STS-71
From Wikipedia, the free encyclopedia
This article or section includes a list of references or external links, but its sources remain unclear because it lacks in-text citations. You can improve this article by introducing more precise citations. |
STS-71 | |||||
Mission insignia |
|||||
Mission statistics | |||||
---|---|---|---|---|---|
Mission name | STS-71 | ||||
Space Shuttle | Atlantis | ||||
Launch pad | 39-A | ||||
Launch date | June 27, 1995, 19:32:19 UTC | ||||
Landing | July 7, 1995, 14:55:28 UTC, KSC, Runway 15 | ||||
Mission duration | 9 days, 19 hours, 23 minutes, 9 seconds | ||||
Orbital altitude | 170 nautical miles (315 km) | ||||
Orbital inclination | 51.6 degrees | ||||
Distance traveled | 4.1 million miles (6.6 million km) | ||||
Crew photo |
|||||
Related missions | |||||
|
STS-71 was the third mission of the US/Russian Shuttle-Mir Program, which carried out the first Space Shuttle docking to Mir, a Russian space station. The mission used Space Shuttle Atlantis, which lifted off from launch pad 39A on June 27, 1995 from Kennedy Space Center, Florida. The mission delivered a relief crew of two cosmonauts, Anatoly Solovyev and Nikolai Budarin, to the station, along with recovering American Increment astronaut Norman Thagard, and was the first in a series of seven straight missions to the station flown by Atlantis.
The five-day docking marked the creation of the largest spacecraft ever placed into orbit at that time in history, the first ever on-orbit changeout of Shuttle crew members, and the 100th manned space launch by the United States. During the docked operations, the crews of the shuttle & station carried out various on-orbit joint US/Russian life sciences investigations aboard SPACELAB/Mir and a logistical resupply of the Mir, along with the Shuttle Amateur Radio Experiment-II (SAREX-II) experiment.
Contents |
[edit] Crew
- Robert L. Gibson (5), Commander
- Charles J. Precourt (2), Pilot
- Ellen S. Baker (3), Mission Specialist
- Bonnie J. Dunbar (4), Mission Specialist
- Gregory J. Harbaugh (3), Mission Specialist
[edit] Launched: Mir-19 crew
- Anatoly Solovyev (4), MIR-19 crew upload - Russia
- Nikolai Budarin (1), MIR-19 crew upload - Russia
[edit] Landed: Mir-18 crew
- Norman E. Thagard (5), MIR-18 crew download
- Vladimir Dezhurov (1), MIR-18 crew download - Russia
- Gennady Strekalov (6), MIR-18 crew download - Russia
[edit] Mission parameters
- Mass: 12,191 kg payload
- Perigee: 342 km
- Apogee: 342 km
- Inclination: 51.6°
- Period: 88.9 min
[edit] 1st Mir docking mission
- Docked: June 29, 1995, 13:00:16 UTC
- Undocked: July 4, 1995, 11:09:42 UTC
- Time Docked: 4 days, 22 h, 9 min, 26 s
[edit] Mission highlights
The primary objectives of this flight were to rendezvous and perform the first docking between the Space Shuttle and the Russian Space Station Mir on June 29. In the first U.S.-Soviet docking in twenty years, Atlantis delivered a relief crew of two cosmonauts Anatoly Solovyev and Nikolai Budarin to Mir.
Other prime objectives were on-orbit joint United States of America-Russian life sciences investigations aboard SPACELAB/Mir, logistical resupply of the Mir and recovery of US astronaut Norman E. Thagard.
Secondary objectives included filming with the IMAX camera and the Shuttle Amateur Radio Experiment-II (SAREX-II) experiment.
STS-71 marked a number of historic firsts in human spaceflight history: the 100th U.S. human space launch conducted from the Cape; first U.S. Space Shuttle-Russian Space Station docking and joint on-orbit operations; largest spacecraft ever in orbit; and the first on-orbit changeout of Shuttle crew.
