Seoul Subway Line 7

From Wikipedia, the free encyclopedia

Seoul Subway Line 7
Transfer Sign
Transfer Sign
Korean name
Hangul 서울 지하철 제7호선
Hanja 서울 地下鐵 第七號線
Revised Romanization Seoul Jihacheol Chil-ho-seon
McCune-Reischauer Sŏul Chihach'ŏl Chil-ho-sŏn

Seoul Subway Line 7 of the Seoul Metropolitan Rapid Transit Corporation was built 1990-96 (Jangam-Konkuk Univ.) and was completed 1 August 2000 (central section 17 km. Konkuk University to Sinpung); the western section between Sinpung and Onsu was put into service on 29 February 2000. This north-south line does not run through the city centre but links Gangnam directly to the northern parts of town.

The future plan is an extension to Incheon Subway Line 1 to relieve the traffic congestion in western Seoul and northern Incheon. 9 stations will be added by 2010 for the 9.8 km extension, starting from Onsu Station of Line 7 and ending at Bupyeong-gu Office Station of Incheon Subway Line 1.[1] By that time, this line will run through 5 cities. Current length: 46.9 km.

Contents

[edit] Technical Information

[edit] Manufacturer

The trains manufactured for the initial opening stage (stations Jangam and Kunkuk University) in 1996 were manufactured by DaeWoo Heavy Industries between 1995 and 1996 and they used inverters from GEC-ALSTOM.

For the second opening stage between Shinpung and Onsu and in preparation for the opening of stations Shinpung and Kunkuk University, Hanjin Heavy Industries manufactured new trains using Toshiba inverters. Currently, all line 7 trains are being modified to be fire resistant.

[edit] Train Specifications

Manufacturer Daewoo and Hanjin (ROTEM)
Incorporation Date Daewoo: 1995-1996 / Hanjin: 1999-2000
Maximium Rated Speed 100km/h
Maximium Operation Speed 80km/h
Average Operation Speed 32.34km/h[2]
Length of each car 19.5m
Width of each car 3.12m
Height of each car 1.15m
Control Method VVVF(Variable Voltage, Variable Frequency) Inverter Control Method
Rate of Acceleration 3.0km/h/s
Rate of Deceleration 3.5km/h/s
Rate of Emergency Deceleration 4.5km/h/s
Electrical Specification 1500V DC
Signal Systems ATC, ATO
Signal Systems in use ATC (All Tracks)

[edit] Train Car Composition

Side facing Jangam < 71xy - 72xy - 73xy - 74xy - 75xy - 76xy - 77xy - 70xy > Side facing Onsu.

Side facing Jangam < Tc - Mp - M - T - T - Mp - M - Tc > Side facing Onsu.

Tc: Control Trailer Mp: Motor Car w/ Pantograph M: Motor Car w/o Pantograph T: Trailer.

[edit] Stations

Line 7 Ttukseom Resort station
Line 7 Ttukseom Resort station
Station # Station Name Transferrable Lines Station Type Doors Open
in Gyeonggi province
709 Jangam Aboveground/Straight Right
in Seoul
710 Dobongsan Line 1 via Gyeongwon Aboveground/Curved Right
711 Suraksan Underground/Straight Left
712 Madeul Underground/Straight Left
713 Nowon Line 4 Underground/Straight Left
714 Junggye Underground/Curved Left
715 Hagye Underground/Straight Left
716 Gongneung Underground/Curved Right
717 Taereung Line 6 Underground/Straight Right
718 Meokgol Underground/Straight Right
719 Junghwa Underground/Curved Right
720 Sangbong Jungang Line (under construction) Underground/Curved Right
721 Myeonmok Underground/Curved Right
722 Sagajeong Underground/Straight Right
723 Yongmasan Underground/Curved Right
724 Junggok Underground/Straight Right
725 Gunja Line 5 Underground/Straight Right
726 Children's Grand Park Underground/Straight Right
727 Konkuk Univ. Line 2 Underground/Straight Right
728 Ttukseom Resort Elevated/Straight Right
729 Cheongdam Underground/Straight Left
730 Gangnam-gu Office Bundang Line (Under Construction) Underground/Curved Right
731 Hak-dong Underground/Straight Right
732 Nonhyeon Sin Bundang Line (planned) Underground/Straight Right
733 Banpo Underground/Straight Right
734 Express Bus Terminal Line 3, Line 9 (under construction) Underground/Curved Right
735 Naebang Underground/Straight Right
736 Isu Line 4 Underground/Curved Right
737 Namseong Underground/Curved Right
738 Soongsil University Underground/Straight Right
739 Sangdo Underground/Straight Right
740 Jangseungbaegi Underground/Curved Right
741 Sindaebangsamgeori Underground/Straight Right
742 Boramae Underground/Straight Left
743 Sinpung Underground/Straight Right
744 Daerim Line 2 Underground/Straight Right
745 Namguro Underground/Straight Right
746 Gasan Digital Complex (가산디지털단지역) (formerly Garibong) Line 1 via Gyeongbu Underground/Curved Right
in Gyeonggi province
747 Cheolsan Underground/Curved Right
748 Gwangmyeongsageori Underground/Straight Right
in Seoul
749 Cheonwang Underground/Curved Right
750 Onsu Line 1 via Gyeongin Underground/Curved Random
in Gyeonggi province
751 Bamgol (Under Construction) Underground/Curved
752 Dangarae (Under Construction) Underground
753 Chunyisageori (Under Construction) Underground/Curved
754 Jungbu Police Station (Under Construction) Underground/Straight
755 Bucheon City Hall (Under Construction) Underground/Straight
756 Theme Park (Under Construction) Underground
in Incheon
757 Samsan (Under Construction) Underground
758 Gaehung (Under Construction) Underground/Straight
759 Bupyeong-gu Office (Under Construction) Incheon Subway Line 1 Underground/Straight

[edit] See also