Rail tracks

From Wikipedia, the free encyclopedia

Rail gauge
Broad gauge
Standard gauge
Scotch gauge
Narrow gauge
Minimum gauge
List of rail gauges
Dual gauge
Gauge conversion
Break-of-gauge
Rail tracks
Tramway track
[edit]
Rail tracks.
Rail tracks.

Rail tracks are used on railways (or railroads), which, together with railroad switches (or points), guide trains without the need for steering. Tracks consist of two parallel steel rails, which are laid upon sleepers (or cross ties) that are embedded in ballast to form the railroad track. The rail is fastened to the ties with rail spikes, lag screws or clips such as Pandrol clips.

The type of fastener depends partly on the type of sleeper, with spikes being used on wooden sleepers, and clips being used more on concrete sleepers.

Usually, a baseplate tie plate is used between the rail and wooden sleepers, to spread the load of the rail over a larger area of the sleeper. Sometimes spikes are driven through a hole in the baseplate to hold the rail, while at other times the baseplates are spiked or screwed to the sleeper and the rails clipped to the baseplate.

Steel rails can carry heavier loads than any other material. Railroad ties spread the load from the rails over the ground and also serve to hold the rails a fixed distance apart (called the gauge.)

Rail tracks are normally laid on a bed of coarse stone chippings known as ballast, which combines resilience, some amount of flexibility, and good drainage. Steel rails can also be laid onto a concrete slab (a slab track). Across bridges, track is often laid on ties across longitudinal timbers or longitudinal steel girders.

Contents

[edit] Rail

Cross-sections of flat-bottomed rail, which can rest directly on the sleepers, and bullhead rail which sits in a chair (not shown).
Cross-sections of flat-bottomed rail, which can rest directly on the sleepers, and bullhead rail which sits in a chair (not shown).
Main article: Rail profile

Hot rolled steel in the profile of an asymmetrical I-beam is usually used as the surface on which railway wheels run. Unlike some other uses of iron and steel, railway rails are subject to very high stresses and have to be made of very high quality steel. It took many decades to improve the quality of the materials, including the change from iron to steel. For example, minor flaws in the steel that pose no problems in reinforcing rods for buildings, can, however, lead to broken rails and dangerous derailments when used on railway tracks. The heavier the rails and the rest of the trackwork, the heavier and faster the trains these tracks can carry.

Profiles of rail include:

[edit] Rail support

Main article: Railroad tie

A railroad tie, cross tie, or railway sleeper is a rectangular object used as a base for railroad tracks. Sleepers are members generally laid transverse to the rails, on which the rails are supported and fixed, to transfer the loads from rails to the track ballast and sub grade below, and to hold the rails to the correct gauge.

[edit] Rail classification (weight)

Weight mark on a jointed segment of 155 pound "Pennsylvania Special" rail.  The heaviest grade of rail ever mass produced.
Weight mark on a jointed segment of 155 pound "Pennsylvania Special" rail. The heaviest grade of rail ever mass produced.
Main article: Rail profile

Rail is graded by weight over a standard length. Heavier rail can support greater axle loads and higher train speeds without sustaining damage, compared to lighter rail, but at a greater cost. In North America and the UK, rail is graded in units of pounds per yard (usually just shown as 'lb'), so "130-pound rail" would weigh 130 lb per linear yard (about 59 kg). The usual range is 115 to 141 lbs (about 52 to about 64 kg). In Europe rail is graded in kg/m and the usual range is 40 to 60 kg/m (81 to 126 pounds). The heaviest rail ever mass-produced was 155 pounds (about 70 kg) and was rolled for the Pennsylvania Railroad.

[edit] Joining rails

Rails are produced in fixed lengths and need to be joined into continuous lengths for trains to run upon.

[edit] Jointed track

Fishplate between two sections of jointed bullhead rail
Fishplate between two sections of jointed bullhead rail
Bonded main line 6-bolt rail joint on a segment of 155lb rail.
Bonded main line 6-bolt rail joint on a segment of 155lb rail.

