Tibbitt to Contwoyto Winter Road is a 568 kilometres (353 miles) long annual ice road first built in 1982 to service mines and exploration activities in the Northwest Territories and Nunavut in northern Canada. The road is the world's longest heavy haul ice road. Most of the road (87%) is built over frozen lakes, 495 km (308 mi), with the remaining 73 km (45 mi) built on over 64 land portages between lakes.

Contents

[edit] Construction and Operation

The road is constructed during January with plows, graders, water trucks, bulldozers, snow blowers, and specialized low ground pressure equipment. The road is built extra wide so storms don't block them and for extra spacing when opposing trucks are passing each other. The road is 50 metres (164 feet) wide on the ice, but narrower on land portages ranging between 12 m (39 ft) and 15 m (49 ft) wide. Once initially built, the road is checked by drilling holes into the ice. If the ice needs to be thickened, water trucks are called in to add water to that specific area. The road is only operational during February and March, an average of 67 days per year. The ice has been proven by engineers to support light vehicle loads at 70 centimetres (30 inches) and increasing to full highway truck loads as the ice thickens, often exceeding 100 cm (40 in).

On some lakes, traffic may be re-routed to new lanes to avoid damaged or rough sections of ice, and additional "express lanes" allow returning, empty trucks to travel at higher speeds.

The highest allowable speed for fully loaded trucks on the ice is 25 km/h (16 mph) with some areas reduced to only 10 km/h (6 mph). Empty trucks have a maximum speed limit of 60 km/h (37 mph) on the ice. Speed limits on portages range between 30 km/h (19 mph) and 50 km/h (31 mph). Speed limits are strictly enforced by security personnel with radar used to clock speeds just as national and provincial police forces do.

There are three road camps servicing drivers hauling loads along the road, they are at: Dome Lake, Lockhart Lake and Lac de Gras. Full catering is provided for travelers working for trucking and mining/explorations companies at these road camps.

Truck drivers are not allowed to travel the winter road alone, therefore, three trucks are dispatched from Yellowknife, Northwest Territories on an average of every 20 minutes. Heavy and wide loads are dispatched from Yellowknife between 12:00 am and 6:00 am to avoid daily commuter traffic.[1]

Diesel fuel is the largest item trucked north on the road. Other supplies include cement, tires, prill (ammonium nitrate) for explosives manufacture, construction materials, and machinery parts.

[edit] History

Year Road Opened Road Closed Storm Closures Super B
Capacity Reached
Number of
Truck Loads
North
2000 January 29 April 3 n/a n/a 3,703
2001 February 1 April 13 11.8 days ~March 3 7,981
2002 January 26 April 16 9.7 days February 22 7,735
2003 February 1 April 2 3.5 days February 21 5,243
2004 January 28 March 31 3.3 days February 23 5,091
2005 January 26 April 5 4.5 days February 20 7,607
2006 February 4 March 26 11.6 days not reached 6,841
2007 January 27 April 9 3.0 days February 26 10,922
2008 January 29 April 7 TBD February 15 7,387

The road was first built in 1982 to service the Lupin Gold Mine at Contwoyto Lake, Nunavut.

Until 1998, the road was licensed and operated by Echo Bay Mines Limited.

Since 1999, the road has been licensed and operated by the Tibbitt to Contwoyto Winter Road Joint Venture, a partnership between: Echo Bay Mines Ltd., BHP Billiton, and Diavik Diamond Mines Inc (Rio Tinto Group). The road is engineered by EBA Engineering Ltd. Currently, Nuna Logistics (primary road) and RTL Enterprises Ltd. (secondary road) are responsible for the annual construction, maintenance, dispatching, and camp catering for the winter road. Security on the road is provided by SecureCheck.

The year 2007 saw record usage of the ice road with 10,922 loads north, totaling 331,000 tonnes (325,772 long tons or 364,865 short tons). That record number doesn't include the 818 back hauls south, totaling 15,000 t (14,763 L/T or 16,535 S/T). The road was open for 73 days from January 27 to April 9, only closed for a total of 91.5 hours (70 hours due to storms and 21.5 hours due to minor incidents). There were over 700 drivers registered during 2007 with nine accidents and one minor injury (a bruised shoulder). During the record 2007 season, there were 120 infractions with vast majority resulting in verbal warnings. Nine five-day suspensions and seven season suspensions were issued.[2]

In 2007 the road was featured on The History Channel series called Ice Road Truckers. The mining company that owned the road where the first season was filmed felt that the show portrayed the road in a negative fashion, and decided not to participate in future seasons of the show. A new rule for the Tibbitt to Contwoyto Winter Roads was enacted for the 2008 season prohibiting commercial, media, video or rolling film cameras either inside or attached to the outside of vehicle. The show's producers have said that they have located an alternate ice road and that there will be a second season of the show.[3][4]

In 2008 the ice road opened to Hot Shots (Grocery Truck Drivers) on January 28th and to regular traffic on January 29th. [2] On March 28th it was announced that the road would be closed for the season at 18:00 on March 31st. The road was officially closed for the season on April 7, 2008.[5]

[edit] Route

The ice road begins about 60 km (37 mi) east of Yellowknife at the end of Highway 4, more commonly known as the Ingraham Trail.

From there, it winds its way north the following destinations:

The road ends in Jericho Diamond Mine, at the north end of Contwoyto Lake, Nunavut.

[edit] See also

[edit] References

  1. ^ Nuna Logistics Ltd. The Winter Road. Retrieved on 2007-08-15.
  2. ^ a b Tibbitt to Contwoyto Winter Road Joint Venture. The Tibbitt to Contwoyto Winter Road. Retrieved on 2007-08-15.
  3. ^ Tibbitt to Contwoyto Winter Road 2008 orientation materials http://jvtcwinterroad.ca/Orientation/Part4.PDF
  4. ^ Producers find new ice road for TV series (English). Landline Magazine. Owner-Operator Independent Drivers Association (2008-02-05). Retrieved on 2008-02-21.
  5. ^ Tibbitt to Contwoyto Winter Road Joint Venture. 2008 Winter Road Updates. Retrieved on 2008-04-07.

[edit] External links