USS Vogelgesang (DD-862)

From Wikipedia, the free encyclopedia

USS Vogelgesang (DD-862)
Career United States Navy ensign
Ordered:
Laid down: 3 August 1944
Launched: 15 January 1945
Commissioned: 28 April 1945
Decommissioned: 24 February 1982
Fate: Sold to Mexican Navy, 24 February 1982, Decommissioned by Mexico, late 2002
Struck: 24 February 1982
General characteristics
Displacement: 3,460 tons (full)
Length: 390 ft 6 in
Beam: 40 ft 10 in
Draft: 14 ft 4 in
Propulsion: 2-screw General Electric geared turbines, 60,000 shp
Speed: 36.8 knots
Range: 4500 nm @ 20 knots
Complement: 336
Armament: 6 5", 12 40 mm, 11 20 mm, 10 21" tt
Motto: Drauf und Dran

USS Vogelgesang (DD-862) was a Gearing-class destroyer in the United States Navy. She was named for Rear Admiral Carl Theodore Vogelgesang USN (18691927).

Vogelgesang was laid down by the Bethlehem Steel Corporation at Staten Island in New York on 3 August 1944, launched on 15 January 1945 by Miss Zenaide Vogelgesang and commissioned on 28 April 1945.

Contents

[edit] Overview

Vogelgesang alternated operations along the east coast and in the Caribbean with the Second Fleet with deployments to the Mediterranean with the Sixth Fleet, underwent an extensive Fleet Rehabilitation and Modernization (FRAM) overhaul at the Boston Naval Shipyard between 1 March 1962 and 31 January 1963, served as part of the Project Gemini recovery force which picked up an unmanned experimental Gemini spacecraft in January 1965, and served as plane guard for carriers on Yankee Station in the Tonkin Gulf, participated in Sea Dragon operations, patrolled on search and rescue duties and carried out Naval Gunfire Support missions during the conflict in Vietnam.

[edit] 1945–1959

Vogelgesang conducted shakedown training out of Guantanamo Bay, Cuba, from mid-May to late June and returned to New York on the 24th for post-shakedown availability. In July, she moved to Newport, Rhode Island, for gunnery exercises and, in August, began duty at Norfolk as a training platform for destroyer nucleus crews. In October, she interrupted her training schedule to take part in the Navy Day festivities at New York but resumed those duties in November. For the next two years, the destroyer operated out of Norfolk, along the east coast, and in the West Indies, conducting exercises both independently and in company with other units of the U.S. Atlantic Fleet. On 10 November 1947, she stood out of Norfolk on her first deployment to the Mediterranean Sea. She arrived at Gibraltar on 20 November and, after a little more than three months of exercises and port visits, departed the "middle sea" on 2 March 1948.

The warship arrived back in Norfolk on 11 March and resumed a normal schedule of Second Fleet operations. She ranged up and down the east coast until 4 January 1949 at which time she headed back to the Mediterranean. Vogelgesang completed her second deployment to the Sixth Fleet on 14 May, departed Gibraltar that day, reentered Norfolk on the 23d, and commenced a two-month upkeep period.

Over the next eight years, Vogelgesang alternated five deployments to the Mediterranean with tours of duty along the east coast and in the West Indies. In addition, she also visited northern European ports during the summer of 1956 while on a midshipman training cruise. Her five Mediterranean tours consisted of normal training operations with units of the Sixth Fleet and with elements of Allied navies as well as port visits at various points throughout the Mediterranean. In 1957, there came a change in Vogelgesang's routine of the previous eight years. She deployed to the Mediterranean once more in July; but, on this deployment, she added service in the Indian Ocean. She added Aden and Massawa in Eritrea to her list of ports of call. In December, when she returned to the Mediterranean for another deployment with the Sixth Fleet, she again transited the Suez Canal, repeated her former visits to middle eastern ports, and added Bahrein Island and Abadan, Iran, to her itinerary.

During the following nine years, Vogelgesang continue her schedule of alternating Mediterranean cruises and Sixth Fleet operations.

[edit] 1960–1970

In 1961 and 1962, she provided support for the Project "Mercury" space shot.

On 1 March 1962, she entered the Boston Naval Shipyard to begin a fleet rehabilitation and modernization (FRAM) overhaul. For the next 10 months, she underwent extensive structural changes as well as equipment installation to improve greatly her antisubmarine warfare capabilities. She completed her FRAM conversion on 31 January 1963 then deployed to Guantanamo Bay where she did picket duty as part of the post Cuban Missile Crisis operation. During this deployment the USS Vogelgesang was charged with a humanitarian mission to the Dominican Republic. Resumed normal operations Norfolk. In 1964, she participated in two binational exercises with Canadian ships, CANUS SILEX in March and CANUS SLAMEX in September.

In October and November, she returned to European waters to participate in a large amphibious exercise, Operation "Steel Pike I," carried out on the Atlantic coast of Spain. In January of 1965, the warship served as part of the recovery force which picked up an unmanned experimental Gemini spacecraft. In June, she deployed to the Mediterranean once again for a two-month tour of duty with the Sixth Fleet. Vogelgesang resumed Second Fleet operations early in September following another joint United States-Canadian exercise in August on her way back from Europe. On 3 December, she began her first regular overhaul since her FRAM conversion when she entered the Norfolk Naval Shipyard.