There are different ways of joining rails together to form tracks. The traditional method was to bolt rails together in what is known as jointed track. In this form of track, lengths of rail, usually around 20 metres (60 ft) long, are laid and fixed to sleepers (UK) (crossties, or simply ties in North American parlance), and are joined to other lengths of rail with steel plates known as fishplates (UK) or joint bars (N.A.).

Historically, North American railroads until the mid to late 20th century used sections of rail that measured 39 feet (11.9 m) long so they could be carried to and from a worksite in conventional gondolas, which often measured 40 feet (12.2 m) long; as car sizes increased, so did rail lengths.

Fishplates or joint bars are usually 60 centimetres (2 ft) long, and are bolted through each side of the rail ends with bolts (usually four, but sometimes up to six.) Small gaps known as expansion joints are deliberately left between the rails to allow for expansion of the rails in hot weather. The holes through which the fishplate bolts pass are oval to allow for expansion.

British practice was always to have the rail joints on both rails adjacent to each other, while North American practice is to stagger them.

Because of the small gaps left between the rails, when trains pass over jointed tracks, they make a "clickety clack" sound. Unless it is well maintained, jointed track doesn't have the ride quality of welded rail, and is unsuitable for high speed trains. A major problem is cracking around the bolt holes, which can lead to the rail head breaking. This was the cause of the Hither Green rail crash which caused British Railways to begin converting much of its track to Continuous Welded Rail. However, it is still used in many countries on lower speed lines and sidings. Jointed track is still extensively used in poorer countries due to the lower construction cost and lack of modernization of their railway systems.

[edit] Insulated joints

Where track circuits exist for signalling purposes, insulated block joints are required. These compound the weakness of ordinary block joints. Specially made glued joints, where all the gaps filled with epoxy resin increases the strength again. Audio frequency track circuits replace the conventional block joint with a tuned loop which uses approximately 20 m of the rail as part of the blocking circuit. Axle counters can also reduce the number of track circuits and thus the number of insulated rail joints.

[edit] Continuous welded rail

Welded rail joint
Welded rail joint
A pull-apart on the Long Island Rail Road Babylon Branch being repaired by using flaming rope to expand the rail back to a point where it can be joined together.
A pull-apart on the Long Island Rail Road Babylon Branch being repaired by using flaming rope to expand the rail back to a point where it can be joined together.

Most modern railways use continuous welded rail (CWR), sometimes referred to as ribbon rails. In this form of track, the rails are welded together by utilising flash butt welding to form one continuous rail that may be several kilometres long, or thermite welding to repair or splice together existing CWR segments. Because there are few joints, this form of track is very strong, gives a smooth ride, and needs less maintenance. The first welded track was used in the 1920s and 30s[1] and has become common on main lines since the 1950s.

Flash butt welding is the preferred process which involves an automated track laying machine running a strong electrical current through the touching ends of two unjoined pieces of rail. The ends become white hot due to electrical resistance and are then pressed together forming a strong weld. Thermite welding is a manual process requiring a reaction crucible and form to contain the molten iron. Thermite-bonded joints are also seen as less reliable and more prone to fracture or break.

Because of the increased strength of welded track, trains can travel on it at higher speeds and with less friction. Welded rails are more expensive to lay than jointed tracks, but have much lower maintenance costs.

Rails expand in hot weather and shrink in cold weather. Because welded track has very few expansion joints, if no special measures are taken it could become distorted in hot weather and cause a derailment (a condition known in America as heat kink, and in Britain as buckling). In North America a rail broken due to cold-related contraction is known as a pull-apart.

To avoid this, welded rails are laid on concrete or steel sleepers, which are so heavy they hold the rails firmly in place. Great attention is paid to compacting the ballast effectively, particularly the shoulder over the ends of the sleepers, to prevent them from moving. Even so, in extreme weather, foot patrols monitor sections of track known to be problematic.

