Orgreave Colliery platform
From Wikipedia, the free encyclopedia
Orgreave Colliery platform was a workman's halt built to serve the miners working at the colliery. These workmen's trains or "Paddy Mails" were operated between Sheffield Victoria and Treeton Colliery at shift change times being hauled along the main line to Orgreaves Colliery Sidings (the extra 's' being added by the railway in error but never corrected) where the main line locomotive was exchanged for one belonging to the colliery company.
The platform was situated at the bottom of an incline with a gradient of approx. 1 in 27 to be climbed to reach the main line with the return trains. It was often the case that the train was reversed a short distance to more level track to give it a run at the gradient.
The "Paddy Mails" ceased running in May 1932 due to parts of the bridges between Orgreave and Treeton being washed away when the River Rother flooded. The line was repaired but the "Paddy Mails" were not re-introduced, being replaced by "Pit Buses" operated by Sheffield Corporation along the main routes from the city centre and the local area.
One of the "Paddy Mails" was involved in an accident on 13 December 1926.