Docking occurred at 9 a.m. EDT, June 29, using R-Bar or Earth radius vector approach, with Atlantis closing in on Mir from directly below. R-bar approach allows natural forces to brake the orbiter's approach more than would occur along standard approach directly in front of the space station; also, an R-bar approach minimizes the number of orbiter jet firings needed for approach. The manual phase of the docking began with Atlantis about a half-mile (800 m) below Mir, with Gibson at the controls on aft flight deck. Stationkeeping was performed when the orbiter was about 250 feet (75 m) from Mir, pending approval from Russian and U.S. flight directors to proceed. Gibson then maneuvered the orbiter to a point about 30 feet (10 m) from Mir before beginning the final approach to station. Closing rate was close to the targeted 0.1 foot per second (30 mm/s), being approximately 0.107 foot per second (33 mm/s) at contact. Interface contact was nearly flawless: less than one inch (25 mm) lateral misalignment and an angular misalignment of less than 0.5 degrees per axis. Docking occurred about 216 nautical miles (400 km) above Lake Baikal region of the Russian Federation. The Orbiter Docking System (ODS) with Androgynous Peripheral Docking System served as the actual connection point to a similar interface on the docking port on Mir's Kristall module. ODS, located in the forward payload bay of Atlantis, performed flawlessly during the docking sequence.
When linked, Atlantis and Mir formed the largest spacecraft ever in orbit, with a total mass of about 225 metric tons (almost one-half million pounds), orbiting some 218 nautical miles (404 km) above the Earth. After hatches on each side opened, STS-71 crew passed into Mir for a welcoming ceremony. On the same day, the Mir 18 crew officially transferred responsibility for the station to the Mir 19 crew, and the two crews switched spacecraft.
For the next five days, about 100 hours in total, joint U.S.-Russian operations were conducted, including biomedical investigations, and transfer of equipment to and from Mir. Fifteen separate biomedical and scientific investigations were conducted, using the Spacelab module installed in the aft portion of Atlantis's payload bay, and covering seven different disciplines: cardiovascular and pulmonary functions; human metabolism; neuroscience; hygiene, sanitation and radiation; behavioral performance and biology; fundamental biology; and microgravity research. The Mir 18 crew served as test subjects for investigations. Three Mir 18 crew members also carried out an intensive programme of exercise and other measures to prepare for re-entry into gravity environment after more than three months in space.
Numerous medical samples as well as disks and cassettes were transferred to Atlantis from Mir, including more than 100 urine and saliva samples, about 30 blood samples, 20 surface samples, 12 air samples, several water samples and numerous breath samples taken from Mir 18 crew members. Also moved was a broken Salyut-5 computer. Transferred to Mir were more than 1,000 pounds (450 kg) of water generated by the orbiter for waste system flushing and electrolysis; specially designed spacewalking tools for use by the Mir 19 crew during a spacewalk to repair a jammed solar array on the Spektr module; and transfer of oxygen and nitrogen from Shuttle's environmental control system to raise air pressure on the station, to improve Mir's consumables margin.
The spacecraft undocked on July 4, following a farewell ceremony, with the Mir hatch closing at 3:32 p.m. EDT. July 3 and hatch on Orbiter Docking System shut 16 minutes later. Gibson compared separation sequence to a "cosmic" ballet: Prior to the Mir-Atlantis undocking, the Mir 19 crew temporarily abandoned station, flying away from it in their Soyuz spacecraft so they could record images of Atlantis and Mir separating. Soyuz unlatched at 6:55 a.m. EDT, and Gibson undocked Atlantis from Mir at 7:10 a.m. EDT.
The returning crew of eight equaled the largest crew (STS-61-A, October 1985) in Shuttle history. To ease their re-entry into gravity environment after more than 100 days in space, Mir 18 crew members Thagard, Dezhurov and Strekalov lay supine in custom-made recumbent seats installed prior to landing in the orbiter middeck.
Inflight problems included a glitch with General Purpose Computer 4 (GPC 4), which was declared failed when it did not synchronize with GPC 1; subsequent troubleshooting indicated it was an isolated event, and GPC 4 operated satisfactorily for the remainder of mission.
[edit] See also
- Space science
- List of space shuttle missions
- List of spacecraft and crews that visited Mir
- List of human spaceflights chronologically
[edit] External links
|
|
|