After new segments of rail are laid, or defective rails replaced (welded in), the rails are artificially stressed. The stressing process involves either heating the rails causing them to expand,[2] or stretching the rails with hydraulic equipment. They are then fastened (clipped) to the sleepers in their expanded form. This process ensures that the rail will not expand much further in subsequent hot weather. In cold weather the rails try to contract, but because they are firmly fastened, cannot do so. In effect, stressed rails are a bit like a piece of stretched elastic firmly fastened down.

Engineers try to heat the rail to a temperature roughly midway between the average extremes of hot and cold (this is known as the 'rail neutral temperature'). If temperatures reach outside normal ranges however, welded rail can buckle in a hotter than usual summer or can actually break in a colder than anticipated winter. In North America, because broken rails are typically detected by the signaling system they are seen as less of a problem than heat kinks which are not. For this reason, and because it is harder to break a rail than displace the trackbed, CWR is usually installed at a temperature of 90 °F (32 °C), to cope with rail temperature extremes of nearly 120 °F (49 °C) in the summer sun.

Joints are used in continuously welded rail when necessary; instead of a joint that passes straight across the rail, producing a loud noise and shock when the wheels pass over it, two sections of rail are sometimes cut at a steep angle and put together with a gap between them - a breather switch (referred to in Britain as an expansion joint). This gives a much smoother transition yet still provides some expansion room.

[edit] Fixing rail to ties

Track joint and chairs
Track joint and chairs
Rail spike with baseplate above the tie
Rail spike with baseplate above the tie
Pandrol clip
Pandrol clip
Sleeper-less track
Sleeper-less track

There are several methods used to fasten rail to wooden ties. The worldwide standard type of rail used today is flat-bottomed rail (Vignoles rail), which has a flat base and can stand upright without support. A flat-bottomed rail has a cross-section like that of an upside-down 'T' and is usually held to the sleeper with a tie plate (baseplate), a metal plate attached to the sleeper; although for lower cost construction flat bottom rails can be laid directly onto the sleepers.

Modern sleepers can be made of reinforced concrete and pressed steel, with rubber pads inserted between the sleeper and rail. This is done for two reasons: to give a smoother ride and to prevent the sleeper from shorting the track circuit, a low voltage passed through the rails for signalling purposes. This is different from a "traction current," which powers electric trains.

[edit] Spikes

A rail spike is a large nail with an offset head that is used to secure rails or fishplates (or baseplates) to ties in the track. Spikes are driven into wooden ties either by hammering them with a spike hammer by hand, or in an automated fashion with a spiker.

Spikes are cheaper and simpler to install than other methods but can loosen if the tie rots, much more easily than the British chair (a type of baseplate) does. An alternate method is the use of large wood screws, also called lag screws.

[edit] Chairs

In traditional British practice, cast metal chairs were screwed to the sleepers, which took a style of rail known as bullhead that was somewhat figure-8 in cross-section — wider at top and bottom (known as the head and foot respectively) and smaller in the middle (the web). Keys (wedges of wood or sprung steel) were then driven in between chair and rail to hold it in place. This was common practice on British railways until the 1950s, but is now largely obsolete[3].

The idea behind bullhead rails was that because both the top and bottom of the rails were the same shape, when one side of the rail became worn, the rail could be turned over to the unused side, thus extending the rail's lifespan. However the bottom head turned out to get dented, rendering the original idea useless. Since the turnover requirement was no longer needed, bullhead rails came to have a flat base (narrower than flat-bottomed rail), and the top part has curved edges that fit the profile of the train wheels.

