Seoul Subway Line 7
From Wikipedia, the free encyclopedia
Seoul Subway Line 7 | ||||||||
---|---|---|---|---|---|---|---|---|
Transfer Sign |
||||||||
Korean name | ||||||||
|
Seoul Subway Line 7 of the Seoul Metropolitan Rapid Transit Corporation was built 1990-96 (Jangam-Konkuk Univ.) and was completed 1 August 2000 (central section 17 km. Konkuk University to Sinpung); the western section between Sinpung and Onsu was put into service on 29 February 2000. This north-south line does not run through the city centre but links Gangnam directly to the northern parts of town.
The future plan is an extension to Incheon Subway Line 1 to relieve the traffic congestion in western Seoul and northern Incheon. 9 stations will be added by 2010 for the 9.8 km extension, starting from Onsu Station of Line 7 and ending at Bupyeong-gu Office Station of Incheon Subway Line 1.[1] By that time, this line will run through 5 cities. Current length: 46.9 km.
Contents |
[edit] Technical Information
[edit] Manufacturer
The trains manufactured for the initial opening stage (stations Jangam and Kunkuk University) in 1996 were manufactured by DaeWoo Heavy Industries between 1995 and 1996 and they used inverters from GEC-ALSTOM.
For the second opening stage between Shinpung and Onsu and in preparation for the opening of stations Shinpung and Kunkuk University, Hanjin Heavy Industries manufactured new trains using Toshiba inverters. Currently, all line 7 trains are being modified to be fire resistant.
[edit] Train Specifications
Manufacturer | Daewoo and Hanjin (ROTEM) | |
Incorporation Date | Daewoo: 1995-1996 / Hanjin: 1999-2000 | |
Maximium Rated Speed | 100km/h | |
Maximium Operation Speed | 80km/h | |
Average Operation Speed | 32.34km/h[2] | |
Length of each car | 19.5m | |
Width of each car | 3.12m | |
Height of each car | 1.15m | |
Control Method | VVVF(Variable Voltage, Variable Frequency) Inverter Control Method | |
Rate of Acceleration | 3.0km/h/s | |
Rate of Deceleration | 3.5km/h/s | |
Rate of Emergency Deceleration | 4.5km/h/s | |
Electrical Specification | 1500V DC | |
Signal Systems | ATC, ATO | |
Signal Systems in use | ATC (All Tracks) |
[edit] Train Car Composition
Side facing Jangam < 71xy - 72xy - 73xy - 74xy - 75xy - 76xy - 77xy - 70xy > Side facing Onsu.
Side facing Jangam < Tc - Mp - M - T - T - Mp - M - Tc > Side facing Onsu.
Tc: Control Trailer Mp: Motor Car w/ Pantograph M: Motor Car w/o Pantograph T: Trailer.
[edit] Stations
Station # | Station Name | Transferrable Lines | Station Type | Doors Open |
in Gyeonggi province | ||||
709 | Jangam | Aboveground/Straight | Right | |
in Seoul | ||||
710 | Dobongsan | Line 1 via Gyeongwon | Aboveground/Curved | Right |
711 | Suraksan | Underground/Straight | Left | |
712 | Madeul | Underground/Straight | Left | |
713 | Nowon | Line 4 | Underground/Straight | Left |
714 | Junggye | Underground/Curved | Left | |
715 | Hagye | Underground/Straight | Left | |
716 | Gongneung | Underground/Curved | Right | |
717 | Taereung | Line 6 | Underground/Straight | Right |
718 | Meokgol | Underground/Straight | Right | |
719 | Junghwa | Underground/Curved | Right | |
720 | Sangbong | Jungang Line (under construction) | Underground/Curved | Right |
721 | Myeonmok | Underground/Curved | Right | |
722 | Sagajeong | Underground/Straight | Right | |
723 | Yongmasan | Underground/Curved | Right | |
724 | Junggok | Underground/Straight | Right | |
725 | Gunja | Line 5 | Underground/Straight | Right |
726 | Children's Grand Park | Underground/Straight | Right | |
727 | Konkuk Univ. | Line 2 | Underground/Straight | Right |
728 | Ttukseom Resort | Elevated/Straight | Right | |
729 | Cheongdam | Underground/Straight | Left | |
730 | Gangnam-gu Office | Bundang Line (Under Construction) | Underground/Curved | Right |
731 | Hak-dong | Underground/Straight | Right | |
732 | Nonhyeon | Sin Bundang Line (planned) | Underground/Straight | Right |
733 | Banpo | Underground/Straight | Right | |
734 | Express Bus Terminal | Line 3, Line 9 (under construction) | Underground/Curved | Right |
735 | Naebang | Underground/Straight | Right | |
736 | Isu | Line 4 | Underground/Curved | Right |
737 | Namseong | Underground/Curved | Right | |
738 | Soongsil University | Underground/Straight | Right | |
739 | Sangdo | Underground/Straight | Right | |
740 | Jangseungbaegi | Underground/Curved | Right | |
741 | Sindaebangsamgeori | Underground/Straight | Right | |
742 | Boramae | Underground/Straight | Left | |
743 | Sinpung | Underground/Straight | Right | |
744 | Daerim | Line 2 | Underground/Straight | Right |
745 | Namguro | Underground/Straight | Right | |
746 | Gasan Digital Complex (가산디지털단지역) (formerly Garibong) | Line 1 via Gyeongbu | Underground/Curved | Right |
in Gyeonggi province | ||||
747 | Cheolsan | Underground/Curved | Right | |
748 | Gwangmyeongsageori | Underground/Straight | Right | |
in Seoul | ||||
749 | Cheonwang | Underground/Curved | Right | |
750 | Onsu | Line 1 via Gyeongin | Underground/Curved | Random |
in Gyeonggi province | ||||
751 | Bamgol (Under Construction) | Underground/Curved | ||
752 | Dangarae (Under Construction) | Underground | ||
753 | Chunyisageori (Under Construction) | Underground/Curved | ||
754 | Jungbu Police Station (Under Construction) | Underground/Straight | ||
755 | Bucheon City Hall (Under Construction) | Underground/Straight | ||
756 | Theme Park (Under Construction) | Underground | ||
in Incheon | ||||
757 | Samsan (Under Construction) | Underground | ||
758 | Gaehung (Under Construction) | Underground/Straight | ||
759 | Bupyeong-gu Office (Under Construction) | Incheon Subway Line 1 | Underground/Straight |
[edit] See also
[edit] References
[edit] External links
- Seoul Metropolitan Government's Line 7 extension page includes a route map and status information for the westward extension from Onsu.
- UrbanRail.Net's Seoul Subway Page
|
|