TMK
From Wikipedia, the free encyclopedia
TMK (Russian: Тяжелый Межпланетный Корабль - Tyazhely Mezhplanetny Korabl for Heavy Interplanetary Spacecraft) was the designation of a Soviet Union space exploration project to send a manned flight to Mars and Venus (TMK-MAVR design) without landing.
The TMK-1 spacecraft was due to be launched in 1971 and make a three year long flight including a Mars fly-by at which time probes would have been dropped. Expanded project variations, such as the TMK-E, Mavr or KK, including a Venus flyby, electric propulsion or a manned Mars landing were also proposed.
The TMK project was planned as an answer from the Soviet Union to the United States manned moon landings. A previous Martian Piloted Complex mission was proposed in the 1956. The project was never completed because the required N1 rocket never flew successfully.
Contents |
[edit] TMK-1
TMK-1 | ||
---|---|---|
Description | ||
Role: | Mars Expedition | |
Crew: | three | |
Dimensions | ||
Height: | 39 ft | 12 m |
Diameter: | 19.60 ft | 6 m |
Volume: | ||
Rocket engines | ||
Main Engine (Lox/Kerosene) : | ||
Performance | ||
Endurance: | 1095 days |
The first flight to Mars of the TMK-1 was planned to begin on June 8, 1971.
The 75 metric ton TMK-1 spacecraft would take a crew of three on a Mars flyby mission. After a 10.5 month flight the crew would race past Mars, dropping remote controlled landers, and then be flung into an earth-return trajectory. Earth return would happen on July 10, 1974, after a voyage of three years, one month, and two days.
Spacecraft configuration:
- A habitation or pilot compartment, with an internal volume of 25 cubic meters
- A work or equipment section, including the hatch for extra-vehicular activities and a solar storm shelter when solar flares brought the interplanetary radiation levels to dangers levels. Total volume of the section 25 cubic meters
- A biological systems compartment, with the SOZh closed-cycle environmental control system, with a total volume of 75 cubic meters
- A aggregate section, with the Mars probe capsules, the KDU midcourse correction engine, the SOZh solar concentrator and solar panels, and radio antennae
- The SA crew earth re-entry capsule, about 4 m in diameter
[edit] TMK-E
TMK-E | ||
---|---|---|
Description | ||
Role: | Mars Expedition | |
Crew: | six | |
Dimensions | ||
Height: | 574 ft | 175 m |
Diameter: | 19.60 ft | 6 m |
Volume: | ||
Electric engines | ||
Main Engine (Xenon) : | 74 N | 17 lbf |
Performance | ||
Endurance: | 1000 days |
This variation was proposed in 1960, and consisted of a complete Mars landing expedition to be assembled in Earth orbit using several N1 launches. The spacecraft would be powered by nuclear electric engines and five landers would deliver a nuclear-powered Mars Train on the surface for a one-year mission.
The TMK-E would be capable of a three year flight to Mars and return, of which one year was powered flight. It would measure 175 m in length and house a crew of six. Six landing craft were included, two for the crew and four for the Mars Train vehicles.
[edit] Mavr (MArs - VeneRa)
Mavr | ||
---|---|---|
Description | ||
Role: | Venus Expedition | |
Crew: | three | |
Dimensions | ||
Height: | 82 ft | 25 m |
Diameter: | 19.60 ft | 6 m |
Volume: | 45.00 m3 | |
Rocket engines | ||
Main Engine (Lox/Kerosene) : | ||
Performance | ||
Endurance: | 680 days |
A variation of the TMK mission planning involved a flyby of Venus on the return voyage, and was given the code name "Mavr" (MArs - VeneRa), meaning Mars - Venus.
[edit] KK - Space Complex for Delivering a Piloted Expedition to Mars
KK - Space Complex for Delivering a Piloted Expedition to Mars | ||
---|---|---|
Description | ||
Role: | Mars Expedition | |
Crew: | three | |
Rocket engines | ||
Main Engine (Xenon) : | 14 lbf ea | 61 N |
Performance | ||
Endurance: | 630 days | 30 days Mars stay |
In 1966, a final version of the TMK studies was known as KK - Space Complex for Delivering a Piloted Expedition to Mars. Nuclear electric propulsion was to be used for the 630 day mission. The craft structure consisted of:
- EK - Expeditionary spacecraft: command center for piloting in interplanetary space
- OK - Orbital Complex: living and work compartments and the life support systems
- SA - The Landing Module, AV - The Ascent Module and RV - The Ascent Rocket stage
- PS - The Planetary Station: used by the expedition on the Martian surface for life support and scientific research
The launch was planned for 1980, with a crew of three cosmonauts. Mars stay duration would be 30 days.
Mission data:
- Total Payload Required in Low Earth Orbit-metric tons: 150
- Total Propellant Required-metric tons: 24
- Number of Launches Required to Assemble Payload in Low Earth Orbit: 2
- Launch Vehicle: N1
[edit] See also
[edit] External links
|