[edit] Clips

A variety of different types of heavy-duty clips are used to fasten the rails to the underlying baseplate, one common one being the Pandrol fastener (Pandrol clip), named after its maker, which is shaped like a sturdy, stubby paperclip.[1], [2] and [3]. Another one is the Vossloh Tension Clamp.[4]

[edit] Sleeperless track

In recent years, methods have been developed to put tracks on concrete without using conventional sleepers or track ballast. While this method's construction cost is high, this system is expected to have significantly lower maintenance cost than conventional tracks. It is mainly used on high-speed lines and in tunnels, where maintenance access is difficult and where the track is subject to fewer climatic stresses (such as rain and temperature fluctuation).

See Tubular Modular Track.

[edit] Track maintenance

Maintenance of way equipment in Italy.
Maintenance of way equipment in Italy.
See also: Maintenance of way

Track needs frequent maintenance to remain in good order; the frequency increases with higher-speed or heavier trains. Without frequent maintenance, a Slow Order in American terminology, a "slack" or speed restriction in the United Kingdom, may have to be imposed due to damage on the tracks. (see Slow zone). Track maintenance was formerly hard manual labour, requiring teams of labourers (US: gandy dancers, GB: platelayers or navvies), who used levers to force rails back into place on steep turns, correcting the gradual shifting caused by the centripetal force of passing trains. Currently, maintenance is facilitated by a variety of specialised machines.

The profile of the track is maintained by using a railgrinder.

Common maintenance jobs include spraying ballast with weedkiller to prevent weeds growing through and disrupting the ballast. This is typically done with a special weedkilling train.

Over time, ballast is crushed or moved by the weight of trains passing over it, and periodically it needs to be levelled (tamped) and eventually cleaned or replaced. If this is not done, the tracks may become uneven causing swaying, rough riding and eventually the risk for derailment.

Rail Inspections utilize nondestructive testing methods to detect internal flaws in the rails. This is done by using specially equipped HiRail trucks, inspection cars, or in some cases handheld inspection devices.

Broken or worn-out rails also need replacing periodically. Mainline rails that get worn out usually have life left in branch line or rail siding use and are "cascaded" to those branch lines.

The environmental conditions along railroad tracks create a unique ecosystem. This is particularly so in the United Kingdom where steam locomotives are no longer used and vegetation has not been trimmed back so thoroughly. This, however, creates a problem for steam-hauled "heritage" trains in prolonged dry weather.

[edit] Gauge

Measuring rail gauge
Measuring rail gauge
Main article: Rail gauge

During the early days of rail there was considerable variation in the gauge used by different systems. Today, sixty percent of the world's railways use a gauge of 4 ft 8½ in (1,435 mm), which is known as the standard or international gauge. Gauges wider than standard gauge are called broad gauge, those smaller than standard narrow gauge. Some stretches of track are dual gauge, with three (or sometimes four) parallel rails in place of the usual two, to allow trains of two different gauges to share the same track.[4]

[edit] U.S. track classes

In the United States, the Federal Railroad Administration has developed a system of classification for track quality.[5] [6] The class a track is placed in determines speed limits and the ability to run passenger trains.

  • Excepted track. Only freight trains are allowed to operate on this type of trackage, and they may run at speeds up to 10 mph (16 km/h). Also, no more than five cars loaded with hazardous material may be operated within any single train. Passenger trains of any kind are prohibited, including chartered excursions and fantrips.
  • Class 1 track is the lowest class allowing the operation of passenger trains. Freight train speeds are still limited to 10 mph (16 km/h), and passenger trains are restricted to 15 mph (24 km/h).
  • Class 2 track limits freight trains to 25 mph (40 km/h) and passenger trains to 30 mph (48 km/h).
  • Class 3 track limits freight trains to 40 mph (64 km/h) and passenger trains to 60 mph (97 km/h).
  • Class 4 track limits freight trains to 60 mph (97 km/h) and passenger trains to 80 mph (130 km/h).
  • Class 5 track limits freight trains to 80 mph (130 km/h) and passenger trains to 90 mph (140 km/h).
    • The only Class 5 track operated by a freight railroad are parts of the BNSF Railway Chicago–Los Angeles mainline, the old Santa Fe main, upon which ATS equipped passenger trains such as Amtrak's Southwest Chief can operate at up to 90 mph (140 km/h). This is gradually being reduced to Class 4 as the train stop system is retired.[citation needed]
  • Class 6 limits freight trains and passenger trains to 110 mph (180 km/h).
  • Class 7 limits all trains to 125 mph (201 km/h).
  • Class 8 limits all trains to 160 mph (260 km/h).
    • Portions of the Northeast Corridor are the only Class 8 trackage in North America allowing for 135 mph (217 km/h) and 150 mph (240 km/h) operation.[citation needed]
  • Class 9 trackage limits all trains to 200 mph (320 km/h).
    • There is currently no Class 9 trackage.

