State Transport Authority (South Australia)
From Wikipedia, the free encyclopedia
- This article is about the State Transport Authority in South Australia. The same name was also used in the State of Victoria.
The State Transport Authority (STA) was the government agency which controlled public transport within the State of South Australia between 1974 and 1994.
The STA was established by the State Transport Authority Act 1974, which aimed to provide an integrated and coordinated system of public transport within South Australia. This was to be achieved by assuming direct control of state-operated services (particularly in the Adelaide metropolitan area) and by exercising regulatory control of privately operated services.
The STA was dissolved (and the 1974 Act repealed) as a consequence of the Passenger Transport Act 1994. These reforms split the STA into the Passenger Transport Board, which coordinated and funded the public transport system, and TransAdelaide, which actually operated metropolitan buses, trains and trams. The formation of TransAdelaide was a prelude to competitive tendering and the introduction of private operators into the Adelaide public transport network.
Contents |
[edit] Formation
In the period following its establishment on 18 April 1974, the State Transport Authority took over the functions of three government agencies. These were initially structured as three independent Divisions of the STA:
- The former South Australian Railways Commission became the Rail Division on 8 December 1975.
- The former Municipal Tramways Trust (MTT) became the Bus & Tram Division, also on 8 December 1975. By this time all of Adelaide’s tramways had closed, except the Glenelg line. However the MTT continued to operate most of the local bus routes in the inner metropolitan area, which often followed former tram lines. The MTT was also involved in buying out many of the private bus operators then operating in the Adelaide suburbs.
- The former Transport Control Board became the Regulation Division of the STA.
[edit] Sale of railways
In 1975 the Labor-controlled Federal Government led by Gough Whitlam proposed a nationalisation program for Australia’s railways. It was recognized at the time that Australia’s system of separate state-controlled railways led to unnecessary duplication of facilities and administration, inefficient operating practices, limited standardization, high costs and the lack of a uniform national approach to railway policy. Whitlam’s proposal aimed to address these issues.
South Australia and Tasmania were the only states which agreed to the nationalization plan (these were the two states controlled by state Labor governments at the time), and in South Australia’s case the transfer agreement only extended to railways outside the Adelaide suburban area.
On 1 July 1975 the Federal Government took over financial responsibility for the non-metropolitan railways in South Australia and reimbursed the South Australian government for operating deficits incurred after this time. After formation of the Rail Division on 8 December 1975, the STA continued to administer and operate all the ex-South Australian Railways (SAR) on behalf of the Federal government. This interim arrangement lasted for over two years while the precise details of the sale of S.A.’s railways were devised, disputed and re-negotiated, and the operating and management structures of the new Federal-controlled railway were put into place.
Eventually, on 1 March 1978 the responsibility for management of all South Australia’s non-metropolitan railways was transferred to the new Australian National Railways Commission. This included much of the former SAR infrastructure, rolling stock and staff.
The STA retained ownership and responsibility for all the suburban railway system around Adelaide, including the centrally-located Adelaide Railway Station, the entire fleet of Redhen railcars and two diesel locomotives. At the same time, March 1978, the separate Rail and Bus & Tram Divisions of the STA were combined into an integrated management structure.
[edit] Chronology
The following developments occurred in Adelaide’s public transport system during the STA era.
- 25 January 1976 The railway line was extended southwards from Hallett Cove Beach to a temporary terminus at Christie Downs. The opening of the rail line extension was the first public event where the new STA name and logo was prominently used.
- 1976 Smoking was banned on Adelaide’s buses.
- 4 February 1977 A new bus depot was opened at Morphettville in the south-western suburbs.
- 1977 to 1980 The STA took delivery of 307 new Volvo B59 buses. The Volvos updated and standardized the metropolitan bus fleet, which at the time comprised a wide variety of vehicle types and ages following buy-out of a number of private operators. The silver Volvo B59s were a familiar feature of Adelaide streets over the next 20 – 25 years. The last example was withdrawn from service in 2003.
- 31 October 1977 The Circle Line bus service was introduced.
- 1 March 1978 Non-metro railways were transferred to the Australian National Railways Commission.
