Plauen–Cheb Line
From Wikipedia, the free encyclopedia
Plauen–Weischlitz–Bad Brambach–Cheb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Route Number: | DB 544 ČD 147 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number: | 6270; sä. PE | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length: | 73,938 km | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Gauge: | 1435 mm | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Voltage: | Vojtanov–Cheb: 25 kV 50 Hz ~ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum incline: | 17 ‰ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Minimum radius: | 182 m | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum speed: | 100 km/h | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Plauen–Cheb Line is a mainline railway in Saxony, Germany and the Czech Republic, which was originally built and operated by the Kgl. Sächsischen Staatseisenbahnen. It runs from Plauen im Vogtland through Weischlitz, Adorf und Bad Brambach over the national border to Cheb (also known as Eger).
Contents |
[edit] History
[edit] Planning and Construction
The origins of the present mainline between Plauen–Cheb stem from the Vogtländischen Staatseisenbahn von Herlasgrün through Falkenstein/Vogtl. and Oelsnitz to Eger, which opened in November 1865. A direct track from Plauen to Bohemia was planned, and in October 1871 work started on the tracks from Plauen to Oelsnitz.
To solve the height difference between the Sächsisch-Bayrischen Eisenbahn and the valley bottom of the Weißen Elster much earth working was needed. In Plauen a large arched viaduct ewas constructed over the Syra, and on the 1st November 1874, the twin tracked section was opened.
[edit] Operation
The section from Plauen–Eger developed into the most important route from Mitteldeutschland and Thüringen to Bohemia. The Express Trains from Dresden–München used the tracks as it was shorter than the route through Hof. After the First World War when Czechoslavakia was formed, the whole line remained in the control of the Kgl. Sächsischen Staatseisenbahnen and the subsequent Deutsche Reichsbahn.
[edit] During World War 2
After the Anschluss or annexation of Sudetenland in autumn 1938 the Voitersreuth -Franzenbad section became double track.
At the end of the Second World War, the line was the target of heavy American bombing. On 8th April 1945, the station at Cheb was severly bombed so that rail traffic was no longer possible. Photographs from May 1945 show the impact of the bomb explosions and the severly damaged locomotives. On the 12th April 1945 the Eger viaduct was damaged. Till the end of the war the Plauen Obere Bahnhof was attacked and almost totally destroyed.
[edit] Post War
At the end of the war on 9. Juli 1945, the section in the Czech Republic passed over to the Tschechoslowakische Staatsbahn ČSD. No compensation was received. The tracks in the German section were given as war reparations to the Soviet Union, and the second track was removed. The Eger viaduct was replaced with a temporary bridge which remained in place until 19th May 1951 when the bridge had been rebuilt.
Cross border goods traffic resumed in 1957, and passenger trains in the Czech section between Plesná (previously Fleißen) and Cheb. From the start of the 1960s crossborder passenger trains resumed, then an express DR Baureihe VT 18.16 Karlex from Berlin to Karlsbad. The goods traffic regained its importance, and the ČSD build a new border station at Vojtanov.
From the beginning of the 1990s the Czech section was electrified to the normal Nordwestböhmen standard of 25 kV 50 Hz. The tracks between Vojtanov and Cheb went live 17th October 1983. The Deutsche Reichsbahn began to double the tracks in the 1970s, and the section Pirk–Adorf and Raun–Bad Brambach were completed by the end of the 1980s. Though the line is principally used by Regional Express trains there is still a need for some goods traffic. Since 1997 Vogtlandbahn has operated local trains from Zwickau–Bad Brambach, and from 2000 the trains have run over the Czech border to Cheb serving all the intermediate stations.
RegionalExpress-trains of the Deutschen Bahn ran from Leipzig to Bad Brambach, but on the introduction of the Karlex, in the mid 1990s there is no longer a need for this service.
[edit] Future developments
During the 1990s, restoring the the second track through Bad Bambrach was discussed and in the long term this may happen. Similarly, it is possible that the line may be electrified- this was tied to the Leipzig City-Tunnel scheme.
[edit] Description of the route
From the Oberer Bahnhof (station) in Plauen, the route uses the tracks of the Leipzig–Hof Line and passes over the Syratalbrücke and reaches the halt on the site of the former Plauen West station. There are seven stations and halts in Plauen, that before July 2008 was not in the Vogtlandkreis. From Kürbitz the tracks run alongside the Elstertalbahn as far as Weischlitz then follows the Weißen Elster under the motorway bridge that carries the Bundesautobahn 72.
From Pirk station, the section becomes doubled tracked, it passes through Oelsnitz/Vogtl. and on to Adorf/Vogtl. where it joins the tracks of the Chemnitz-Aue-Adorf Line. At Bad Elster the track bed leaves the Elstertal and swings through a series of tight curves through the Mittelgebirgs landscape of the Elstergebirge. Shortly before Bad Brambach the line passes in and out of Czech territory.
Shortly after Bad Brambach station the tracks cross the Czech border again and reach the Czech station of Plesná, and again pass over to Germany on the south side of the Kapellenberg hills. On a constant gradient the line descends into the Czech border station of Vojtanov. From here , the section is electrified. Shortly after the station there is a junction with the lines from Aš which formed the Cheb–Oberkotzau Line.
More important is the station at the famous spa town of Franzenbad, from here there is a express train to Prague and on into Slovakia.
Shortly before the final station in Cheb, the line passes over the imposing Eger viaduct one of the largest bridge works of the Kgl. Sächs. Staatseisenbahnen.
[edit] Literature
- Erich Preuß, Rainer Preuß: Sächsische Staatseisenbahnen. transpress Verlagsgesellschaft mbH, Berlin, 1991
[edit] References
This article is sourced from German Wikipedia