In addition to class, maximum track speed is also subject to specific regulatory restrictions known as rules. The rule governing the maximum permissible speed of a train operating on curved track is determined by the following formula:

V_{max}=\sqrt{\frac{E_a + 3}{0.0007d}}

where Ea is the amount in inches that the outside rail is superelevated above the inside rail on a curve and d is the degree of curvature in degrees per 100 feet (30 m). Vmax is given in miles per hour.

Track lubrication on a reverse curve in an area prone to movement due to wet beds.
Track lubrication on a reverse curve in an area prone to movement due to wet beds.

Track unbalanced superelevation in the U.S. is restricted to 3 inches (76 mm), though 4 inches (100 mm) is permissible by waiver. There is no hard maximum set for European railways, some of which have curves with over 11 inches (280 mm) of unbalanced superelevation to permit high-speed transportation.[7]

Generally the aim is for trains to run without flange contact, which also depends on the tyre profile of the wheels. Allowance has to be made for the different speeds of trains. Slower trains will tend to make flange contact with the inner rail on curves, while faster trains will tend to ride outwards and make contact with the outer rail. Either creates wear and may lead to derailment. Many high speed lines do not permit the use of slower freight trains, particularly with heavier axle loads. In some cases, problems are alleviated by the use of flange lubrication.

[edit] Other types

See also: Wagonway and Plateway

In the early years of railways, there was much experimentation with rails and sleepers and fixtures, before the better designs emerged.

Wooden rails with a metal strap on top was tried to save costs, but the straps had a tendency to come loose and penetrate the carriages going over them. These were commonly known as "snakeheads".

"Pole Roads" were used in past American logging operations in place of the more expensive standard railroad. They consisted of wooden poles laid end to end and parallel to each other in place of the steel rails. Locomotives and rolling stock on pole roads used concave wheels (double flanged) as opposed to the single flange used on most railway lines. Fordson tractors were often converted into pole road locomotives. The major setback to these lines was that the primitive (often home-made) locomotives tended to derail on curves.

The "flangeway" was an early type of railway, the rails of which were equipped with a flange, while the locomotives and rolling stock that ran on it had wheels with plain rims. However switches/turnouts were very primitive, and high speeds could not be achieved, thus leading to the demise of the flangeway and the rise of today's "edgeway".

Barlow rail had a wide cross section to spread the load, but the rail itself tended to spread and go out of gauge. [8] There are some examples in the Powerhouse Museum in Sydney. [9] [10]

Brunel's Great Western Railway used longitudinal sleepers, with piles to hold the track down, but as the earthworks settled, the piles came to hold the track up. "Bridge Rail" was originally used; this is somewhat similar to Barlow rail mentioned above, only squarer and perhaps thicker. [11]

[edit] References

[edit] Further reading

  • Pike, J., (2001), Track, Sutton Publishing, ISBN 0-7509-2692-9
  • Firuziaan, M. and Estorff, O., (2002), Simulation of the Dynamic Behavior of Bedding-Foundation-Soil in the Time Domain, Springer Verlag.

[edit] See also

Wikimedia Commons has media related to:

[edit] External links