The water turns to steam and is ejected out the rear of the engine, increasing the mass through the engine and increasing thrust. The engine runs a little hotter, with more engine noise.
In the 1980s the first modification program re-engined 157 Air Force Reserve (AFRES) and Air National Guard (ANG) tankers with the Pratt & Whitney TF-33-PW-102 engines from 707 airliners retired in the late 1970s and early 1980s. The re-engined tanker, designated the KC-135E, was 14% more fuel efficient than the KC-135A and could offload 20% more fuel on long duration flights. (The difference is that the A-model weighed only 104,000 lb empty, while the E-model weighed 115,000 lb empty. But the maximum takeoff weight was not increased for the E-model. Therefore, the A-model could takeoff with 200,000 lb of fuel, while the E-model could only takeoff with 190,000 lb of fuel.) Only the KC-135E aircraft were equipped with thrust-reversers for takeoff aborts and shorter landing roll-outs. The KC-135E fleet has since either been re-engined into the R-model configuration or placed into long term storage ("XJ"), as Congress has prevented the Air Force from formally retiring them. The final KC-135E, tail number 56-3630, was delivered by the 101st Air Refueling Wing of the Maine ANG to the 309th Aerospace Maintenance and Regeneration Group (AMARG) at Davis-Monthan AFB in September 2009.[8]
The second modification program re-engined 500 aircraft with new CFM International CFM56 (military designation: F108) engines produced by General Electric and Snecma. The CFM-56 turbofans are capable of producing approximately 22,500 lbf of thrust, nearly a 100% increase in power compared to the original J-57 engines. The re-engined tanker, designated either the KC-135R or KC-135T, can offload up to 50% more fuel (on a long duration sortie), is 25% more fuel efficient, costs 25% less to operate and is 96% quieter than the KC-135A (sideline noise levels at takeoff were reduced from 126 to 99 decibels).[9]
The KC-135R's operational range is 60% greater than the KC-135E for comparable fuel offloads, providing a wider range of basing options.[10]
No longer in consideration, upgrading the remaining KC-135E into KC-135R would have cost about three billion dollars, about 24 million dollars per aircraft.[10] According to Air Force data, the KC-135 fleet had a total operation and support cost in fiscal year 2001 of about $2.2 billion. The older E model aircraft averaged total costs of about $4.6 million per aircraft, while the R models averaged about $3.7 million per aircraft. Those costs include personnel, fuel, maintenance, modifications, and spare parts.[11]
This program adds refueling pods to the KC-135's wings. The pods allow refueling of U.S. Navy, U.S. Marine Corps and most NATO tactical jet aircraft while keeping the tail-mounted refueling boom. The pods themselves are Flight Refueling Limited (FRL) MK.32B model pods. This allows the tanker to refuel two receivers at the same time, which increases throughput compared to the boom drogue adapter.[12]
Besides its primary role as an inflight aircraft refueler, the KC-135, designated NKC-135, has assisted in several research projects at the NASA Dryden Flight Research Center at Edwards Air Force Base, California. One such project occurred between 1979 and 1980 when special wingtip "winglets", developed by Richard Whitcomb of the Langley Research Center, were tested at Dryden, using an NKC-135A tanker loaned to NASA by the Air Force. Winglets are small, nearly vertical fins installed on an aircraft's wing tips. The results of the research showed that drag was reduced and range could be increased by as much as 7 percent at cruise speeds.[13][14] Winglets are now being incorporated into most new commercial and military transport jets, as well as business aviation jets.
NASA also has operated several KC-135 aircraft (without the tanker equipment installed) as their infamous Vomit Comet zero-gravity simulator aircraft. The longest-serving (1973 to 1995) version was KC-135A, AF Ser. No. 59-1481, named Weightless Wonder IV and registered as N930NA.[15]
A number of KC-135A and KC-135B aircraft have been modified to EC-135, RC-135 and OC-135 configurations for use in several different roles.
The KC-135R has four turbofan engines, mounted under 35-degree swept wings,[16] which power it to takeoffs at gross weights up to 322,500 pounds (146,300 kg). Nearly all internal fuel can be pumped through the tanker's flying boom, the KC-135's primary fuel transfer method. A special shuttlecock-shaped drogue, attached to and trailing behind the flying boom, may be used to refuel aircraft fitted with probes. A boom operator stationed in the rear of the aircraft controls the boom while lying prone. A cargo deck above the refueling system can hold a mixed load of passengers and cargo. Depending on fuel storage configuration, the KC-135 can carry up to 83,000 pounds (37,600 kg) of cargo.
