Sana'a International Airport
From Wikipedia, the free encyclopedia
Sana'a International Airport | |||
---|---|---|---|
IATA: SAH - ICAO: OYSN | |||
Summary | |||
Airport type | Military/Public | ||
Operator | N/A | ||
Serves | Sana'a | ||
Elevation AMSL | 7,216 ft (2,199 m) | ||
Coordinates | |||
Runways | |||
Direction | Length | Surface | |
ft | m | ||
18/36 | 10,669 | 3,252 | Asphalt |
Sana'a International Airport (IATA: SAH, ICAO: OYSN) is a public airport located in Sana'a, the capital of Yemen.
[edit] Airlines and destinations
- Air Arabia (Sharjah)
- EgyptAir (Cairo)
- Emirates (Dubai)
- Ethiopian Airlines (Addis Ababa)
- Gulf Air (Bahrain)
- Lufthansa (Frankfurt, Riyadh)
- Qatar Airways (Doha)
- Royal Jordanian (Amman)
- Saudi Arabian Airlines (Jeddah)
- Syrian Arab Airlines (Damascus)
- Turkish Airlines (Istanbul-Atatürk)
- Yemenia (Abu Dhabi, Addis Ababa, Aden, Amman, Asmara, Bahrain, Beirut, Cairo, Damascus, Dar Es Salaam, Dhaka, Djibouti, Doha, Dubai, Frankfurt, Hodeidah, Jakarta, Jeddah, Johannesburg, Karachi, Khartoum, Kuala Lumpur, Kuwait, London-Heathrow, Marseilles, Moroni, Mumbai, Paris-Charles de Gaulle, Riyadh, Riyan, Rome-Fiumicino, Seiyun, Socotra, Taiz)
Sana’a International Airport terminal 2 (Open 2009)
Budgets• 20% will be funded by the Government of the Republic of Yemen while the remaining 80% will be funded by Arab Fund for Economic & Social Development, Kuwait.
Phases • Phase[ I] Strengthen runway ‘ aprone and parallel taxiway • Phase[ II] is a new passenger International Terminal Building • Phase[ III] is Airfield Infrastructure and Ancillary Buildings
Construction schedule The anticipated commencement date of the construction works will be 24 months with a subsequent maintenance period of 12 months for civil / construction work and 24 month for electrical, electronic and mechanical ( Equipment and Instillation) works.
[edit] External links
- Airport information for OYSN at World Aero Data
www.yemencivilaviation.com