- 2 April 1978 The extension of the railway southwards from Hallett Cove was completed and Noarlunga Centre station opened.
- Oct 1978 to Apr 1979 The wooden tramway bridge over the railway lines at Goodwood station was replaced with the current concrete structure. The wooden bridge had been built in 1929, at the time the Glenelg line was converted from railway to tramway.
- 4 February 1979 A zone-based fare system was introduced across Adelaide, with integrated rail and bus tickets allowing transfers between modes.
- February 1980 The first 2000-class diesel railcars entered public service, 2101, 2102 and 2001 ran its first passenger service on 22 Feb 1980 while 2103,2104 and 2002 were introduced shortly after. Delivery of the new trains continued until August 1981 when 2118 and 2012 were the final cars to be delivered. The initial branding as SuperTrain 2000 has not persisted, but the unofficial nickname of Jumbos has.
- 1980 The first new Volvo B58 buses were delivered for longer-distance suburban routes and services into the Hills. These were painted in a characteristic brown and cream livery.
- 1981 New rail stations were opened in September 1981 at North Haven on the Outer Harbor line, and in November 1981 at Christie Downs on the Noarlunga line.
- 18 May 1984 The few remaining Australian National (AN) country passenger trains and The Overland to Melbourne were transferred from Adelaide station to the new interstate facility at Keswick Terminal. Keswick Terminal allowed access by interstate passenger trains such as the Indian Pacific which used the newly opened standard gauge line from Crystal Brook. It also allowed AN to avoid paying access charges to the STA for use of Adelaide station.
- 1985 The ASER project, involving major redevelopment of the Adelaide Railway station got underway.
- December 1985 Salisbury Interchange on the Gawler line opened to provide improved bus – rail connections in the northern suburbs. Salisbury was the second purpose-built bus-rail interchange in Adelaide – Noarlunga Centre had been the first.
- 2 March 1986 The first 6km stage of the O-Bahn Busway opened between the city’s eastern fringe and Paradise Interchange in the north-eastern suburbs. The O-Bahn is a unique public transport system, running on specially built concrete track with modified buses and combining elements of both bus and rail systems.
- 18 October 1986 The Glenelg tram depot was relocated from Angas Street in Adelaide city centre to a new purpose-build facility at Glengowrie, close to Glenelg.
- 27 September 1987 A new Crouzet computerized ticket system was introduced across the STA bus, train and tram system. This was the basis of today’s MetroTicket system. Paper tickets were replaced by magnetic-stripe tickets, which are checked by an electronic validating machine each time a passenger boards a vehicle, and Weekly and Monthly tickets were replaced by 10-journey Multitrips.
- November 1987 The first of a new fleet of 3000-class diesel-electric railcars entered public service. These would eventually replace the Redhen railcars, which had been the mainstay of the suburban train service since the late 1950s.
- 1988 The ASER redevelopment project was completed at Adelaide station. The station platforms became effectively underground, with the Hyatt Regency hotel and Adelaide Convention Centre built above. The former main station building was re-opened as a casino.
- 20 August 1989 The second stage of the 12km-long O-Bahn Busway opened between Paradise Interchange and Tea Tree Plaza Interchange at Modbury. The final cost of the project was A$98 million, which included the new fleet of specially-modified buses, based at St.Agnes depot.
- 1990 Following rebuilding of the tracks and platforms in 1985 – 88, the Adelaide station concourse was refurbished.
- 1990 A 4-year project to renew outdated signaling on the STA railway system was completed. New signals were installed and all STA trains and rail lines were supervised from a computerized traffic control centre in Adelaide station yard.
- 17 February 1992 The first Transit Link limited-stop bus route, numbered TL1, was introduced between Aberfoyle Park and Adelaide. This initiative aimed to attract peak-hour motorists onto public transport by providing frequent, fast, limited-stop services, using high-quality vehicles and traffic priority schemes (e.g. bus lanes and bus-priority traffic signals) where practical.
