USS Virginia |
|
Class overview | |
---|---|
Name: | Virginia |
Builders: | General Dynamics Electric Boat, Northrop Grumman Newport News |
Operators: | United States Navy |
Preceded by: | Seawolf class attack submarine |
In commission: | 2004-10-23 |
Building: | 3 |
Planned: | 30 |
Completed: | 5 |
Active: | 5 |
General characteristics | |
Class and type: | Attack submarine |
Displacement: | 7,800 long tons (7,900 t) |
Length: | 377 feet (115 m) |
Beam: | 34 feet (10 m) |
Propulsion: | S9G reactor |
Speed: | >25 knots (46 km/h) |
Range: | unlimited except by food supplies |
Test depth: | > 800 ft (244 m) |
Complement: | 134 |
Armament: |
12xVLS(BGM-109 Tomahawk cruise missile) & 4x700mm torpedo tubes(Mk-48 torpedo) |
Notes: | Ships in class include: Virginia, Texas, Hawaii, North Carolina, New Hampshire, New Mexico, Missouri, California, Mississippi, Minnesota, North Dakota |
The Virginia class (or SSN-774 class) of attack submarines are the first U.S. subs to be designed for a broad spectrum of open-ocean and littoral missions around the world. They were designed as a cheaper alternative to the Cold War era Seawolf-class attack submarines, and are slated to replace aging Los Angeles class subs, seventeen of which have already been decommissioned.
Contents |
The Virginias incorporate several innovations. Instead of periscopes, the subs have a pair of extendable "photonics masts"[1] outside the pressure hull. Each contains several high-resolution cameras with light-intensification and infrared sensors, an infrared laser rangefinder, and an integrated Electronic Support Measures (ESM) array. Signals from the masts' sensors are transmitted through fiber optic data lines through signal processors to the control center. They also make use of pump-jet propulsors for quieter operations.
The Virginias were intended, in part, as a cheaper ($1.8 vs $2 billion) alternative to the Seawolf class, whose production run was stopped after just three vessels. To reduce costs, the Virginias use many "commercial-off-the-shelf" (or COTS) components, especially in their computers and data networks. In practice they actually cost about $2.3 billion (in fiscal year 2005 dollars) each, due in part to the lack of an economy of scale.
In hearings before both House of Representatives and Senate committees, the Congressional Research Service and expert witnesses testified that the current procurement plans of the Virginia class—one per year at present, accelerating to two per year beginning in 2012—resulted in high unit costs and (according to some of the witnesses and some of the committee chairmen)[2] an insufficient number of attack submarines. In a March 10, 2005 statement[3] to the House Armed Services Committee, Ronald O'Rourke of the CRS testified that, assuming the production rate remains as planned, "production economies of scale for submarines would continue to remain limited or poor."
The Virginia class is built through an industrial arrangement designed to keep both GD Electric Boat and Northrop Grumman Newport News (the only U.S. shipyards capable of building nuclear vessels) in the submarine-building business. Under the present arrangement, the Newport News facility builds the stern, habitability & machinery spaces, torpedo room, sail and bow, while Electric Boat builds the engine room and control room. The facilities alternate work on the reactor plant as well as the final assembly, test, outfit and delivery.
O’Rourke wrote[4] in 2004 that, "Compared to a one-yard strategy, approaches involving two yards may be more expensive but offer potential offsetting benefits." Among the claims of "offsetting benefits" that O'Rourke attributes to supporters of a two-facility construction arrangement is that it "would permit the United States to continue building submarines at one yard even if the other yard is rendered incapable of building submarines permanently or for a sustained period of time by a catastrophic event of some kind", including an attack.
In order to get the submarine's price down to $2 billion per sub in FY-05 dollars, the Navy instituted a cost-reduction program to shave off approximately $400 million in costs off the sub's price tag. The project was dubbed "2 for 4 in 12," referring to the Navy's desire to buy two subs for $4 billion in FY-12. Under pressure from Congress, the Navy opted to start buying two subs a year earlier, in FY-11, meaning that officials would not be able to get the $2 billion price tag before the service started buying two subs per year. However, program manager Dave Johnson said at a conference on March 19, 2008, that the program was only $30 million away from achieving the $2 billion price goal, and would reach that target on schedule.[5]
On 21 June 2008, the Navy christened the New Hampshire (SSN-778), the first of the Block II boats. The submarine was delivered 8 months ahead of schedule and $54 million underbudget.[6] The Block II boats are built in four sections, compared to the ten sections of Block I boats. This enables a cost savings of $300 million per boat, reducing the cost to $2 billion per boat and the construction of two boats per year. Beginning in 2010, new vessels of the class will include a software system that can monitor and reduce EM signatures when needed.[7]
|
|