Tōzai Line (Kyoto)

From Wikipedia, the free encyclopedia

Passengers await the departure of a train at Yamashina Station
Passengers await the departure of a train at Yamashina Station

The Tozai Line (東西線 Tōzai-sen?) is a Kyoto Municipal Subway line that runs from the southeastern area of the city (starting from Rokujizo Station), then east to west (i.e. tōzai in Japanese) through the Kyoto downtown area. The Kyoto Municipal Transportation Bureau operates the system along with the Karasuma Line and the City Bus. The present terminal stations are Rokujizo Station in Uji and Uzumasa Tenjingawa Station in Ukyō-ku, Kyoto. It handles an average of 120,000 passengers daily.

The stations are made modern in design. They are wheelchair-friendly, with elevators, narrow gaps between platform and train, and no height differences at places like rest rooms. Each station has a color code for easy recognition. All platforms on the line are island platforms, and have security doors separating the platform from the tracks.

The distance of the present line is 17.5 km with a gauge of 1,435 mm. The entire length is double-track. Trains are electric, operating on 1,500 V DC.

On October 12, 1997, the section the line from Daigo to Nijō opened. On November 26, 2004, the line from Daigo to Rokujizō opened. An extension westward from Nijō to Uzumasa Tenjingawa began service on January 16, 2008.[1]

Contents

[edit] Line data

  • Total length
    • Rokujizō - Uzumasa Tenjingawa: 17.5 km
  • Length (by jurisdiction)
    • Kyoto Municipal Transportation Bureau
      • Rokujizō - Misasagi: 8.7 km
      • Sanjō Keihan - Uzumasa Tenjingawa: 5.4 km
    • Kyoto Municipal Transportation Bureau / Kyoto High-Speed Rail Corp.
      • Misasagi - Sanjō Keihan: 3.4 km
  • Gauge: 1,435 mm
  • Number of stations: 17
  • Double-track sections: Entire line
  • Electrification: 1,500 V DC, overhead
  • Door closing method: In-car signaling (ATC, ATO)
  • Top speed: 75 km/h

[edit] History

[edit] Events leading up to construction

After World War II, the Kyoto Municipal Transportation Bureau discussed the possibility of creating a new municipal streetcar system, connecting Rokujizō, Daigo, and Keage, before cutting along the center of Oike-dōri (an elevated line was also considered). Before long, the proposal was at an impasse in the face of ever-increasing automobile use in the city. However, the plan was eventually reworked as a subway line.

The population along the east-west route showed a considerable trend of growth, but road development in the vicinity could not overcome traffic congestion, so a plan for transportation facilities connecting the eastern part of the city (Yamashina-ku and the eastern portion of Fushimi-ku) with the city center was developed starting in 1965, and it was officially approved by the city government in 1969. The construction of the segment from Daigo to Nijō was set to start in 1975.

At that time, however, the Keihan Keishin Line ran above-ground between Misasagi and Sanjo Keihan along the planned route, and the issue of competition arose. As a result of negotiations, Kyoto City and Keihan Electric Railway agreed to establish a Third Sector (public-private partnership) company to obtain a Type-3 railroad business permit and control the tracks, while the City of Kyoto would obtain a Type-2 railroad business permit and operate the trains on that section. Thus the Kyoto High Speed Railway Corporation was born. Founded in 1986, then-mayor Masahiko Imagawa assumed duties as its president. Kyoto High Speed Railway constructed the subway through the Japan Railway Construction Group, and along with the Keihan Keishin Line's incorporation, the above-ground section was set to be eliminated.

Over the course of construction work underneath Kyoto, the project faced frequent, unavoidable interruptions due to discoveries of remains and ruins, and experienced difficult work in tunneling underneath the Kamo River and Tōkaidō Shinkansen. The section from Daigo to Nijō opened in 1997, and the Keihan Keishin Line was integrated from Misasagi to Kyoto Shiyakusho-mae.

The reason that the Keishin Line does not terminate at Sanjo Keihan as it originally did when above-ground, is that the necessary amount of space for a turnaround could not be provided (not only is there a sharp curve directly to the west of that station, but the turnaround would be directly underneath the Kamo River, so it was not feasible). The reason it did not originally continue to the (then-)terminus at Nijō was for the Kyoto Municipal Transportation Bureau to keep the calculated costs of running the trains balanced. However, since the opening of the extension in 2008, this is no longer the case and trains of the Keishin line now continue all the way to the present terminus at Uzumasa Tenjingawa. When the above-ground Keishin Line portion was demolished, Kujōyama Station and Hinooka Station (which have no subway counterparts) were demolished as well. City residents who lived near Kujōyama Station demanded that there be a Kujōyama subway station, but due to anticipated difficulties in construction, as well as an insufficient estimated number of riders, this request went unfulfilled.