- 1992 Driver-only operation was introduced on STA trains and guards were progressively withdrawn. This led to a significant increase in fare evasion, since there were no-longer regular ticket inspections, and there was generally nowhere on the trains or stations to buy a ticket if a casual traveler had not planned ahead and pre-purchased one from a retail outlet.
The reduced supervision also helped compound a trend of increasing vandalism, disorderly behaviour and crime that had plagued the STA system (both bus and train) since the late 1980’s. The transit police force was increased and Transit Officers replaced guards on some trains, but negative public perceptions about personal safety and difficulty in getting tickets and information resulted in decreased patronage of many services.
- 16 August 1992 A new bus depot was opened at Mile End and the Hackney depot was closed. Hackney had been the main depot in Adelaide since the first electric tram lines opened in 1909, and had subsequently been converted by the MTT for use by trolleybuses and diesel buses.
- 16 August 1992 The Transit Link concept was introduced on two new bus routes (TL2 to West Lakes and TL3 to Golden Grove and Elizabeth), and to express peak-hour trains on three of the main rail lines.
- 16 August 1992 Changes were implemented which reduced services on most bus and train routes at night and at weekends. Train frequencies were reduced from approximately every 45 minutes to hourly. On the bus network, a separate “Nights & Sundays” pattern of routes was introduced, which often combined one or more daytime routes into circuitous and one-way hybrid routes. The rationale stated at the time was that evening and weekend services were very poorly patronized and the changes were needed to free resources to operate the new Transit Link routes.
- 5 July 1993 A bus-rail interchange was opened at Smithfield on the Gawler line.
- 21 November 1993 The successful Transit Link concept was extended to five new bus routes, TL6 to TL10.
- 1 July 1994 The STA organization was dissolved as a result of the Passenger Transport Act 1994. The Passenger Transport Board and TransAdelaide assumed the functions formerly carried out by the STA.
[edit] Railway line closures
In past years, one feature of Adelaide’s railway system was the number of industrial branch lines which were intended mainly for freight, but were also provided with passenger trains at peak hours. These industrial trains were progressively rationalised during the STA era, along with some other lightly-used services.
Railway closures in STA era | ||
---|---|---|
Destination | Date of last train | Stations closed |
Semaphore | 29 October 1978 | Semaphore Exeter |
Finsbury | 17 August 1979 | Woodville North No.18 Shed Finsbury Stores |
ICI Osborne | 1 January 1980 | ICI Osborne |
Hendon | 1 February 1980 | Hendon |
Port Dock | 11 September 1981 | Port Dock |
Islington Workshops | 31 July 1986 | Islington Workshops |
Northfield | 24 July 1987 | Cavan Pooraka Northfield |
Bridgewater | 26 July 1987 | National Park Long Gully Upper Sturt Mount Lofty Heathfield Madurta Aldgate Jibilla Carripook Bridgewater |
Dry Creek to Port Adelaide | 27 May 1988 (§ closed 29 May 1987) |
§ Wingfield § North Arm Road § Eastern Parade Grand Junction Road Rosewater |
Penfield | 4 January 1991 | Hilra Penfield No.1 Penfield No.2 |
GMH Elizabeth | 14 August 1992 | GMH Elizabeth |
Note regarding closure dates: Common railway practice is to record the official closure of a line as a date which falls on a Sunday. In cases where the train service only operated Monday to Friday, this means the last train would actually have run on the preceding Friday. This was the situation in most (but not all) examples in the table above. Hence the “last train” date quoted may differ by a day or two from the official record.
[edit] References
- State Transport Authority Annual Reports, 1977 to 1994
- Transit Australia (Journal of the Australian Electric Traction Association Inc.), pub. Transit Australia Publishing, Sydney ISSN 0818-5204
- Catch Point (Journal of the Australian Railway Historical Society (SA Div) Inc.), pub. Port Dock Station Railway Museum (SA) Inc.
[edit] See also
- TransAdelaide
- Adelaide Metro
- O-Bahn Busway
- List of Adelaide railway stations
- List of closed Adelaide railway stations
- Adelaide Railway Station
- Railways in Adelaide
- Rail transport in South Australia
- Redhen railcar
- Glenelg Tram
- 3000 class railcar