The KC-135 was initially purchased to support bombers of the Strategic Air Command, but by the late 1960s, in the Southeast Asia the KC-135 Stratotanker's ability as a force multiplier came to the fore. Midair refueling of F-105 and F-4 fighter-bombers as well as B-52 bombers brought far-flung bombing targets within reach, and allowed fighter missions to spend hours at the front, rather than just a few minutes, due to their limited fuel reserves. KC-135 crews refueled both Air Force and Navy / Marine Corp aircraft, though they would have to change to probe and drogue adapters depending upon the mission. Crews also helped to bring in damaged aircraft which could fly while being fed by fuel to a landing site. KC-135s continued their tactical support role in later conflicts such as Desert Storm and current aerial strategy.
Air Mobility Command (AMC) manages more than 481 Stratotankers, of which the Air Force Reserve Command (AFRC) and Air National Guard (ANG]) fly 292 in support of AMC's mission as on April 2008.[17]
The KC-135 is joined by the Tupolev Tu-95, the C-130 Hercules, the B-52 Stratofortress, the English Electric Canberra and the Lockheed U-2 in having over 50 years of continuous service with its original operator.
As of 2006, the KC-135E fleet was flying an annual average of 350 hours per aircraft and the KC-135R fleet is flying an annual average of 710 hours per aircraft. The KC-135 fleet is currently flying double its planned yearly flying hour program to meet airborne refueling requirements, and has resulted in higher than forecast usage and sustainment costs.[18]
The Air Force projects that E and R models have lifetime flying hour limits of 36,000 and 39,000 hours, respectively. According to the Air Force, only a few KC-135s would reach these limits before 2040, but at that time some of the aircraft would be about 80 years old. The Air Force estimates that their current fleet of KC-135s have between 12,000 to 14,000 flying hours on them-only 33 percent of the lifetime flying hour limit.[19] Nevertheless these aircraft are over 40 years old and maintenance costs are increasing, with airframe corrosion being the worst problem.
Between 1993 and 2003, the amount of KC-135 depot maintenance work doubled, and the overhaul cost per aircraft tripled.[20] In 1996 it cost $8,400 per flight hour for the KC-135, and in 2002 this had grown to $11,000. The Air Force’s 15-year cost estimates project further significant growth through fiscal year 2017. For example, operations and support costs for the KC-135 fleet are estimated to grow from about $2.2 billion in fiscal year 2003 to $5.1 billion (2003 dollars) in fiscal year 2017, an increase of $2.9 billion, or over 130 percent, which represents an annual growth rate of about 6.2 percent.[21]
The USAF has decided to replace the KC-135 fleet. However, since there are over 500 KC-135s, these aircraft will be replaced gradually, with the first batch of about 100 aircraft to be replaced in the current buy. The effort to replace the KC-135 has been marked by intense controversy.
Initially the first batch of replacement planes was to be an air tanker version of the Boeing 767, leased from Boeing. In 2003, this was changed to contract where the Air Force would purchase 80 KC-767 aircraft and lease 20 more.[22] In December 2003, the Pentagon froze the contract and in January 2006, the KC-767 contract was canceled. This followed public revelations of corruption in how the contract was awarded, as well as controversy regarding the original leasing rather than outright purchase agreement. Then Secretary of Defense Rumsfeld stated that this move will in no way impair the Air Force's ability to deliver the mission of the KC-767, which will be accomplished by continuing upgrades to the KC-135 and KC-10 Extender fleet.
In January 2007, the U.S. Air Force formally launched the KC-X program with a request for proposal (RFP). KC-X is first phase of three acquisition programs to replace the KC-135 fleet.[23] On 29 February 2008, the US Defense Department announced that it had selected the EADS/Northrop Grumman "KC-30" (to be designated the KC-45A) over the Boeing KC-767.[24] On 18 June 2008, the US Government Accountability Office sustained Boeing's protest of the selection of the Northrop Grumman/EADS's tanker.[25] The status of the KC-45A is in doubt and the Air Force may have to rebid the contract, potentially reversing their earlier decision.[26]
In March 2009 the Air Force indicated that KC-135s would require additional skin replacement (lower wing skins were replaced by a newer alloy by Boeing in 1975-1988) to allow their continued use beyond 2018.[27]
|
|
Note Italy has been reported in some sources as operating several KC-135s,[31] however these are actually Boeing 707-300s converted to tanker configuration.[32][33]
See C-135 Stratolifter, and related articles for other C-135 family variants.
On 10 September 1962, KC-135 s/n 60-0352 on a flight from Ellsworth Air Force Base to Fairchild Air Force Base crashed into a mountain just 20 miles (32 km) northeast of Spokane, Washington. The flight hit fog on approach to the air base. The crash killed all 44 crew and passengers on board.[41]
Data from USAF Fact Sheet[17]
General characteristics
Performance
Related development
Comparable aircraft
|
|
|
|
|
|
|