[edit] Extension west

A plan exists to extend the Tōzai Line as far west as Rakusai in Nishikyō-ku, but for the time being, extension will be stopped at Uzumasa Tenjingawa; prospects beyond that are as-yet still unclear. There are several issues to be considered:

  • The population of Rakusai New Town is holding steady or decreasing;
  • Beyond Hankyu Katsura Station, Rakusaiguchi Station is already in service, and a new JR station (JR Katsura Station) is planned, so the inconvenience of transportation in that area has already been resolved to a degree;
  • The subway's high construction costs;
  • and the population of the Umezu and Kamikatsura districts leading into Rakusai New Town along the route are not very large.

[edit] Timeline

  • October 12, 1997: Opening of the section from Daigo to Nijō. The Keihan Keishin Line is incorporated into the subway.
  • November 26, 2004: Opening of the section from Rokujizō to Daigo.
  • January 16, 2008: Opening of the section from Nijō to Uzumasa Tenjingawa.

[edit] Stations

The colors indicated by the "Station Color" column in this section may not display as the correct colors, depending on your viewing environment and monitor settings.
Station Number Station Name Distance in Kilometers Station Color Connecting Lines Location
T01 Rokujizō Station 0.0 Wasurenagusa-iro
(Forget-me-not)
West Japan Railway Company Nara Line
Keihan Electric Railway Uji Line[2]
Uji
T02 Ishida Station 1.1 Aijiro
(White indigofera)
  Fushimi-ku Kyoto
T03 Daigo Station 2.4 Sakura-iro
(Cherry blossom)
 
T04 Ono Station 3.6 Kōbai-iro
(Red ume)
  Yamashina-ku
T05 Nagitsuji Station 4.9 Kosumosu-iro
(Cosmos)
 
T06 Higashino Station 5.9 Fuji-iro
(Wisteria)
 
T07 Yamashina Station 7.0 Fuji Murasaki
(Wisteria purple)
West Japan Railway Company Tōkaidō Main Line (Biwako Line), Kosei Line
Keihan Electric Railway Keishin Line[3] (at Keihan Yamashina Station)
T08 Misasagi Station 8.7 Kikyō-iro
(Chinese bellflower)
Keihan Electric Railway Keishin Line (Through service)
T09 Keage Station 10.5 Sumire-iro
(Violet)
  Higashiyama-ku
T10 Higashiyama Station 11.5 Ayame-iro
(Iris)
 
T11 Sanjō Keihan Station 12.1 Botan-iro
(Peony)
Keihan Electric Railway Keihan Main Line, Ōtō Line (at Sanjō Station)
T12 Kyoto Shiyakusho-mae Station 12.6 Karakurenai
(Crimson)
  Nakagyō-ku
T13 Karasuma Oike Station 13.5 Shu-iro
(Vermilion)
Kyoto Municipal Subway Karasuma Line (K08)
T14 Nijōjō-mae Station 14.3 Kaki-iro
(Persimmon)
 
T15 Nijō Station 15.1 Yamabuki-iro
(Globeflower)
West Japan Railway Company San'in Main Line (Sagano Line)
T16 Nishiōji Oike Station 16.2 Himawari-iro
(Sunflower)
 
T17 Uzumasa Tenjingawa Station 17.5 Remon-iro
(Lemon)
Keifuku Electric Railroad Arashiyama Main Line (at Randen Tenjingawa Station) Ukyō-ku

[edit] Highlights of the line

Daigo Station: Daigo-ji, a splendid Buddhist temple with a fine pagoda and a beautiful Japanese garden; connections to Toyotomi Hideyoshi

Kyōto Shiyakusho-mae Station: Kyoto City Hall; nearby, the rebuilt Honnō-ji, the original of which (in another part of the city) burned in the treacherous attack by Akechi Mitsuhide against Oda Nobunaga

Nijō-jō-mae Station: The Nijō Castle of Tokugawa Ieyasu

[edit] Notes

  1. ^ Kyoto Municipal Transportation Bureau (October 17, 2007). 地下鉄東西線二条~太秦天神川間が1月16日に延伸開業 (Japanese). Retrieved on November 6, 2007.
  2. ^ Some transfers require a brief walk to a nearby station. In the case of Rokujizō in particular, the station on the Keihan Uji Line is located several blocks away from the Subway and JR stations.
  3. ^ Trains of the Keihan Keishin Line operate on the Tōzai Line between Misasagi and Kyoto Shiyakusho-mae stations. One can still transfer to or from the subway at Yamashina, but an extra fee is required, as the stations are physically separate.