Operation Noah (Kariba)
From Wikipedia, the free encyclopedia
This article or section needs sources or references that appear in reliable, third-party publications. Primary sources and sources affiliated with the subject of the article are generally not sufficient for a Wikipedia article. Please include more appropriate citations from reliable sources, or discuss the issue on the talk page. This article has been tagged since April 2008. |
This article needs additional citations for verification. Please help improve this article by adding reliable references. Unsourced material may be challenged and removed. (April 2008) |
Operation Noah was a wildlife rescue operation in Rhodesia (Zimbabwe) lasting from 1958 to 1964.
In the late 1950s, Rhodesia (Zimbabwe) became home to the world’s largest man-made dam - a hydroelectric power station built across the Zambezi River, about 400km from Victoria Falls. It would provide power for most of the country, but in the process form Lake Kariba and flood the Zambezi Valley – home to thousands of native animals. In a wildlife rescue operation lasting 5 years, over 6000 animals were rescued and relocated to the mainland.[1]