Image:Stwlan.dam.jpg

From Wikipedia, the free encyclopedia

Wikimedia Commons logo This is a file from the Wikimedia Commons. The description on its description page there is shown below.
Commons is a freely licensed media file repository. You can help.
Description

The upper reservoir (Llyn Stwlan) and dam of the Ffestiniog Pumped Storage Scheme in north Wales. The four water turbines at the power station can generate 360 MW of electricity within 60 seconds of the need arising.
Taken by Adrian Pingstone in 1988 and released to the public domain.

Source

Originally from en.wikipedia; description page is/was here.

Date

2003-06-02 (original upload date)

Author

Original uploader was Arpingstone at en.wikipedia

Permission
(Reusing this image)

Released into the public domain (by the author).


[edit] License information

Public domain This image has been (or is hereby) released into the public domain by its author, Arpingstone at the English Wikipedia project. This applies worldwide.

In case this is not legally possible:
Arpingstone grants anyone the right to use this work for any purpose, without any conditions, unless such conditions are required by law.

[edit] Original upload log

(All user names refer to en.wikipedia)

  • 2003-06-02 19:53 Arpingstone 750×483×8 (112585 bytes) Stwlan Dam

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current14:00, 13 August 2005750×483 (110 KB)Hellisp (The upper reservoir (Llyn Stwlan) and dam of the Ffestiniog Pumped Storage Scheme in north Wales. The four water turbines at the power station can generate 360 MW of electricity within 60 seconds of the need arising.<br> Taken by Adrian Pingstone in 1988)
The following pages on the English Wikipedia link to this file (pages on other projects are not listed):