Operation Noah (Kariba)

From Wikipedia, the free encyclopedia

Operation Noah was a wildlife rescue operation in Rhodesia (Zimbabwe) lasting from 1958 to 1964.

In the late 1950s, Rhodesia (Zimbabwe) became home to the world’s largest man-made dam - a hydroelectric power station built across the Zambezi River, about 400km from Victoria Falls. It would provide power for most of the country, but in the process form Lake Kariba and flood the Zambezi Valley – home to thousands of native animals. In a wildlife rescue operation lasting 5 years, over 6000 animals were rescued and relocated to the mainland.[1]

[edit] Notes

[edit] See also