Portslade railway station

From Wikipedia, the free encyclopedia

Portslade
Location
Place Portslade
Local authority Brighton & Hove
Operations
Station code PLD
Managed by Southern
Platforms in use 2
Live departures and station information from National Rail
Annual Rail Passenger Usage
2004/05 * 0.607 million
2005/06 * 0.630 million
History
Key dates Opened 12 May 1840
National Rail - UK railway stations

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z  

* Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Portslade from Office of Rail Regulation statistics.
Portal:Portslade railway station
UK Railways Portal

Portslade railway station (in full, Portslade & West Hove station) is a railway station serving the town of Portslade-by-Sea in East Sussex, but located on the western fringes of the village of Aldrington (a part commonly known as 'West Hove').

Contents

[edit] Services

The station is operated by Southern and is on the West Coastway Line just outside of Brighton. The standard Monday-Saturday off-peak service consists of 5 trains per hour in each direction:

Eastbound

Westbound

On Sundays this is reduced to:

  • 2 tph to Brighton, calling at Aldrington and Hove
  • 1 tph to Portsmouth Harbour,
  • 1 tph to Littlehampton,
  Preceding station     National Rail     Following station  
Aldrington   Southern
West Coastway Line
  Fishersgate

[edit] Future developments

The Thameslink 2000 project (now known as the Thameslink Programme) contains proposals to extend the Thameslink network to various additional routes in southern England; one of these would be the section of the West Coastway line between Hove and Littlehampton, with services running via the Cliftonville Curve from the Brighton Main Line. This will see services that currently terminate at London Bridge continuing through Central London and north wards via the Midland Main Line or East Coast Main Line to destinations such as Luton or Cambridge. This however is not imminent, a Department for Transport whitepaper states only that "the Thameslink Programme will be completed by the end of 2015" and that "interim outputs will be delivered by the end of 2011"[1].


[edit] Gallery

[edit] References

  1. ^ Delivering a Sustainable Railway - White Paper CM 7176. Department for Transport (2007). Retrieved on 2007-07-24.

[edit] External links

Coordinates: 50°50′08″N, 0°12′20″W