West Coast Expressway
From Wikipedia, the free encyclopedia
This article contains information about a planned or expected future road. It may contain information of a speculative nature and the content may change as the road's construction or completion approaches and more information becomes available. |
E 28 E28 expressway |
|
(Insert image logo here) Konsortium Lebuhraya Pantai Barat (KPLB) Sdn Bhd |
|
Length (kilometres) | -- km |
---|---|
Direction | North ↔ South |
Start | Taiping, Perak |
Main destinations | Beruas Ayer Tawar Kampung Gajah Teluk Intan Sabak Bernam Tanjung Karang Kuala Selangor Kapar Bukit Raja Klang Teluk Panglima Garang Banting Kuala Lumpur International Airport (KLIA) |
End | Banting, Selangor |
Construction dates | 2008 - 2013 |
Road/Expressway joined | 1 Federal route 1 E 1 AH 2 North-South Expressway Northern Route 60 Federal route 60 5 Federal route 5 5 Ipoh-Lumut Highway 58 Federal route 58 E 25 Assam Jawa-Templer Park Highway 20 E 30 North Klang Straits Bypass 2 Federal Highway E 5 Shah Alam Expressway E 26 South Klang Valley Expressway B18 Jalan Banting-Dengkil B20 Nilai-KLIA Highway |
Asian Highway Network | none |
Technical specifications | |
Development Cost | RM3.12b |
Number of lanes | 4 lanes |
Interchanges | - |
Toll plazas | - |
P Layby | - |
R&R Rest and Service Area | - |
R&R Overhead Bridge Restaurant | - |
V Vista Point | - |
Highway tunnels | - |
Type of roads | - |
Toll systems | Closed toll systems |
The West Coast Expressway, WCE or (Malay: Lebuhraya Pantai Barat) (LPB), E 28 is a planned expressway that will be built on the west coast of Peninsula Malaysia. It will connect Taiping, Perak to Banting in Selangor. The expressway will be built by Konsortium Lebuhraya Pantai Barat (KLPB) soon, as approval has just been given by the government for the construction to begin.
[edit] Overview
Construction of the expressway will be divided into 2 phases. Phase 1 involves the stretch between Tanjung Karang and Banting where construction will begin in June 2008 and completed by 2011. Phase 2 involves the stretch between Taiping and Sabak Bernam where construction will begin in 2010 and completed by 2013. The stretch between Sabak Bernam and Tanjung Karang will be on the existing stretch of Federal route 5 which will be upgraded as part of the expressway. The expressway will have a closed toll system like North-South Expressway.
[edit] List of Interchanges (To be finalized when information is available)
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
28** | Taiping Utara | 60Taiping 60Changkat Jering |
Proposed interchange Start/End of expressway |
||
28** | Taiping | 74Taiping E 1 AH 2NORTH-SOUTH EXPRESSWAY NORTHERN ROUTE E 1Bukit Kayu Hitam E 1Alor Star E 1Penang E 1Ipoh E 1Kuala Lumpur |
Proposed interchange | ||
Taiping toll plaza Closed toll system Collect ticket transit and pay a distance toll |
|||||
28** | Beruas | 73Beruas 73Parit |
Proposed interchange with toll plaza | ||
28** | Ayer Tawar | 5Ayer Tawar 5Sitiawan 5Lumut 5Universiti Teknologi Petronas 5Tronoh 5Ipoh |
Proposed interchange with toll plaza | ||
28** | Kampung Gajah | 109Kampung Gajah 109Pasir Salak |
Proposed interchange with toll plaza | ||
28** | Teluk Intan | 58Teluk Intan 70Langkap 58Bidor |
Proposed interchange with toll plaza | ||
28** | Sabak Bernam | 5Sabak Bernam 5Sungai Besar 5Hutan Melintang 69Bagan Datoh |
Proposed interchange with toll plaza | ||
Perak Darul Ridzuan Hilir Perak district border |
|||||
Sungai Bernam bridge Perak-Selangor border |
|||||
Selangor Darul Ehsan Sabak Bernam district border |
|||||
28** | Tanjung Karang | 5Tanjung Karang 5Sekinchan |
Proposed interchange with toll plaza | ||
28** | Assam Jawa | E 25 ASSAM JAWA TEMPLER PARK HIGHWAY WEST 5Assam Jawa 5Kuala Selangor 5Jeram EAST E 25Ijok E 25Batang Berjuntai E 25Kuang E 25Rawang E 25Kuala Lumpur |
Proposed interchange with toll plaza | ||
28** | Kapar | 5Kapar B2Meru |
Proposed interchange with toll plaza | ||
Bukit Raja toll plaza Closed toll system Collect ticket transit and pay a distance toll |
|||||
28** | Bukit Raja | 2Klang E 1NEW KLANG VALLEY EXPRESSWAY E 1Shah Alam E 1Damansara E 1Kuala Lumpur 20 E 30NORTH KLANG STRAITS BYPASS 20 E 30Port Klang |
Proposed interchange | ||
28** | Kebun-SAE | E 5SHAH ALAM EXPRESSWAY E 5Shah Alam E 5Subang Jaya E 5Kuala Lumpur |
Proposed interchange | ||
Kebun toll plaza Closed toll system Collect ticket transit and pay a distance toll |
|||||
28** | Teluk Panglima Garang-SKVE | E 26 SOUTH KLANG VALLEY EXPRESSWAY E 26Putrajaya E 26Cyberjaya E 26Puchong 5Teluk Panglima Garang 5Sijangkang |
Proposed interchange with toll plaza | ||
Banting Closed toll system Collect ticket transit and pay a distance toll |
|||||
28** | Banting | B18Banting B18Dengkil B20Kuala Lumpur International Airport |
Proposed interchange Start/End of expressway |
|