Vogelgesang completed overhaul and sea trials on 22 March 1966 and resumed normal duty with the U.S. Atlantic Fleet. That assignment lasted until 1 June at which time she and the other ships of Destroyer Squadron (DesRon) 32 steamed out of Norfolk for a deployment to the western Pacific. Steaming by way of the Panama Canal, Pearl Harbor, and Guam, she and her colleagues reported for duty with the Seventh Fleet at Subic Bay in the Philippines on 15 July. On the 19th, she headed for the Gulf of Tonkin in the screen of Constellation (CVA-64). The task group arrived in the gulf on 28 July, and Vogelgesang provided antisubmarine defense and plane guard services as the carrier's air group struck at targets in North Vietnam. On 15 August, the destroyer closed the shores of South Vietnam to provide gunfire support for troops operating ashore. On the night of 18 and 19 August, her 5 inch guns succeeded in breaking up a company-strength Viet Cong attack on a Popular Forces outpost near Dien Huong. Reports credited her main battery with killing 70 and wounding 40 of the attacking guerrillas. In addition to service in Vietnamese waters, the warship made visits to Hong Kong and Kaohsiung on Taiwan as well as periodic stops at Subic Bay for upkeep and replenishments. Vogelgesang concluded her only combat cruise during the Vietnam conflict on 10 November when she stood out of Subic Bay, bound—via the Indian Ocean, the Suez Canal, and the Mediterranean Sea— for Norfolk. She completed her round-the-world cruise at her home port on 17 December.

After post-deployment standdown, Vogelgesang resumed her schedule alternating Mediterranean cruises with operations out of Norfolk. She spent the first 10 months of 1967 engaged in training operations along the east coast and in the West Indies. On 14 November 1967, the warship stood out of Norfolk for her first tour of duty with the Sixth Fleet since 1965. On 24 November, she conducted turnover ceremonies at the Spanish island of Majorca and officially joined the Sixth Fleet. For the next five months, the destroyer ranged the length and breadth of the Mediterranean, conducting training evolutions and making port visits. On 13 April 1968, she departed Málaga, Spain, to return to Norfolk.

After a 10-day transit, she reentered her home port on the 23d. She resumed normal Second Fleet operations until 22 July at which time she departed Norfolk for a cruise to South American waters to participate in UNITAS IX, a series of multinational exercises with units of various Latin American navies. She concluded that assignment on 3 September when she reentered Norfolk.

Normal operations and a series of tender availabilities in preparation for overhaul occupied her time from September of 1968 to June of 1969. On 2 June 1969, she departed Norfolk, en route to Boston. The warship entered the Boston Naval Shipyard and commenced regular overhaul on 5 June. She concluded sea trials successfully late in September and departed Boston on 3 October and arrived in Norfolk on the 5th. For the remainder of the year, the ship conducted post-repair exercises and refresher training in the Guantanamo Bay operating area. She returned to Norfolk on 14 December and remained in port for the rest of the year.

[edit] 1970–1980

Normal operations out of Norfolk occupied her until 30 April 1970 at which time she embarked upon another Mediterranean tour of duty. She changed operational control to Sixth Fleet on 10 May and conducted turnover at Majorca between the 12th and the 17th. For the first four months of the deployment, Vogelgesang conducted normal Sixth Fleet operations—port visits and training evolutions. However, early in September, she joined a special contingency force assembled in the eastern Mediterranean in response to Syrian intervention in the Jordanian civil war on the side of militant, antigovernment, Arab guerrillas. She cruised that portion of the sea from 5 September to 6 October. Finally, however, the American show of force succeeded in getting the Syrian forces to withdraw from Jordan, and Vogelgesang rejoined Sixth Fleet. On 8 November, she departed Palma de Majorca to return home.

The warship reentered Norfolk on 17 November and remained there through the end of the year. The destroyer resumed normal Second Fleet operations early in 1971 and remained so occupied for the next 11 months.

On 1 December 1971, she departed Norfolk for another tour of duty with the Sixth Fleet in the Mediterranean. She arrived in port at Rota, Spain, on the 9th and conducted turnover ceremonies. For the following six months, Vogelgesang operated throughout the Mediterranean, engaged in the usual round of exercises and port visits. After turnover in Rota, the destroyer got underway on 23 June to return to Norfolk.

On the 29th, she steamed into Hampton Roads and soon began a tender availability alongside Sierra (AD-18). She conducted operations out of Norfolk until 10 October at which time she began an extended repair period at the Norfolk Shipbuilding & Drydock Corp. The warship completed repairs on 26 January 1973 and finished sea trials by early February. She conducted normal operations for the remainder of the year, steaming as far south as the West Indies.

On 10 January 1974, Vogelgesang was transferred from DesRon 2 to DesRon 28 and reassigned to Naval Reserve training duty. On 1 March, her home port was changed from Norfolk to Newport, R.I. On 19 March, she headed out of Norfolk, bound for her new home port, where she arrived the following day. Since that time, Vogelgesang has operated at and out of Newport as a training platform for naval reservists, NROTC midshipmen, and OCS students. She alternated short periods at sea with weeks in port as a stationary training platform. Periodically, however, she has made extended training cruises down the east coast to the West Indies. At the beginning of 1980, the destroyer continued to serve with the Naval Reserve training program, based at Newport, R.I.

Vogelgesang earned two battle stars for service during the Vietnam conflict.

[edit] Decommissioning and Transfer

Vogelgesang was decommissioned and stricken from the Naval Vessel Register on 24 February 1982, transferred to Mexico and renamed Quetzalcoatl. She was decommissioned by the Mexican Navy in late 2002.

This article includes text from the public domain Dictionary of American Naval Fighting Ships.