Image talk:Portmeirion.750pix.jpg
From Wikipedia, the free encyclopedia
I removed this irrelevant text from the image description. How did it get there? -- Heron
- "The upper reservoir (Llyn Stwlan) and dam of the Ffestiniog Pumped Storage Scheme in north Wales. The four water turbines at the lower power station can generate 360 MW of electricity within 60 seconds of the need arising.
- Taken by Adrian Pingstone in 1988 and released to the public domain."